1. PAINPOINT DRIVEN OPENING Are you managing a highvolume gold operation where consistent throughput and recovery rates are compromised by inefficient material scrubbing and classification? Operational bottlenecks at 500 TPH can translate to significant revenue loss. Merrni parasysh këto sfida të zakonshme: Furnizimi i paqëndrueshëm & ClayBearing Material: Variable ore with high clay content can blind screens, reduce…


Detajet e produktit

Etiketat e produktit

1. HAPJE NGA PIKA E DIKIMIT

Are you managing a highvolume gold operation where consistent throughput and recovery rates are compromised by inefficient material scrubbing and classification? Operational bottlenecks at 500 TPH can translate to significant revenue loss. Merrni parasysh këto sfida të zakonshme:
Furnizimi i paqëndrueshëm & ClayBearing Material: Variable ore with high clay content can blind screens, reduce scrubbing efficiency, and lead to gold losses in the undersize fraction.
High Water & Konsumi i energjisë: Traditional washing plants often operate with fixed flow rates and nonoptimized pump systems, leading to unsustainable utility costs.
Koha e tepërt joproduktive për mirëmbajtje: Poorly designed trommels and scrubbers with inadequate wear protection require frequent liner changes and component repair, halting your primary production line.
Difficulty Meeting Environmental Compliance: Managing water recycling and tailings from a highcapacity plant is complex; inefficient solids removal overloads settling ponds and filtration systems.

How do you ensure your 500 TPH operation maximizes gold recovery while controlling operational expenditure and maintaining continuous runtime? The solution requires a purposeengineered washing plant designed for industrialscale efficiency.Ce shënuar 500 Fabrika e larjes së minierave të arit Tph

2. PËRMBLEDHJE E PRODUKTIT

The CE Marked 500 TPH Gold Mining Washing Plant is a complete, modular processing system engineered for the primary scrubbing, clay breakdown, size classification, and material preparation of alluvial or hard rock gold ores. It serves as the critical frontend to your recovery circuit, ensuring optimal feed material for downstream concentration units like centrifugal concentrators or sluice arrays.

Rrjedha e punës operative:
1. Feed & Pastrim primar: Runofmine ore is introduced into a robust trommel scrubber, where lifters aggressively break down clay conglomerates and soft oxides.
2. Klasifikimi i madhësisë: The rotating trommel screen separates material into two key streams: tepër i madh (gravels/rocks) and undersize (rërë, llum, and goldbearing fines).
3. Trajtimi i materialeve: Oversize material is conveyed to waste stockpile. The undersize slurry is efficiently distributed to subsequent recovery modules.
4. Optional Secondary Screening: A vibrating screen deck can further classify undersize material to optimize feed grade for specific recovery technologies.
5. Menaxhimi i Ujit: Effluent is channeled to a integrated settling/sump system for water recycling, minimizing fresh water requirements.

Fusha e Aplikimit & Kufizimet:
Fushëveprimi: Ideal for alluvial/eluvial deposits, weathered saprolite zones, and placer operations requiring highvolume clay removal. Effective as a preconcentration plant for hard rock operations where ore requires liberation.
Kufizimet: Not a standalone recovery solution; requires downstream gold capture units. Performance is dependent on accurate feed characterization (përmbajtje argjile, lagështia, rock size distribution).Ce shënuar 500 Fabrika e larjes së minierave të arit Tph

3. TIPARET THEMELORE

HeavyDuty Trommel Scrubber | Baza Teknike: Variablespeed drum drive with internal lifters and spray bars | Përfitimi Operacional: Adjustable retention time ensures complete disintegration of claybound ores without overscrubbing softer minerals | Ndikimi i ROI: Increases effective feed grade to recovery circuits by up to 30%, reducing load on downstream equipment.

Dizajn modular i rrëshqitjes | Baza Teknike: Preassembled structural steel skids with integrated walkways and connection points | Përfitimi Operacional: Reduces site installation time by an estimated 60% compared to fieldfabricated plants | Ndikimi i ROI: Lowers capital installation costs and accelerates timetoproduction.

HighEfficiency Pump System | Baza Teknike: Drejtues me frekuencë të ndryshueshme (VFD-të) on slurry pumps matched to system curve requirements | Përfitimi Operacional: Operators can precisely match power draw to feed rate, eliminating energy waste during partial load conditions | Ndikimi i ROI: Të dhënat në terren shfaqen deri në 25% reduction in pumping energy consumption over fixedspeed systems.

Mbrojtje e avancuar ndaj veshjes | Baza Teknike: Bolton wear liners on scrubber interior, screen sections, and slurry launders made from AR400 steel or polyurethane composites | Përfitimi Operacional: Liner replacement is simplified, reducing mean time to repair (MTTR) during scheduled maintenance | Ndikimi i ROI: Extends service intervals by approximately 40%, decreasing annual parts expenditure and labor hours.

Sistemi i integruar i riciklimit të ujit | Baza Teknike: Multistage settling tanks with flocculant dosing points for rapid solids settlement | Përfitimi Operacional: Clarified water recirculation reduces fresh water demand by over 80% in closedloop configurations | Ndikimi i ROI: Drastically lowers water sourcing costs and simplifies permitting for environmental compliance.

