Vende guroresh në Lagos Kuotim i eksportuesit - Kompania KefidGroup

Vende guroresh në Lagos Kuotim i eksportuesit

Përshkrimi i shkurtër:

1. PAINPOINT DRIVEN OPENING Managing a quarry site in Lagos presents distinct operational hurdles that directly impact profitability and project timelines. Are you contending with the high cost and logistical complexity of transporting crushed aggregates across the metropolis? Is inconsistent feed material from your face shovel causing crusher jams and excessive wear on your liners?…


Detajet e produktit

Etiketat e produktit

1. HAPJE NGA PIKA E DIKIMIT

Managing a quarry site in Lagos presents distinct operational hurdles that directly impact profitability and project timelines. Are you contending with the high cost and logistical complexity of transporting crushed aggregates across the metropolis? Is inconsistent feed material from your face shovel causing crusher jams and excessive wear on your liners? Are you losing valuable production time to manual sorting and prescreening, while fuel costs for mobile equipment continue to erode your margins? These challenges—escalating transport logistics, unpredictable feed quality, and inefficient material handling—are common constraints on Lagos quarry operations. Zgjidhja nuk qëndron vetëm te pajisjet, but in strategic site planning and optimized primary processing. This content addresses how a wellengineered primary quarry plant setup can mitigate these specific issues.

2. PËRMBLEDHJE E PRODUKTIT

A stationary primary quarry crushing and screening plant is an integrated processing system designed for the initial size reduction and classification of blasted rock at the extraction site. For operations in Lagos, this setup is engineered to handle local granite, gur gëlqeror, dhe lateriti, transforming runofquarry (ROQ) rock into specified aggregate fractions.

Rrjedha e punës operative:
1. Ushqimi Primar & Para-Screening: Dump trucks deposit ROQ material into a vibrating grizzly feeder (VGFF VGF), i cili heq gjobat natyrale dhe anashkalon materialin subsize.
2. Thërrmimi primar: Oversize material is conveyed to a robust primary jaw crusher for initial compression breaking.
3. Thërrmimi sekondar & Shqyrtimi: Crushed output is routed to a secondary cone crusher for further reduction, then to a multideck vibrating screen for precise classification.
4. Grumbullimi i rezervave: Sized aggregates (p.sh., ¾”, ½”, pluhuri) are conveyed to designated stockpiles for direct loading or further processing.

Fusha e Aplikimit & Kufizimet:
Fushëveprimi: Ideal for mediumtolarge scale quarry operations targeting consistent production of construction aggregates (granit, gur gëlqeror). Suitable for integration with asphalt or concrete batching plants onsite.
Kufizimet: Kërkon të qëndrueshme, terren i përgatitur për instalim. Initial capital investment is significant compared to purely mobile setups. Optimal efficiency is achieved with consistent feed over extended periods, making it less suitable for very small or frequently relocated sites.

3. TIPARET THEMELORE

Ushqyes Grizzly vibrues HeavyDuty (VGFF VGF) | Baza Teknike: Mekanizëm vibrues me inerci të lartë me shufra grizzly të rregullueshme | Përfitimi Operacional: Heq gjobat para shtypjes, zvogëlon ngarkesën dhe konsumin e thërrmuesit, prevents hopper bridging | Ndikimi i ROI: Zgjat jetën e astarit të thërrmuesit deri në 30%, reduces fuel consumption by optimizing crusher workload

Primary Jaw Crusher with Wedge System | Baza Teknike: Manganese steel jaws with hydraulic adjustment and toggle tensioning | Përfitimi Operacional: Doreza të mëdha, irregular slabs of Lagos granite without clogging; allows quick CSS adjustment for product size changes | Ndikimi i ROI: Minimizon kohën e ndërprerjes për ndryshimet e madhësisë; high reduction ratio decreases load on downstream circuits

Vende guroresh në Lagos Kuotim i eksportuesit

Grasimi i centralizuar & Sistemi i kontrollit PLC | Baza Teknike: Automated lubrication points linked to a programmable logic controller with fault diagnostics | Përfitimi Operacional: Ensures critical bearings receive timely lubrication in dusty conditions; provides operators with realtime monitoring of plant functions | Ndikimi i ROI: Parandalon dështimet katastrofike të kushinetës; reduces manual maintenance time by an estimated 15 orë në javë

Vende guroresh në Lagos Kuotim i eksportuesit

Modular Conveyor System with Chevron Belting | Baza Teknike: Interlocked conveyor modules with highgrip belting for steep inclines | Përfitimi Operacional: Efficiently moves material between stages with minimal spillage, even in wet conditions common during Lagos rainy seasons | Ndikimi i ROI: Lowers rehandling costs and preserves site cleanliness; belt design reduces rollback, improving throughput

SoundAttenuated Enclosures & Shtypja e pluhurit | Baza Teknike: Canopy panels with acoustic insulation and strategically placed water spray nozzles | Përfitimi Operacional: Significantly reduces operational noise and dust emissions at transfer points | Ndikimi i ROI: Facilitates compliance with local environmental guidelines, minimizing risk of operational delays due to complaints.

