1. KHAI THÁC ĐIỀU KHIỂN PAINPOINT
Operating a premium stone quarry in Lagos presents distinct profitability challenges. Inconsistent block sizing leads to significant material waste, directly eroding margins on highvalue granite and marble. Frequent equipment downtime, exacerbated by abrasive aggregate and humid conditions, disrupts delivery schedules to critical infrastructure and luxury development projects. Hơn nữa, inefficient primary fragmentation often produces excessive fines, downgrading material from blockgrade to lowervalue aggregate. Are you managing escalating maintenance costs on older machinery? Is your yield of premium, dimension stone falling short of potential? The solution lies in precisionengineered equipment designed for the specific demands of a luxury quarry site.
2. TỔNG QUAN SẢN PHẨM: HIGHPRECISION DIMENSION STONE DRILLING & CUTTING SYSTEMS
This product category encompasses trackmounted, hydraulic drilling systems and diamondwire saws engineered for the precise extraction of block stone. The operational workflow is optimized for quality: 1) Precise hole drilling along planned block boundaries using GPSguided positioning. 2) Insertion of hydraulic splitting systems or deployment of diamond wire loops. 3) Controlled separation of the block from the bedrock mass. 4) Onsite primary trimming to reduce transport weight. 5) Safe lifting and staging for transport. These systems are specifically designed for hard rock formations like granite and marble found in premium Lagos quarries but are not intended for unconsolidated or heavily fractured rock masses.
3. TÍNH NĂNG CỐT LÕI
GPSGuided Drill Alignment | Cơ sở kỹ thuật: RTK (RealTime Kinematic) Định vị | Lợi ích hoạt động: Your operators achieve borehole alignment accuracy within ±2cm, enabling precise block planning and minimizing kerf loss. | Tác động ROI: Dữ liệu hiện trường cho thấy một 1525% increase in recoverable block volume per bench, directly boosting revenue from highticket stone.
Ổ tần số thay đổi (VFD) Power Units | Cơ sở kỹ thuật: Electrohydraulic systems with intelligent power management | Lợi ích hoạt động: Drills and saws automatically adjust torque and speed to match rock hardness, reducing stress on cutting components and diamond segments. | Tác động ROI: Thử nghiệm trong ngành chứng tỏ một 30% extension in consumable life (mũi khoan, wire beads) và một 20% reduction in energy consumption per cubic meter extracted.
Modular Dust Suppression System | Cơ sở kỹ thuật: Integrated fogging nozzles with particulate filtration | Lợi ích hoạt động: Actively captures silica dust at the drill head or cut point, maintaining regulatory compliance and protecting workforce health in Lagos’s operational environment. | Tác động ROI: Mitigates risk of work stoppages due to environmental noncompliance and reduces longterm equipment wear from abrasive dust ingress.
HeavyDuty Track Undercarriage | Cơ sở kỹ thuật: Reinforced steel tracks with high flotation pads | Lợi ích hoạt động: Cung cấp ổn định, level operation on uneven quarry floors and ensures minimal ground pressure for maneuvering near fragile block edges without causing subsurface damage. | Tác động ROI: Enables continuous operation across wetseason site conditions, protecting against downtime.
Bôi trơn tập trung & Điểm giám sát | Cơ sở kỹ thuật: Automated lubrication circuits with visual inspection ports | Lợi ích hoạt động: Your maintenance team can perform essential servicing in minutes without complex disassembly, ensuring bearing and pivot longevity despite high particulate exposure. | Tác động ROI: Giảm thời gian bảo trì theo lịch trình lên tới 40% and prevents costly unscheduled failures.