CE Certified Safety & Sistemi i kontrollit | Baza Teknike: Centralized PLC control panel with motor protection devices, ndalesa emergjente, and guarding per EU Machinery Directive | Përfitimi Operacional: Provides a safe operating environment with clear system diagnostics, reducing operational risk | Ndikimi i ROI: Mitigates potential for costly accidents and ensures market access within regulated regions.

4. PËRPARËSITË KONKURRETARE

| Metrikë e performancës | Standardi i Industrisë (500 Uzina TPH) | Our CE Marked 500 TPH Solution | Avantazhi (% Përmirësimi) |
| : | : | : | : |
| Clay Disintegration Efficiency| ~7080% liberation after first pass| >95% liberation after first pass| +18% përmirësim |
| Total Installed Power Draw| ~450500 kW typical| ~380420 kW optimized design| Deri në 15% reduktim |
| Average Liner Life (Trommel)| 800 1,200 orë| 1,500 1,800 orë| +50% përmirësim |
| Koha e instalimit në vend| 45 weeks with full crew| 23 weeks with reduced crew| ~40% faster deployment |
| Water Consumption per Tonne| ~34 m³/tonne in open circuit|<1 m³/tonne in closed circuit|<75% reduktim |

_Based on standardized testing with mediumplasticity clay samples._

5. SPECIFIKIMET TEKNIKE

Kapaciteti nominal përpunues: 500 ton në orë (dry feed basis).
Trommel Scrubber Dimensions: Diametri: 3.0m; Gjatësia: 10m; Fuqia e makinës: 2 x 110kW motors with VFD control.
Screen Classification: Trommel screen aperture sizes configurable from 10mm to 50mm; Optional secondary vibrating screen (3m x 2m) available.
Kërkesat për fuqi: Total Connected Load approximately 480kW; Main Supply Voltage 400V/50Hz or 480V/60Hz (configurable).
Specifikimet e materialit:
Korniza kryesore & Skids : Painted structural steel (S355).
Bie & Lavanderi : AR400 wear steel (6mm minimum).
Trommel Shell : Mild steel with bolton liner system.
Dimensionet fizike (Modular): Comprised of 4 main skids; Largest skid footprint approx 12m (L) x 4m (W) x 5m (H).
Gama e funksionimit të mjedisit:
Ambient Temperature Range : 20°C deri +45 °C
Dust Emissions Control : Fully enclosed conveyor transfer points
Niveli i zhurmës në 10 metra <85 dB(A)

6. Skenarët e APLIKIMIT

West African Alluvial Gold Operation

Challenge A largescale placer mine faced severe downtime due to sticky clay blinding their screening system every 72 hours Recovery rates dropped as fine gold was lost with the discarded undersize material
Solution Implementation of the CE Marked 500 TPH plant featuring the heavyduty trommel scrubber with intensive spray bars The modular design allowed integration into their existing conveyor network within 16 ditë
Results Clay blinding was eliminated extending continuous runtime to over 720 hours between planned maintenance Overall recovery yield improved by an estimated 22 due to more effective liberation of fine gold

Southeast Asian Saprolite Processing Plant

Challenge Processing deeply weathered ore required excessive water use creating tailings management issues that threatened their operating license Fresh water costs were prohibitive
Solution The washing plant was configured with the integrated highcapacity water recycling system including flocculant dosing automation This created a nearclosed water loop
Results Fresh water consumption reduced from approximately 15 million liters per day to under 3 million liters Tailings pond area required was reduced by 60 sigurimin e pajtueshmërisë

7 KONSIDERATA TREGTARE

Equipment pricing is structured around core configuration needs

Base Plant Tier Includes the primary trommel scrubber module feed hopper oversize conveyor undersize slurry distribution launder basic control system

Premium Plant Tier Adds the secondary vibrating screen module fully automated polymer dosing system advanced PLC control with data logging remote monitoring capability extended wear package on critical components

Service Packages Available options include supervised installation commissioning operator training programs annual inspection contracts guaranteed spare parts delivery within 48 orë

Financing Options Flexible commercial arrangements can be discussed including leasing structures milestonebased project payment plans or tradein programs for existing equipment

8 FAQ

What upstream equipment is required To operate at full capacity this plant typically requires a consistent feed provided by a large frontend loader or a properly sized apron feeder from a surge bin

Can this plant be reconfigured for different ore types Yes The trommel screen panels spray bar configuration scrubber speed are adjustable Modularity allows adding or removing classification stages based on specific deposit characteristics

How does CE marking benefit us as an international operator CE certification demonstrates compliance with stringent European health safety environmental standards It reduces your regulatory risk facilitates equipment insurance often simplifies importation into other global markets requiring certified machinery

What are the typical ongoing operational costs Primary costs are power wear liners replacement parts electricity consumption averages between kWh per tonne processed depending on ore hardness Liner life expectancy detailed in specifications allows accurate cost forecasting

What site preparation is required A level compacted pad capable of supporting loaded skids foundations for any optional fixed structures such as settling tanks Adequate fresh water supply initial fill power connection point as per specification sheet

Is operator training provided Yes Comprehensive training onsite during commissioning covering normal operation routine maintenance procedures troubleshooting safety protocols is included Documentation includes full operational manuals parts lists schematic diagrams