4. PËRPARËSITË KONKURRETARE

| Metrikë e performancës | Standardi i Industrisë (Njësitë e lëvizshme) | Stationary Quarry Plant Solution | Avantazhi (% përmirësim) |
| : | : | : | : |
| Tonnage Processed per Litre of Fuel| ~5060 tonnes/litre (multiple unit movements) | ~90110 tonnes/litre (conveyorbased transfer) | +80% efikasiteti |
| Konsistenca e produktit (Gradim)| Varies due to frequent relocation/ setup changes| Consistent ±5% tolerance on spec aggregates| +70% qëndrueshmëri |
| Liner Wear Life in Primary Stage| Subject to more direct impact from unscreened fines| Extended life due to effective grizzly prescreening| +30% jetëgjatësi |
| Koha e konfigurimit/zhvendosjes| 12 days per major move| 710 days for initial installation (semipermanent)| 75% mobility but +95% stabiliteti |

5. SPECIFIKIMET TEKNIKE

Kapaciteti i projektimit: 150 350 ton në orë (configurable based on crusher model).
Kërkesa primare e energjisë: 200 400 kVA grid connection or equivalent diesel generator set.
Specifikimet e materialit: Fabrikuar nga çeliku strukturor S355JR; abrasionresistant steel liners at highwear points; Grade III manganese steel crusher jaws.
Dimensionet kryesore fizike: Typical footprint of 40m (L) x 18 m (W). Feed hopper height: 4.5m.
Gama e funksionimit të mjedisit: Projektuar për temperaturat e ambientit nga 20°C deri në 45°C; lagështia deri në 90%; Vlerësimi i mbrojtjes nga pluhuri i IP55 në komponentët elektrikë.

6. Skenarët e APLIKIMIT

Granite Aggregate Production for Lagos Road Projects | Sfida: A quarry supplying base materials for a major highway experienced trucking bottlenecks and inconsistent product gradation using standalone mobile crushers, leading to rejected loads.| Zgjidhje: Implementation of a fixed primary quarry plant near the extraction face with integrated screening.| Rezultatet: Onsite stockpiling eliminated truck queues at the face. Consistent product quality reduced rejection rate from ~12% to under 2%. Projected payback period from transport savings alone was under 24 muaj.

Integrated Concrete Block Making Operation | Sfida: A block manufacturer sourcing crushed stone faced volatile pricing and quality from thirdparty suppliers, disrupting batching formulas.| Zgjidhje: Establishment of a captive quarry using a compact primary jawandscreen plant dedicated to producing specific aggregate sizes for block mixes.| Rezultatet: Secured control over raw material cost and supply continuity. Arriti a 25% reduction in aggregate input costs while improving block compressive strength consistency by 15%.

7. KONSIDERATA TREGTARE

Nivelet e çmimeve: Solutions are typically configured projectbyproject.
EntryLevel Setup: Primary jaw crusher with basic screen and conveyors (~$250,000 $400,000).
Uzina e prodhimit standard: As described in overview with secondary crusher (~$500,000 $850,000).
HighCapacity/Tertiary Configuration: Includes additional crushing stage for manufactured sand (~$1M+).

Karakteristikat opsionale: Kabinat e kapsulimit të pluhurit, automated metal detection/removal systems, advanced rock breaker systems at feed hopper, telematika e monitorimit në distancë.

Paketat e Shërbimit: Ekzistojnë kontrata të niveleve vjetore të mirëmbajtjes që mbulojnë inspektimet e planifikuara, ndërrimet e astarit, dhe mbështetje teknike prioritare.

Opsionet e financimit: Equipment leasing structures through partnered financial institutions or milestonebased project financing can be explored to align capital expenditure with cash flow from project contracts.

8. FAQ

Q1: Is this plant compatible with our existing excavators and haul trucks?
po. The receiving hopper and feeder are engineered to accommodate standard quarry haul truck discharge heights and volumes used in Lagos operations.

Q2: What is the expected impact on our daily operational manpower?
Field data shows that an automated stationary plant typically requires one dedicated loader operator for the feed hopper and one control room operator overseeing the entire circuit—often resulting in a net reduction or redeployment of labor compared to managing multiple mobile units.

Q3: How do we handle power instability common in some areas?
Plants can be supplied either for direct grid connection or can be paired with a suitably sized diesel generator package designed for continuous industrial duty cycles.

Q4: What are the commercial terms regarding delivery and commissioning?
Supply terms are typically CIF Apapa Port Incoterms® 2020. Comprehensive commissioning supervision by our engineers is included in the purchase price, encompassing assembly supervision, mechanical alignment checks, test running training your operators.

P5:What is the lead time from order placement until operational commissioning at our Lagos site?
Lead times vary by configuration complexity but generally range between 1422 weeks exworks factory inspection followed by approximately shipping transit time plus two weeks minimum site erection period supervised by our engineers who will remain until final performance tests have been completed successfully together

Lini Mesazhin Tuaj

Shkruani mesazhin tuaj këtu dhe na dërgoni

Lini Mesazhin Tuaj