Import 500 Tph Gold Mining Washing Plant Specification - Kompania KefidGroup

Import 500 Tph Gold Mining Washing Plant Specification

Përshkrimi i shkurtër:

1. PAINPOINT DRIVEN OPENING Are you scaling your gold mining operation and finding your material washing process is the bottleneck? Inefficient scrubbing and classification directly impact recovery rates and profitability. Common challenges with highcapacity plants include: Trajtimi i paqëndrueshëm i ushqimit: Fluctuations in clay content or particle size can choke standard scrubbers, leading to frequent downtime for…


Detajet e produktit

Etiketat e produktit

1. HAPJE NGA PIKA E DIKIMIT

Are you scaling your gold mining operation and finding your material washing process is the bottleneck? Inefficient scrubbing and classification directly impact recovery rates and profitability. Common challenges with highcapacity plants include:

Trajtimi i paqëndrueshëm i ushqimit: Fluctuations in clay content or particle size can choke standard scrubbers, leading to frequent downtime for unclogging and lost production hours.
Rikuperimi joefikas i gjobave: Poorly designed washing stages fail to liberate gold from fine clays, causing valuable material to report to tailings. Industry estimates suggest losses of 25% are common in suboptimal systems.
Kostot e larta operacionale: Excessive water consumption, high wear part replacement frequency on abrasive materials, and oversized power requirements erode your margin.
Limited Scalability: Modular plants that cannot maintain performance at true 500 TPH scale create logistical and operational complexities, forcing overinvestment in multiple smaller units.

Is your current setup maximizing recovery from complex alluvial or weathered deposits? Can your plant maintain specified throughput with variable, sticky feed material? The specification of your 500 TPH gold mining washing plant is critical to answering these questions.

2. PËRMBLEDHJE E PRODUKTIT

This specification details a heavyduty, modular 500 Fabrika e larjes së minierave të arit TPH, projektuar për të vazhduar, highvolume processing of alluvial, eluvial, and weathered hard rock deposits. The system is designed to scrub, break apart, madhësia, and upgrade feed material to produce a concentrated gravel product for downstream gold recovery (p.sh., llambat, centrifugat).

Rrjedha e punës operative:
1. Furnizimi primar & Pastrim: Runofmine (ROM) material is fed into a robust trommel scrubber or rotary scrubber, where intense attrition breaks down clay agglomerates and cemented matrices.
2. Përmasat & Klasifikimi: The scrubbed material is screened into distinct size fractions (p.sh., +10mm, 10mm+2mm, 2mm).
3. Menaxhimi i gjobave & Slurry Processing: The fine fraction (2mm) is routed to a series of hydrocyclones and spirals for desliming and primary gravity concentration.
4. Coarse Material Washing: Oversize material is further cleansed via vibrating or drum washers to remove any remaining contaminants.
5. Product Stacking & Menaxhimi i Ujit: Sized and upgraded products are stockpiled via conveyors, while process water is recirculated through a compact settling pond system.

Fusha e Aplikimit: Ideal for largescale placer operations, alluvial mining projects, and processing of lateritic saprolite deposits. Effective on materials with high clay content requiring aggressive attrition.

Kufizimet: Not a substitute for primary crushing of hard rock; feed size typically limited to 150mm. Performanca optimale kërkon furnizim adekuat me ujë (with closedloop recycling) and relatively flat installation terrain.

