Kinë 500 Fabrika e larjes së minierave të arit Tph
Kinë 500 Fabrika e larjes së minierave të arit TPH: HighCapacity Alluvial Gold Recovery Solution
Operational Challenges in LargeScale Gold Recovery
Your operation faces three persistent bottlenecks: declining recovery rates below 85% due to claybound feed material, tejkalimi i kohës joproduktive të paplanifikuar 120 hours annually from screen blinding and pump failures, and escalating water consumption above 4,000 m³ per day for 500 Rrjedha e TPH. Each percentage point lost in recovery represents approximately $15,000–$25,000 in unrecovered gold value per month at current market prices. Equipment wear from abrasive quartz and lateritic clays forces complete liner replacements every 800–1,200 operating hours, adding $180,000–$250,000 in annual maintenance costs.
Can your current washing plant handle feed moisture content exceeding 18% without sacrificing throughput? Are you losing fine gold particles below 75 microns to overflow discharge? Does your existing setup require twostage crushing before washing, adding $0.40–$0.60 per ton in preprocessing costs?
Pasqyrë e produktit: Integrated Washing and Recovery System
The China 500 TPH Gold Mining Washing Fabrika është një modular, skidmounted system combining rotary trommel scrubbing, highpressure spray washing, and multistage gravity concentration. Designed for alluvial, eluvial, and weathered hardrock deposits, this plant processes runofmine feed with clay content up to 40% and particle sizes up to 600 mm.
Rrjedha e punës operative:
1. Përgatitja e ushqimit: Runofmine material enters a vibrating grizzly feeder (bar spacing 50–80 mm) të skalpit të tepërt >150 mm, which discharges to a reject conveyor.
2. Trommel Scrubbing: Feed enters a 2.4 m diameter × 8.0 m long rotary trommel with internal lifters and highpressure spray bars (12–16 bar, 8 grykë për metër linear). Retention time adjustable 45–90 seconds via variable frequency drive (VFD).
3. Screening and Classification: Trommel screen sections (two decks: 10 mm and 2 hapje mm) separate +10 mm oversize (refuzoj), 2–10 mm middlings (secondary crushing optional), dhe 2 mm llum.
4. Përqendrimi i gravitetit: 2 mm slurry feeds a bank of 8–12 centrifugal concentrators (30 TPH secili) with automatic discharge cycles. Concentrate undergoes final upgrading via shaking tables or mercuryfree intensive cyanidation.
5. Menaxhimi i Ujit: Closedloop system with thickener (20 m diametër) and filter press recovers 85–90% of process water. Makeup water requirement: 400–600 m³/day.
Fusha e Aplikimit: Alluvial gold deposits, minierat e shtratit të lumit, old tailings reprocessing, weathered gold ores. Kufizimet: Not suitable for primary hardrock ores requiring crushing below 10 mm; maximum feed clay content 45% pa kushte paraprake.
