Çmimet e shitësve me shumicë të pajisjeve të minierave të arit
1. HAPJE NGA PIKA E DIKIMIT
Po përshkallëzimi i kostove operacionale dhe koha e paparashikueshme e joproduktive po gërryen marzhet e projektit tuaj të minierave të arit? The selection of core processing equipment is a primary determinant of your site’s profitability and longterm viability. Common challenges with suboptimal gold mining equipment include:
Shpenzime të larta operative: Inefficient recovery rates directly translate to lost revenue. For every percentage point of gold lost to tailings, significant annual profit is forfeited.
Kohë joproduktive të mirëmbajtjes së tepërt: Equipment failures in remote locations can cost tens of thousands per hour in stalled production and expedited parts logistics.
Produkt i paqëndrueshëm & notë: Fluctuations in feed material can overwhelm rigid systems, leading to bottlenecks and unstable concentrate quality, complicating downstream processing.
Rising Energy and Water Consumption: Outdated technology places unsustainable demands on power grids and water resources, increasing both cost and environmental footprint.
Is your current setup maximizing recovery from complex ore bodies? How resilient is your operation to variable feed grades? The solution lies in specifying highefficiency, durable gold mining equipment engineered for the demands of modern mineral processing.
2. PËRMBLEDHJE E PRODUKTIT: HIGHEFFICIENCY CYANIDATION LEACHING & ADSORPTION PLANTS
This product category encompasses integrated plant solutions for the extraction of gold from ore via the cyanidation process, specifically focusing on Leach Tanks, CarboninPulp (CIP), or CarboninLeach (CIL) sistemeve. These systems are engineered for operations processing moderate to high volumes of ore where maximum recovery is critical.
Rrjedha e punës operative:
1. Ore Preparation: Milled ore is slurried and fed into a series of agitated leach tanks.
2. Shpëlarje & Adsorbimi: A dilute cyanide solution is introduced, dissolving the gold. Activated carbon is added (in CIP/CIL) to adsorb the dissolved gold complexes from the slurry.
3. Ndarja & Elucioni: Loaded carbon is screened from the slurry and transferred to a stripping circuit (elution column) where gold is desorbed.
4. Elektronining & Shkrirja: The eluted gold solution passes through electrowinning cells to plate out metallic gold, which is then smelted into doré bars.
Fusha e Aplikimit: Ideal for freemilling ores where gold is readily liberated. Effective for both greenfield installations and plant upgrades.
Kufizimet: Not suitable for refractory ores without preoxidation treatment. Requires rigorous safety protocols for cyanide management and environmental controls.
3. TIPARET THEMELORE
Advanced Agitation System | Baza Teknike: Dinamika e Fluideve Llogaritëse (CFD)optimized impeller design and tank baffling | Përfitimi Operacional: Ensures complete solids suspension and uniform reagent distribution, eliminating dead zones that reduce leach efficiency | Ndikimi i ROI: Të dhënat në terren tregojnë një konsistencë 13% improvement in overall gold recovery compared to conventional agitators.
Dizajni modular i tankeve | Baza Teknike: Highintegrity welded steel construction with standardized modular components | Përfitimi Operacional: Redukton kohën e instalimit në terren deri në 40%, allows for easier future plant expansion or reconfiguration | Ndikimi i ROI: Lowers capital installation costs and minimizes revenue delay at project commissioning.
Trenat me makinë të optimizuar me energji | Baza Teknike: Rrotullim i lartë, lowspeed gearboxes paired with premium efficiency (IE3/IE4) motorët | Përfitimi Operacional: Cuts agitator power consumption by an average of 18% while providing superior startup torque under full load | Ndikimi i ROI: Direct reduction in continuous operating expense, with payback often achieved within 24 muaj funksionimi.
Integrated Carbon Handling Circuit | Baza Teknike: Automated interstage screens, airlift transfer systems, and carbon conditioning vessels | Përfitimi Operacional: Minimizes carbon attrition (<5% annual loss) and prevents crossstage contamination of loaded carbon | Ndikimi i ROI: Reduces annual activated carbon replacement costs by approximately 1520% and protects recovery efficiency.
Korrozioni & Abrasion Protection | Baza Teknike: Veshjet specifike për aplikim (p.sh., highdensity polyethylene, poliuretani, or specialized rubber) based on slurry abrasivity and chemical exposure | Përfitimi Operacional: Extends maintenance intervals for tanks and launders; typical lining lifespan exceeds 8 years in continuous service | Ndikimi i ROI: Lowers longterm maintenance capital expenditure and reduces planned downtime for lining replacement.
Smart Process Control Interface | Baza Teknike: PLCbased system with sensors for pH, cyanide concentration, dissolved oxygen, and level control | Përfitimi Operacional: Provides operators with realtime process stability data, enabling prompt adjustments to maintain optimal leach kinetics | Ndikimi i ROI: Prevents costly reagent overdosing and protects recovery metrics from operator error or feed variability.

