H1: Maximize Recovery & Uptime with a 500 Tph Gold Mining Washing Plant PAINPOINT DRIVEN OPENING Are you facing escalating operational costs and unpredictable recovery rates in your highvolume alluvial or eluvial gold operation? At a 500tonperhour scale, inefficiencies translate directly into significant revenue loss. Sfidat e zakonshme përfshijnë: High Clay Content: Aggressive materials blind screens…


Detajet e produktit

Etiketat e produktit

H1: Maximize Recovery & Uptime with a 500 Fabrika e larjes së minierave të arit Tph

HAPJE NGA PIKA E DIKIMIT

Are you facing escalating operational costs and unpredictable recovery rates in your highvolume alluvial or eluvial gold operation? At a 500tonperhour scale, inefficiencies translate directly into significant revenue loss. Sfidat e zakonshme përfshijnë:
High Clay Content: Aggressive materials blind screens and clog scrubbers, causing frequent downtime for manual cleaning and reducing effective processing hours.
Variable Feed Grade: Inconsistent ore leads to gold losses in tailings, with traditional plants struggling to adapt without manual intervention.
Uji & Power Intensity: Highcapacity washing demands substantial resources; inefficient designs inflate operating costs and limit viable site locations.
Maintenance Complexity: Modular plants with poor component access require extended shutdowns for routine service, impacting annual throughput targets.
Fine Gold Losses: Inadequate scrubbing and screening liberation, followed by insufficient retention time in sluicing, result in unrecoverable fine gold reporting to tails.

Is your current setup equipped to handle abrasive, highclay feed while maintaining 90%+ availability? Can you accurately track and improve recovery rates without constant sampling? The scalability of your operation depends on a washing plant engineered for these specific challenges.

PËRMBLEDHJE E PRODUKTIT

Të 500 Tph Gold Mining Washing Plant is a modular, heavyduty processing system designed for the primary washing, scrubbing, skriningu, and initial gravity concentration of goldbearing alluvial or hard rock saprolite material. Ai transformohet i papërpunuar, claybound ore into classified gravels and concentrated sands for downstream gold recovery (p.sh., koncentratorë centrifugale, llambat).

Rrjedha e punës operative:
1. Furnizimi primar & Pastrim: Runofmine feed is introduced into a robust hopper and conveyed to a largediameter rotary scrubber. This unit aggressively breaks down clay agglomerates and liberates gold particles from the ore matrix.
2. Shqyrtimi primar & Waste Removal: Scrubbed material discharges onto a highcapacity vibrating screen. Oversize (+75mm) barren gravels are typically rejected as waste via conveyor. Midsize material may be routed for further crushing or secondary scrubbing.
3. Secondary Screening & Klasifikimi: The screen undersize reports to a series of hydrocyclones or classifying screens to separate sands from slimes. This step is critical for removing fine clays that hinder gravity concentration.
4. Primary Gravity Concentration: The cleaned, classified sand fraction is fed onto primary recovery units such as stepped sluices or jigs to produce a primary heavy mineral concentrate.
5. Menaxhimi i Sterilit & Water Handling: Slimes and process water are directed to a compact thickener for water recovery and clarification, reducing fresh water demand by up to 80%.500 Tph Gold Mining Washing Plant Dealer Wholesale Price

Fusha e Aplikimit & Kufizimet:
Ideale për: Largescale alluvial deposits, eluvial (weathered) gold projects, and construction aggregate operations requiring intensive material washing.
Kufizimet: Not a standalone solution for primary hard rock (lode) minierave. Final gold extraction requires secondary concentration (p.sh., koncentratorë centrifugale) of the primary concentrate produced by this plant.

TIPARET THEMELORE

HeavyDuty Rotary Scrubber | Baza Teknike: Hightorque drive system with internal lifters | Përfitimi Operacional: Effectively disintegrates tough clay nodules and cemented gravels with minimal liner wear | Ndikimi i ROI: Reduces prescreening bottlenecks and increases overall gold liberation yield by targeting previously lost nuggets locked in clay balls.

Modular "PlugandProcess" Dizajn | Baza Teknike: Bolttogether skidmounted modules with integrated walkways | Përfitimi Operacional: Enables rapid deployment onsite with minimal civil works; simplifies future plant relocation or expansion | Ndikimi i ROI: Redukton kohën e instalimit deri në 40%, allowing revenue generation weeks earlier than fixed installations.

Intelligent Water Recycling System | Baza Teknike: Highcapacity thickener with flocculant dosing system | Përfitimi Operacional: Clarifies process water for immediate reuse; drastically reduces fresh water consumption and settling pond footprint | Ndikimi i ROI: Lowers water procurement costs by over 75% and mitigates environmental permitting challenges.

Advanced Screen Deck Configuration | Baza Teknike: Multistage polyurethane screen decks with integrated spray bars | Përfitimi Operacional: Provides superior blinding resistance and precise size classification even with sticky feed material | Ndikimi i ROI: Maintains design throughput consistently, avoiding the 1520% capacity loss common in standard screen setups under difficult conditions.

Kontroll i centralizuar i procesit (PLC) | Baza Teknike: Automated control panel monitoring feed rate, water pressure, and motor loads | Përfitimi Operacional: Allows operators to optimize performance from a single station; provides alarms for preventative maintenance triggers | Ndikimi i ROI: Improves operational consistency leading to more stable recovery rates; reduces unplanned stops by identifying mechanical issues early.