3. TIPARET THEMELORE

HighCapacity Trommel Scrubber | Baza Teknike: Variablespeed drum with internal lifters and highpressure spray bars | Përfitimi Operacional: Processes sticky clayladen feed without blinding; adjustable retention time optimizes breakup for varying material conditions | Ndikimi i ROI: Reduces downtime from clogging by an estimated 70%, ensuring consistent 500 Rrjedha e TPH.
Modular PrePlumbed Design | Baza Teknike: Bolttogether skidmounted modules with integrated piping and walkways | Përfitimi Operacional: Redukton kohën e instalimit në vend deri në 60%, minimizes civil works cost, and allows for future plant reconfiguration or relocation | Ndikimi i ROI: Faster commissioning translates to earlier production revenue; lowers capital cost of installation by approximately 25%.
Integrated Fines Recovery Circuit | Baza Teknike: Multistage hydrocyclone bank paired with duplex spiral concentrators | Përfitimi Operacional: Actively recovers fine gold particles from the 2mm slurry stream that would otherwise be lost in traditional screening alone | Ndikimi i ROI: Field data shows a recoverable grade improvement of 38% in typical alluvial deposits.
Paketa e rreshtimit Rezistent ndaj Abrasionit | Baza Teknike: Highchrome wear plates at critical impact points and polyurethane screens | Përfitimi Operacional: Extends component life in highly abrasive silica environments; reduces frequency of maintenance shutdowns | Ndikimi i ROI: Increases mean time between replacements by 23x, directly lowering operating cost per ton.
Sistemi inteligjent i riciklimit të ujit | Baza Teknike: Compact rake classifier/settling tank design with clear water return pumps | Përfitimi Operacional: Cuts fresh water consumption by over 90%; produces denser tailings for easier site management | Ndikimi i ROI: Eliminates the need for large settling ponds in many cases, reducing environmental footprint and associated costs.
Kontroll i centralizuar & Kabina e monitorimit | Baza Teknike: PLCbased control panel with motorized variable frequency drives (VFD-të) and pressure/flow sensors | Përfitimi Operacional: Enables singleoperator monitoring of the entire washing process; allows finetuning of pump speeds and feeder rates for optimal performance | Ndikimi i ROI: Lowers labor requirements while providing data for continuous process optimization.

4. PËRPARËSITË KONKURRETARE

| Metrikë e performancës | Standardi i Industrisë (500 Klasa TPH) | Kjo 500 Zgjidhja e fabrikës për larjen e minierave të arit TPH | Avantazhi (% Përmirësimi) |
| : | : | : | : |
| Efikasiteti i shpërbërjes së argjilës| Singlestage scrubbing with fixed spray pattern| Multistage attrition with adjustable lifter profile & targeted highpressure sprays| Deri në 40% more effective on tough cemented clays |
| Konsumi i ujit të freskët| ~1000 m³/day (tipik qark i hapur) | 90% reduktim |
| Average Wear Life on Liners| 1,200 1,800 orë (mild steel) | 3,000 4,000 orë (highchrome alloy package)| ~150% improvement |
| Koha e instalimit në vend| 812 javë (field fabrication & montim) | 46 javë (preassembled modular skids) | ~ 50% ulje |
| Rikuperimi i arit gjobë (<100 rrjetë)| Reliant on screening only; significant loss expected| Active recovery via cyclones & spirals on slurry stream| Recovers an estimated +85% of liberated fines |

5. SPECIFIKIMET TEKNIKE

Kapaciteti i projektimit: Nominale 500 tonë metrikë në orë (TPH), capable of peaks up to 550 TPH depending on material density (<1.8 t/m³).
Kërkesat për fuqi: Ngarkesa totale e lidhur afërsisht 650 kW. Primary supply recommended: 440V/60Hz/3Ph or customizable.
Feed Specifications: Madhësia maksimale e furnizimit: 150mm (6"). Optimal moisture content 20%).
Specifikimet e materialit: Main frame structure: Heavyduty Hbeam steel. Critical wear surfaces: AR400 steel or equivalent highchrome iron alloy. Screening surfaces: Panele modulare poliuretani ose gome.
Dimensionet fizike (Modular): Approximate footprint of core plant modules: L70m x W25m x H12m. Individual skid dimensions optimized for standard containerized transport.
Gama e funksionimit të mjedisit: Gama e temperaturës së ambientit: 20°C deri +50 °C (4°F deri +122 °F). Water operating temperature range: +1°C deri +40 °C.

(Shënim: = Specific grades/dimensions are illustrative; final specs are projectdependent.)