4. LỢI THẾ CẠNH TRANH
| Chỉ số hiệu suất | Tiêu chuẩn ngành | Luxury Quarry Solution | Lợi thế (% sự cải tiến) |
| : | : | : | : |
| Block Recovery Rate (đá granit) | 1822 m³/100m³ bench volume | 2528 m³/100m³ bench volume | +27% |
| Average Diamond Wire Life (Marble) | 1215 m²/meter of wire | 1822 m²/meter of wire| +40% |
| Thời gian trung bình giữa các lần thất bại (MTBF) | ~450 giờ hoạt động| >650 giờ hoạt động| +44% |
| Fuel Consumption per m³ Extracted| ~3.5 liters/m³| ~2.7 liters/m³| 23% |
| Thời gian thiết lập/di dời (per cut line)| 4560 phút| 2535 phút| 42% |
5.THÔNG SỐ KỸ THUẬT
Công suất cắt sơ cấp: Diamond wire saws compatible with blocks up to 5m x 5m x 3m (LxWxH). Drill rigs capable of Ø90mm Ø140mm holes to depths of 20m.
Yêu cầu về nguồn điện: Dieselhydraulic power pack standard; electric drive options available (250400 kVA requirement).
Thông số vật liệu: Main structural components use Hardox 450 thép; hydraulic hoses rated for SAE100R2AT standard.
Kích thước vật lý: Typical trackmounted unit footprint of 4m (L) x 2,5m (W), transport weight approx. 14,000 kg.
Phạm vi hoạt động môi trường: Designed for ambient temperatures of 10°C to 45°C and up to 95% độ ẩm tương đối.
6\. KỊCH BẢN ỨNG DỤNG
Premium Granite Quarrying for Architectural Cladding | Thử thách: A major quarry supplying blue pearl granite faced inconsistent block sizes due to manual drill alignment, dẫn đến hơn 30% waste during secondary processing at the factory.| Giải pháp: Implementation of a GPSguided track drill system for primary fragmentation and perimeter hole drilling.| Kết quả: Achieved a documented block yield increase of 22%. Waste at the factory slab plant decreased by an estimated 18%, leading to a calculated project ROI within 14 tháng.

LargeScale Marble Extraction for Luxury Interiors | Thử thách: Excessive vibration from conventional drilling was causing subsurface fracturing in prized white marble veins, downgrading large sections of material.| Giải pháp: Deployment of a hightorque, lowvibration drill rig paired with diamond wire saws for final separation.| Kết quả: The incidence of hidden fractures dropped by over 60%. The quarry reported a 35% increase in the volume of GradeA marble blocks suitable for largeformat tiles and slabs.
7\. CÂN NHẮC THƯƠNG MẠI
Equipment is offered in three capability tiers:
Cấp A (EntryPrecision): Manual alignment drills with core durability features.
Cấp B (Recommended Standard): Semiautomated GPSguided drills with full feature suite.
Cấp C (HighProduction): Fully automated multidrill setups with remote monitoring.
Optional features include laserassisted leveling, remote diagnostic telematics packages, and custom wire saw pulley configurations.Financing options include straight capital purchase,saleandleaseback arrangements,and productionlinked lease agreements.Service packages range from basic scheduled maintenance to comprehensive fullsite coverage including partsand labor.
8\. Câu hỏi thường gặp
Q1: Is this equipment compatible with our existing excavatorsand loaders?
A1: Yes.The drillingand cutting systems are standalone units.They interfacewith standard quarry logistics; no modificationsto your existing loading or hauling fleet is required.
Q2:What is the typical implementation timeline from purchase to full operation?
A2:Phụ thuộc vào cấu hình,factory acceptance testing typically requires810 weeks.Onsite commissioningand operator training by our certified engineers is completed within57 working days.
Q3:What kindof operator trainingis provided?
A3:A comprehensive program includes classroom instructionon system principlesand safety,followedby handson supervised operation.We certify your key personnelfor routine operationand maintenance.
Q4:Canyou quantify the expected reductionin secondary processing costs?
A4:Clients report that more uniformblock dimensions directly reduce factory sawingand polishing time per cubic meter.Field data indicates secondary processing efficiency gains between10%and18%.
Q5:What arethe payment termsfor capital purchase?
A5 Standard termsare30% down payment upon order confirmation60% against shipment proofand10% upon successful commissioning.A varietyof structured finance solutionsare also availableto preservecapital liquidity