Karakteristikat kryesore
HighIntensity Trommel Scrubbing | Baza Teknike: Counterrotational lifters with 12–16 bar spray pressure | Përfitimi Operacional: Disaggregates claybound gold particles within 60 seconds retention time | Ndikimi i ROI: Reduces downstream grinding energy by 30–40% and increases liberation of fine gold (75–150 micron) by 18–22%
DualDeck Modular Screen System | Baza Teknike: Polyurethane screen panels with 10 mm and 2 hapje mm, 18° slope, 1,200 RPM vibration | Përfitimi Operacional: Eliminates screen blinding in highclay feeds through selfcleaning ball decks | Ndikimi i ROI: Reduces screen replacement frequency from every 400 orë për të 1,200 orë; saves $12,000–$18,000 annually per screen deck
Ngasja me frekuencë të ndryshueshme (VFD) Kontrolli | Baza Teknike: 160 kW motor with VFD for trommel rotation (4–12 RPM) and feed conveyor speed | Përfitimi Operacional: Adjusts retention time and wash intensity based on realtime feed clay content | Ndikimi i ROI: Optimizes water usage by 15–20% and reduces power consumption by 12% compared to fixedspeed operation
Automatic Concentrator Discharge System | Baza Teknike: Pneumatic pinch valves with PLCcontrolled discharge cycles (every 15–45 minutes) | Përfitimi Operacional: Eliminates manual concentrate removal, reducing labor requirements by 2 operatorët për ndërrim | Ndikimi i ROI: Increases concentrator availability from 85% te 96%, recovering an additional 0.8–1.2 grams per ton of feed
ClosedLoop Water Recovery | Baza Teknike: 20 m highrate thickener with polymer flocculant dosing (5–15 g/m³) dhe 1,200 mm filter press | Përfitimi Operacional: Recovers 85–90% of process water, reducing fresh water intake from 4,000 m³/day to 400–600 m³/day | Ndikimi i ROI: Lowers water procurement costs by $80,000–$120,000 annually in waterscarce regions
WearResistant Component Package | Baza Teknike: Hardoks 450 steel liners (400 HB) in trommel feed section, panelet e ekranit poliuretani, ceramiclined slurry pipes | Përfitimi Operacional: Extends component life by 2.5–3 times compared to standard mild steel | Ndikimi i ROI: Reduces annual maintenance costs by $45,000–$65,000 and unplanned downtime by 60 orë në vit
Monitorimi dhe diagnostikimi në distancë | Baza Teknike: IoT sensors on 12 critical points (dridhje, temperatura, rrjedhin, presioni) with cloudbased dashboard | Përfitimi Operacional: Provides realtime alerts for bearing wear, verbimi i ekranit, and pump cavitation | Ndikimi i ROI: Redukton kohën mesatare për riparim (MTTR) nga 8 orë për të 2.5 orë; prevents catastrophic failures costing $30,000–$50,000 per incident
Përparësitë Konkurruese
| Metrikë e performancës | Standardi i Industrisë (500 Bimët TPH) | Jonë 500 Fabrika e larjes së arit TPH | Avantazhi (% Përmirësimi) |
|||||
| Gold recovery rate (i trashë >150 mikron) | 92–95% | 96–98% | 3–4% higher recovery |
| Gold recovery rate (fine 75–150 micron) | 75–82% | 85–90% | 8–10% higher recovery |
| Water consumption per ton processed | 6–8 m³/ton | 3.5–4.5 m³/ton | 35–45% reduction |
| Screen blinding frequency (per 1,000 orë) | 8–12 events | 2–4 events | 65–75% ulje |
| Trommel liner replacement interval | 800–1,200 hours | 2,500–3,200 hours | 150–200% longer life |
| Konsumi i energjisë për ton të përpunuar | 1.8–2.4 kWh/ton | 1.3–1.6 kWh/ton | 25–33% reduction |