4. PËRPARËSITË KONKURRETARE
| Metrikë e performancës | Standardi bazë i industrisë | Zgjidhja jonë për pajisjet e minierave të arit | Avantazhi (% Përmirësimi) |
| : | : | : | : |
| Efikasiteti i rikuperimit të arit (Miniera e FreeMullirit) | 9092% overall plant recovery | 9496% overall plant recovery | +3 te +5% |
| Agitator Specific Power Consumption (kW/m³) | 0.25 0.30 kW/m³ | 0.20 0.22 kW/m³ | ~20% Reduktim |
| Carbon Attrition Rate (Annual Loss) | 1015% për një vit | 50% Reduktimi |
| Koha mesatare ndërmjet mirëmbajtjes (Agitator Drives) | 8,000 10,000 orë| >14,000 orë| +40% Koha e funksionimit |
| Instalimi & Afati kohor i komisionimit (250kTPY Plant)| 56 muaj| 34 muaj| ~33% më shpejt |
5. SPECIFIKIMET TEKNIKE
Kapaciteti/Përdorimi: I konfigurueshëm nga 50 te 5,000 ton në ditë (TPD) of dry ore feed per processing train.
Kërkesat për fuqi: Dependent on scale; varg tipik nga 150 kW for a compact 200 TPD plant to over 2 MW for a largescale 5k TPD installation. Designed for connection to local grid or onsite generation.
Specifikimet e materialit: Primary tank structure ASTM A36/A572 steel; agitation shafts ASTM A479 Type 316 stainless steel or equivalent; wear liners customselected from HDPE (1040mm), Poliuretani (2550 Durometer), or AbrasionResistant Rubber.
Dimensionet fizike: Leach/CIP tanks typically range from Ø4m x H4m to Ø15m x H16m. Modular design facilitates transport within standard shipping containers.
Gama e funksionimit të mjedisit: Projektuar për temperaturat e ambientit nga 20°C deri në +50°C. Systems include insulation/heat tracing options for coldclimate operations.
6. Skenarët e APLIKIMIT
MidTier Mining Operation in West Africa
Sfida: An existing operation using older CIP technology was experiencing declining recovery rates (~88%) due to poor slurry agitation and carbon management, alongside high energy costs.
Zgjidhje: Implementation of a retrofit package featuring our advanced agitation systems with optimized impellers across six leach tanks and an upgraded carbon handling circuit.
Rezultatet: Plant recovery increased to 93.5% within one month of commissioning. Energy consumption per tonne of ore processed dropped by 22%. The project achieved payback on capital investment in under 14 months through increased gold production.
Greenfield Project in Latin America
Sfida: A new mine required a compact, highly efficient processing plant capable of handling variable ore hardness within a tight budget and accelerated development schedule.
Zgjidhje: Supply of a complete modular CIL plant package rated at $800 TPD capacity using prefabricated tank modules our integrated process control system.
Rezultatet: The modular approach reduced onsite construction time by five months versus conventional builds.The plant consistently achieves design recovery rates above $95%, even with variable feed.The faster commissioning timeline allowed commercial production to begin one quarter ahead of feasibility study projections.
Plant Expansion Scenario
A mature mine needed additional capacity without disrupting ongoing production or constructing an entirely new facility.A phased upgrade was implemented over two years.This approach allowed continuous operation while integrating new equipment during scheduled maintenance periods.The result was a smooth $40$ increase in throughput with no loss in annual output during the transition period
Plant Expansion Scenario
A mature mine needed additional capacity without disrupting ongoing production or constructing an entirely new facility.A phased upgrade was implemented over two years.This approach allowed continuous operation while integrating new equipment during scheduled maintenance periods.The result was a smooth $40$ increase in throughput with no loss in annual output during the transition period
Plant Expansion Scenario
A mature mine needed additional capacity without disrupting ongoing production or constructing an entirely new facility.A phased upgrade was implemented over two years.This approach allowed continuous operation while integrating new equipment during scheduled maintenance periods.The result was a smooth $40$ increase in throughput with no loss in annual output during the transition period
Plant Expansion Scenario
A mature mine needed additional capacity without disrupting ongoing production or constructing an entirely new facility.A phased upgrade was implemented over two years.This approach allowed continuous operation while integrating new equipment during scheduled maintenance periods.The result was a smooth $40$ increase in throughput with no loss in annual output during the transition period
Plant Expansion Scenario
A mature mine needed additional capacity without disrupting ongoing production or constructing an entirely new facility.A phased upgrade was implemented over two years.This approach allowed continuous operation while integrating new equipment during scheduled maintenance periods.The result was a smooth $40$ increase in throughput with no loss in annual output during the transition period
Plant Expansion Scenario
A mature mine needed additional capacity without disrupting ongoing production or constructing an entirely new facility.A phased upgrade was implemented over two years.This approach allowed continuous operation while integrating new equipment during scheduled maintenance periods.The result was a smooth $40$ increase in throughput with no loss in annual output during the transition period
Plant Expansion Scenario
A mature mine needed additional capacity without disrupting ongoing production or constructing an entirely new facility.A phased upgrade was implemented over two years.This approach allowed continuous operation while integrating new equipment during scheduled maintenance periods.The result was a smooth $40$ increase in throughput with no loss in annual output during the transition period
Plant Expansion Scenario
A mature mine needed additional capacity without disrupting ongoing production or constructing an entirely new facility.A phased upgrade was implemented over two years.This approach allowed continuous operation while integrating new equipment during scheduled maintenance periods.The result was a smooth $40$ increase in throughput with no loss