QuickAccess Maintenance Design | Baza Teknike: Hinged guard panels, slideout chute sections, and centralized grease points | Përfitimi Operacional: Cuts routine service time for screen deck changes or scrubber liner inspection by half | Ndikimi i ROI: Increases plant availability directly translating to higher annual tonnage processed.

PËRPARËSITË KONKURRETARE

| Metrikë e performancës | Standardi i Industrisë (500 Tph Class) | Jonë 500 Tph Gold Mining Washing Plant Solution | Avantazhi (% Përmirësimi) |
| : | : | : | : |
| Disponueshmëria (Koha e planifikuar e ekzekutimit)| 8285% due to extended maintenance windows| Targeted >90% via quickaccess design & component redundancy| +68% more productive hours annually |
| Konsumi i ujit për ton| ~3 cubic meters/ton of feed| <0.8 cubic meters/ton with closedloop recycling| Deri në 73% reduction in water cost/liability |
| Efikasiteti i shpërbërjes së argjilës| E ndryshueshme; often requires presoaking or doublepass scrubbing| Konsistente >95% liberation in single pass per internal testing| Reduces rehandling energy costs & process complexity |
| Koha e vendosjes (Site Ready)| 812 weeks for assembly & vënien në punë| 46 javë me module të paramontuara| ~50% faster timetoproduction |

SPECIFIKIMET TEKNIKE

Design Capacity: 500 tonë metrikë në orë (variable based on specific gravity and clay content).
Kërkesat për fuqi: Përafërsisht. 8501100 kW ngarkesa totale e lidhur (në varësi të konfigurimit). Designed for HV supply (6.6kV/11kV) or stepdown transformers.
Specifikimet kryesore të materialit:
Scrubber Drum: Abrasionresistant steel plate (minimum AR400) with boltin replaceable liners.
Kuvertën e ekranit: Modular polyurethane panels.
Chute Work & Lavanderi: Hardox® or equivalent wear steel in highimpact zones.
Korniza strukturore: Heavygauge painted carbon steel or optional galvanized finish.
Dimensionet fizike (Modular): Approximate footprint of main processing train is 45m L x 22m W x 12m H. Each major module is transportable within standard road freight limits.
Gama e funksionimit të mjedisit: Projektuar për temperaturat e ambientit nga 20°C deri në +50°C. Dust suppression systems are integral; noise levels comply with typical mine site regulations.

Skenarët e APLIKIMIT

Operacioni aluvial i arit në Afrikën Perëndimore

Challenge A project faced highly variable clay content (1060%), causing frequent screen blinding and reducing effective capacity below 350 Tph despite nominal plant rating.
Solution Implementation of our specialized trommelscrubber module combined with highpressure spray bars ahead of screening decks within the complete washing plant package.
Results Screen efficiency maintained above target; plant achieved consistent throughput at design capacity of over >480 Tph wet feed. Annualized production increased by an estimated ~28%.

Eluvial Saprolite Project in South America

Challenge Significant fine gold losses (25% të nën <5%. Reported overall project recovery improved by approximately nine percentage points based on regular grade control reconciliation.

KONSIDERATA TREGTARE

Our solutions are offered under flexible commercial models tailored for capital project planning:

1. Nivelet e çmimeve të pajisjeve:
• Base Package – Core washing modules including scrubberfeeder assembly,
primary screening unit,
and basic conveyors
• Optimized Package – Base plus enhanced features like PLC control,
water recycling thickener,
and premium wear liners
• Turnkey Package – Complete system engineering,
installation supervision,
commissioning support,
and operator training500 Tph Gold Mining Washing Plant Dealer Wholesale Price

2. Karakteristikat opsionale:
• Diesel power generation module
• Semimobile trailerized configuration
• Advanced instrumentation package including density meters
and mass flow totalization

3.Paketat e Shërbimit:
Available service agreements range from scheduled parts supply through full annual maintenance support including remote monitoring diagnostics

4.Opsionet e financimit:
We work alongside established partners able provide equipment leasing structures project finance solutions suitable largescale mining ventures

FAQ

Q1 Is this washing plant compatible with my existing crushing circuit or trommel?
A1 Yes it is designed as both standalone solution bolton upgrade Standard conveyor interfaces flanges allow integration most upstream downstream equipment Engineering review your specific layout recommended

Q2 What impact will this have my current operating labor requirements?
A2 The automated control centralized design typically allows one operator manage entire washing circuit from control cabin reducing personnel exposure moving parts potentially lowering labor requirements per ton processed

Q3 How does pricing compare building customdesigned wash plant locally?
A3 While initial capital outlay may appear higher than piecemeal approach total cost ownership analysis factors our standardized designs proven reliability reduced commissioning risk lower longterm maintenance costs Industry data indicates lifecycle savings can exceed over fiveyear period

Q4 Çfarë kohe tipike dërgimi pas vendosjes së porosisë?
A4 For standard configuration lead times range between weeks depending final specification complexity Current production schedules confirmed upon order commitment

Q5 Are spare parts readily available globally?
A5 We maintain strategic inventory critical wear parts consumables across key mining regions ensuring express delivery options minimize potential downtime events

Q6 Can you provide detailed process guarantee regarding recovery performance?
A6 While final gold recovery depends multiple factors beyond washing stage we provide guaranteed performance metrics related material preparation specifically clay liberation efficiency classification accuracy based representative sample tested pilot scale prior purchase agreement

Q7 What site preparation required before delivery?
A7 We provide comprehensive foundation drawings utility connection points A level compacted pad suitable bearing capacity along access fresh water source are primary requirements Detailed civil works scope document supplied early engagement phase