| Commissioning time (nga dorëzimi) | 14–21 days | 7–10 days | 50–55% faster |
| Operator requirement per shift | 4–5 operators | 2–3 operators | 35–40% reduction |
Specifikimet Teknike
| Parametri | Specifikimi |
|||
| Kapaciteti | 500 TPH (nominale), 550 TPH (kulmin, <25% balta) |
| Madhësia e furnizimit | 0–600 mm (maksimumi 800 mm intermittent) |
| Clay Content Tolerance | Deri në 45% (with VFD adjustment) |
| Trommel Dimensions | 2.4 m diameter × 8.0 m length |
| Trommel Motor | 160 kW, 4shtyllë, 415 V/50 Hz (ose 480 V/60 Hz) |
| Zona e ekranit | 18 m² (two decks) |
| Spray Water Pressure | 12–16 bar (i rregullueshëm) |
| Fuqia totale e instaluar | 380 kW (duke përfshirë transportues, pompat, përqendruesit) |
| Water Flow Rate | 1,800–2,400 m³/hour (circulating) |
| Përqendruesit | 8–12 units, 30 TPH secili, 3 mm max feed size |
| Thickener Diameter | 20 m (centerdrive, çelik i butë) |
| Filter Press | 1,200 mm × 1,200 mm, 100 pjata, 80 m³ capacity |
| Dimensionet e përgjithshme (L×W×H) | 45 m × 18 m × 12 m (operativ) |
| Dimensionet e transportit | 4 × 40 ft containers + 2 raftet e sheshta |
| Pesha totale | 185 ton metrikë (operativ) |
| Temperatura e funksionimit | 10°C deri në 50 °C (with heating options for subzero) |
| Niveli i zhurmës | <85 dB(A) në 1 m (with acoustic enclosures) |
Skenarët e aplikimit
Alluvial Gold Mining – West Africa | Sfida: Feed material contained 35–40% lateritic clay, causing severe screen blinding and reducing effective throughput to 320 TPH. Gold recovery dropped below 70% for particles <100 mikronë. | Zgjidhje: Instaluar 500 TPH plant with VFDcontrolled trommel (increased retention time to 75 sekonda) and dualdeck polyurethane screens with ball decks. Added 10 centrifugal concentrators with 20minute discharge cycles. | Rezultatet: Throughput stabilized at 480–510 TPH. Gold recovery for 75–150 micron fraction increased from 68% te 87%. Water consumption reduced from 7.2 m³/ton to 4.1 m³/ton. Annual gold production increased by 22%, ekuivalente me $1.8 million additional revenue at $1,800/oz.
Riverbed Gold Reprocessing – Southeast Asia | Sfida: Reprocessing 15yearold tailings with 8–12% clay and high silt content (40% duke kaluar 75 mikronë). Existing plant achieved only 55% recovery due to fines loss in overflow. | Zgjidhje: Deployed 500 TPH plant with enhanced fine gold recovery circuit: 12 centrifugal concentrators in parallel, followed by twostage shaking table concentration. Installed thickener with 15 g/m³ flocculant dosing. | Rezultatet: Recovery rate for tailings feed reached 82% (vs. 55% më parë). Concentrate grade improved from 45 g/ton to 280 g/ton. Periudha e kthimit: 11 months based on incremental gold recovery of 1.8 g/ton.
Weathered HardRock Gold – Central Asia | Sfida: Feed material from weathered quartz veins with 20–25% clay and 15% lagështia. Existing plant required twostage crushing (nofulla + kon) before washing, adding $0.55/ton in costs. | Zgjidhje: Implemented 500 TPH plant with 50 mm grizzly scalping and direct trommel feed. Added secondary scrubber for +10 fraksion mm. | Rezultatet: Eliminated primary crushing stage, reducing preprocessing costs by $0.48/ton. Throughput maintained at 470–500 TPH. Gold recovery: 94% për +150 mikron, 83% for 75–150 micron. Annual cost savings: $720,000.

