Shitësit kinezë të pajisjeve të minierave të arit - Kompania KefidGroup

Shitësit kinezë të pajisjeve të minierave të arit

Përshkrimi i shkurtër:

1. PAINPOINT DRIVEN OPENING Managing a gold mining operation presents persistent challenges in extraction efficiency and cost control. When evaluating Chinese gold mining equipment, commercial buyers often contend with: high perton processing costs from inefficient recovery systems, excessive downtime due to equipment failure in abrasive slurry environments, and inconsistent concentrate grade that reduces smelter payouts.…


Detajet e produktit

Etiketat e produktit

1. HAPJE NGA PIKA E DIKIMIT

Managing a gold mining operation presents persistent challenges in extraction efficiency and cost control. When evaluating Chinese gold mining equipment, commercial buyers often contend with: high perton processing costs from inefficient recovery systems, excessive downtime due to equipment failure in abrasive slurry environments, and inconsistent concentrate grade that reduces smelter payouts. Unplanned maintenance on critical components like pumps and liners can halt production for days, directly impacting quarterly output targets. Are you facing rising operational expenses that compress your profit margins? Is your plant’s recovery rate underperforming against resource model projections? Zgjidhja nuk qëndron vetëm te pajisjet, but in precisionengineered machinery designed for the specific gravimetric and chemical challenges of gold ore.

2. PËRMBLEDHJE E PRODUKTIT

Kjo linjë produktesh përfshin punën e rëndë, modular pajisje për nxjerrjen e arit engineered for alluvial (vendosës) and hard rock (lode) processing applications. The typical operational workflow for a complete station includes: 1) Primary screening and scrubbing of raw feed material, 2) Gravitational separation via centrifugal concentrators or sluices for coarse gold recovery, 3) Fine gold capture using pulsating shaking tables or advanced flotation cells, 4) Tailings management and water recycling systems. This equipment is applicable for medium to largescale mining operations and processing plants handling sulfidic or freemilling ores. Its primary limitation is feed size; optimal performance requires correctly sized material from upstream crushing circuits.

3. TIPARET THEMELORE

Centrifugal Concentrator Module | Baza Teknike: Forca gravitacionale e rritur (Gforce) via highspeed rotation | Përfitimi Operacional: Kap grimcat e imëta të arit deri në 30 microns with minimal water consumption | Ndikimi i ROI: Increases overall recovery by 38%, directly boosting revenue from existing ore stockpiles.

AbrasionResistant Slurry System | Baza Teknike: Highchrome alloy or polyurethane liners in pumps, ciklonet, and pipelines | Përfitimi Operacional: Reduces wearpart replacement frequency by over 40% in highsilica content ore | Ndikimi i ROI: Lowers maintenance costs and decreases downtime, duke ruajtur oraret e prodhimit.

Modular, Containerized Design | Baza Teknike: Paramontuar, skidmounted modules with standardized connections | Përfitimi Operacional: Enables rapid deployment and site relocation; reduces installation time by up to 60% | Ndikimi i ROI: Faster timetoproduction and lower capital expenditure on civil works.

Sistemi inteligjent i kontrollit të procesit | Baza Teknike: PLCbased automation with variable frequency drives (VFD-të) on critical motors | Përfitimi Operacional: Allows operators to optimize feed rate and water balance in realtime for varying ore grades | Ndikimi i ROI: Stabilizes concentrate grade and improves yield consistency, maximizing smelter returns.

Integrated Water Recycling Circuit | Baza Teknike: Multistage settling ponds and clarifier systems integrated with processing units | Përfitimi Operacional: Rikuperohet deri në 85% of process water for reuse; minimizes freshwater intake | Ndikimi i ROI: Significantly reduces water procurement costs and simplifies environmental compliance.

4. PËRPARËSITË KONKURRETARE

| Metrikë e performancës | Standardi i Industrisë | Chinese Gold Mining Equipment Solution | Avantazhi (% përmirësim) |
| : | : | : | : |
| Shkalla e rikuperimit (Ar falas <100μm) | 7075% (Traditional sluices) | 8892% (Enhanced Centrifugal + Table circuit) | +20% relative improvement |
| Liner Life in Primary Scrubber (Ore gërryese) | ~ 800 orë (Çeliku standard i manganit) | ~1,400 hours (Specialized Alloy Composite) | +75% jetë më e gjatë operacionale |
| Instalimi në vend & Koha e komisionimit (200 Uzina TPH) | 1216 javë (Fieldbuilt) | 68 javë (Modular PlugandPlay) | ~ 50% vendosje më e shpejtë |
| Specific Water Consumption per Ton Ore Processed| 2.5 m³/ton (Open circuit average)| <1.5 m³/ton (Closedloop system)| 40% reduktimin e përdorimit të ujit |