6. Skenarët e APLIKIMIT

Operacioni aluvial në shkallë të gjerë në Afrikën Perëndimore

Challenge A major operation faced inconsistent throughput due to extreme seasonal variations in clay content within their gravels. Their existing plant frequently bogged down,causing daily downtime.
Solution Implementation of this specified modular washing plant featuring the heavyduty trommel scrubber with variablespeed drive.The integrated fines circuit was configured specifically for their known fine gold presence.
Results Throughput stabilized at a consistent >480 TPH yearround.Fine gold recovery improved by an estimated $7M USD annually based on audit data.Plant availability increased from ~82% to over94%.

Weathered Hard Rock Saprolite Processing

Challenge A mine transitioning from hard rockto nearsurface oxide zone struggledwith efficient liberationof free goldfrom ahighly weathered,saproliticmatrix.Thematerialwasabrasiveandvariable,causing rapidwearonstandardequipment
Solution A customized versionof thewashingplantwas deployed,focusingon the abrasionresistantlinerpackageandareinforcedscrubbersection.Theclassificationstagewas tunedforaspecificcutpointtooptimizefeedforcentrifugalconcentrators
Results Goldrecoveryinthepreconcentrationstageincreasedby22%.Wearpartreplacementcostswere reducedby40%comparedtothepreviouscontractorsuppliedsystem

7.KONSIDERATA TREGTARE

Equipment pricingforthestandardmodular500TPHgoldminingwashingplantisstructuredintotiersbasedonrequiredfeatures:

Niveli 1(BasePlant):Includescorescrubber,screeningmodules,basicconveyors,andcontrolsystem.Focusedoncleaningandsizingonly
Niveli 2(EnhancedRecovery):Addstheintegratedfinesrecoverycircuit(hidrociklone&spirals)andupgradedwearliners.Thisisthemostcommonconfigurationforgoldoperations
Niveli 3(TurnkeyReady):Includesallabovepluswaterreclamationsettlingtanks,pompat,piping,andextendedwalkways/accessplatforms

Karakteristikat Opsionale:Dieselgeneratorpowerpacksonskid,dustenclosuresforaridsitesautomatedgreasing systems remote monitoring telemetry packagesImport 500 Tph Gold Mining Washing Plant Specification

Paketat e Shërbimit:Aftersalesupportisavailableinmultiyearagreementscovering:
•Onsitecommissioning&operatortraining
•Preventativemaintenanceinspectionsandplannedoutagesupport
•Guaranteedwearpartsinventoryholdingwithprioritydispatch

FinancingOptionsAvailablethroughpartner institutions including equipment leasing capital expenditure loansandrenttoownstructures tailoredtolargeprojectcashflowrequirements

8.FAQ

P:Whatisthemaximumclaycontentthisplantcaneffectivelyhandle?
A:Theplantdesignhassuccessfullyprocessedmaterialswithclaycontentexceeding30%.Thekeyistheadjustableretentiontimeinthescrubberandthehighpressuredischarge system which prevents blinding

P:Cantheplantbeupgradedifourthroughputrequirementsincreasebeyond500TPH?
A:Themodulardesignallowsforparalleladditions.Forexampleasecondaryscrubbingskidorfinescircuitcanbeaddedtoincreasecapacitytypicallyupto750TPHwithoutreplacingthecoreinfrastructureImport 500 Tph Gold Mining Washing Plant Specification

P:Whatarethetypicalleadtimesfordeliveryandcommissioning?
AFollowingengineeringfinalizationmanufacturingleadtimeforastandardmodularplantis1620weeksOnsitecommissioningbyourteamstypicallyrequires46weeksdependingonsite readiness

QHowmanystaffarerequiredtooperatetheplantduringashift?
ADuetothecentralizedPLCcontrolsystemasingleoperatorcanmonitorandcontroltheentirewashingprocessfromthecabinRoutinepatrolsandmechanicalchecksmayrequireoneadditionalgroundpersonnelper shift

QWhatisthewarrantystructureformajorcomponents?
AThestandardwarrantyprovides12monthsonmanufacturingdefectsformainstructuresandelectricalswitha6monthwarrantyonwearpartsSpecific extended warranty terms can be negotiated as part oftheservicepackage

Lini Mesazhin Tuaj

Shkruani mesazhin tuaj këtu dhe na dërgoni

Lini Mesazhin Tuaj