Konsiderata Komerciale
Nivelet e çmimeve të pajisjeve (FOB Shanghai, exworks):
| Konfigurimi | Gama e çmimeve (USD) | Koha e udhëheqjes | Përfshin |
|||||
| Standard (8 përqendruesit, shkarkim manual) | $680,000– 750,000 dollarë | 8–10 weeks | daulle, ekranet, 8 përqendruesit, pompat, paneli i kontrollit |
| E përmirësuar (10 përqendruesit, auto discharge) | $820,000–$910,000 | 10– 12 javë | sipër + 2 additional concentrators, PLC autodischarge, monitorimi në distancë |
| Premium (12 përqendruesit, automatizimi i plotë) | $980,000–$1,080,000 | 12–14 weeks | sipër + trashësues, filter press, Sensorët IoT, Integrimi SCADA |
Karakteristikat opsionale:
- Secondary scrubber for +10 fraksion mm: $85,000– 110,000 dollarë
- Shaking table package (4 njësive): $120,000–$145,000
- Heating system for subzero operation: $45,000– 60,000 dollarë
- Shasi celulare (rrugës): $95,000–$130,000
- Kompleti i pjesëve të këmbimit (12funksionimin mujor): $55,000–$75,000
- bazë (1 vit): Remote technical support, 2 onsite visits, përditësimet e softuerit: $18,000/vit
- Standard (3 vjet): sipër + 4 onsite visits, dërgimi i pjesëve prioritare, auditimi vjetor i performancës: $42,000/vit
- Gjithëpërfshirëse (5 vjet): sipër + e garantuar 92% koha e funksionimit, 48hour parts replacement, trajnimi i operatorëve (4 sessions): $68,000/vit
- 30% paradhënie, 70% upon delivery (standarde)
- 20% poshtë, 40% në dërgesë, 40% after commissioning (available for established buyers)
- Leasetown: 36afat mujor, 8.5% Prill (subjekt i miratimit të kredisë)
- Equipmentbacked financing: 12–24 months, 6–9% APR (for buyers with existing operations)
Paketat e Shërbimit:

Opsionet e financimit:
FAQ
P: Can this plant handle feed with clay content exceeding 45%?
A: The standard configuration is optimized for up to 45% balta. For higher clay content (deri në 60%), we recommend adding a preconditioning drum or increasing trommel retention time via VFD adjustment. Field data shows recovery rates decline by 3–5% for each 5% increase in clay above 45%. A sitespecific test is recommended before ordering.
P: What is the expected gold recovery rate for fine particles (50–75 microns)?
A: For the 50–75 micron fraction, recovery typically ranges from 65–78% depending on gold morphology and clay content. Our centrifugal concentrators achieve 72–78% recovery for liberated gold in this size range. For particles below 50 mikronë, recovery drops to 40–55%; we recommend adding a flotation or intensive cyanidation circuit for optimal recovery.
P: How long does installation and commissioning take?
A: Përgatitja e vendit (themelet e betonit, furnizimi me ujë) requires 10–14 days. Equipment assembly and wiring: 7–10 days with a 4person crew. Commissioning and operator training: 3–5 days. Total timeline from delivery to full production: 20–28 days. We provide one commissioning engineer onsite for 10 ditë.
P: What is the power requirement and can it run on generator power?
A: Total installed power is 380 kW. Në 80% faktori i ngarkesës, actual consumption is 300–310 kW. For generator operation, we recommend a 500 kVA diesel generator (minimale 450 kVA). The VFD system includes softstart capability, reducing peak demand by 35%. Fuel consumption at full load: approximately 85–95 liters/hour.
P: What warranty and aftersales support do you offer?
A: Garancia standarde: 24 muaj ose 8,000 orët e punës (cilado që të vijë e para) for manufacturing defects. Vishni pjesë (astar, ekranet, spray nozzles) janë të përjashtuar. Aftersales support includes 24/7 diagnostifikimi në distancë, a regional parts warehouse (stocking 200+ critical components), and guaranteed 48hour dispatch for emergency parts.
P: Can this plant be expanded to 750 TPH in the future?
A: po. The modular design allows capacity expansion by adding a second trommel module in parallel or upgrading to a 2.8 m diameter trommel. Estimated cost for 750 TPH upgrade: $320,000–$420,000. The existing thickener and filter press can handle up to 650 TPH; above that, additional water treatment capacity is required.
P: Cilat janë kërkesat e pajtueshmërisë mjedisore?
A: The closedloop water system meets most international standards (IFC, World Bank) for zero liquid discharge. Sterilet (tepër i madh +10 mm) are drystacked; 2 mm tailings from concentrators are thickened to 55–65% solids for dry stacking or pond disposal. Noise levels meet OSHA requirements with standard enclosures. We provide environmental compliance documentation for permitting.