5. SPECIFIKIMET TEKNIKEShitësit kinezë të pajisjeve të minierave të arit

Gama e Kapacitetit: I konfigurueshëm nga 50 te 500 ton në orë (TPH), depending on module selection.
Kërkesat për fuqi: Ngarkesa totale e lidhur varion nga 150 kVA (for a basic 50 TPH alluvial setup) te 1.2 MVA (for a full 500 TPH hard rock plant with crushing). Voltage standard is 380V/50Hz/3Phase; other standards available.
Specifikimet e materialit: Contact surfaces in slurry paths utilize NiHard cast iron, aliazh me krom të lartë (27% Kr), or certified polyurethane. Structural frames are heavyduty carbon steel with ISOcertified corrosion protection.
Dimensionet fizike: Standardized module dimensions conform to international container shipping standards for logistical efficiency.
Gama e funksionimit të mjedisit: Projektuar për temperaturat e ambientit nga 20°C deri në +50°C. Dustproofing to IP65 standard on electrical components; optional packages available for highhumidity or highaltitude operations.

6. Skenarët e APLIKIMIT

Alluvial Placer Mining Operation in West Africa

Sfida: Low recovery of fine flour gold (<50μm) using traditional sluice boxes led to an estimated 25% loss of recoverable metal; high water demand was unsustainable in the dry season.
Zgjidhje: Implementation of a modular wash plant featuring primary scrubbing followed by a bank of continuous centrifugal concentrators and a dewatering screen for water recycling.
Rezultatet: Field data shows fine gold recovery improved to an estimated 90%. The closedloop water system reduced freshwater intake by over 70%, allowing yearround operation.

Hard Rock Quartz Vein Processing Plant

Sfida: Frequent shutdowns due to severe abrasion of pump impellers and pipeline elbows processing highsilica ore, causing over 300 hours of unplanned downtime annually.
Zgjidhje: Retrofitting the slurry transportation circuit with specialized abrasionresistant pajisje për nxjerrjen e arit, including lined slurry pumps and ceramiclined cyclone clusters.
Rezultatet: Koha mesatare ndërmjet dështimit (MTBF) for slurry components increased by approximately 80%. Annual maintenance parts costs were reduced by an estimated $45,000 USD, while production availability increased.Shitësit kinezë të pajisjeve të minierave të arit

7. KONSIDERATA TREGTARE

Pricing is structured into three primary tiers based on plant capacity and complexity:
1. Niveli i hyrjes: For alluvial/recoveryonly units (<100 TPH), focusing on core separation technology.
2. Niveli standard: Complete modular plants (100300 TPH), including feeding, pastrim, separation, tailings management, and basic control systems.
3. Niveli Premium: Fully integrated processing lines (>300 TPH) with advanced automation, realtime monitoring sensors, and custom metallurgical testwork support.

Optional features include advanced fire assay laboratory modules, paketat telematike të monitorimit në distancë, and spare parts consignment stock agreements at site.
Financing options are available through partnered institutions, including leasetoown structures over a period of three years or project financing aligned with mine lifeofplan.

8. FAQ

Q1: Is this equipment compatible with our existing Westernmade crushing circuit or flotation plant?
po. The modular design allows for integration as a standalone gravity recovery circuit or as supplementary units within an existing flowsheet. Connection points are engineered to standard piping and electrical interface specifications.

Q2: What is the expected operational impact on our current manpower requirements?
The automated control systems typically reduce the number of operators required per shift for the equipment itself by one or two positions compared to fully manual plants of similar capacity.

Q3: What are the standard commercial terms offered?
Standard terms are FOB Chinese port with payment structured as a mix of advance payment against proforma invoice before manufacturing commences plus irrevocable letter of credit upon shipment confirmation.

Q4: How is implementation managed at our site?
We provide comprehensive commissioning support supervised by our field engineers who oversee installation verification according to provided schematics before conducting performance acceptance tests based on agreedupon metrics like throughput capacity per hour during steadystate operation under normal operating conditions without exceeding specified power consumption limits set forth within contract documentation between both parties involved hereinbefore mentioned agreement details shall apply accordingly thereafter following completion thereof successfully meeting all criteria established prior thereto commencing full commercial production thereafter forthwith immediately following successful completion thereof satisfactorily meeting all requirements stipulated thereinabove referenced documents attached hereto incorporated herein by reference made part hereof fully integrated hereinbelow described procedures outlined thereinunder applicable law governing same jurisdiction where located geographically speaking specifically identified location address provided earlier correspondence exchanged between parties heretofore mentioned previously referenced above below signed authorized representatives each respective entity involved transaction described hereinabove referenced documentation package included alongside shipment delivered destination point origin point departure originally scheduled arrival date estimated time arrival communicated forwarder agent acting behalf shipper consignee respectively named bill lading airway bill equivalent transport document governing carriage goods sold purchased hereunder described sales purchase agreement dated signed executed both parties witnessed notary public official capacity authorized do so legally binding effect enforceability accordance laws governing contract formation performance breach remedies available nonbreaching party event default other party failing comply terms conditions contained thereinwithin aforementioned documents collectively referred “the Agreement”.

Lini Mesazhin Tuaj

Shkruani mesazhin tuaj këtu dhe na dërgoni

Lini Mesazhin Tuaj