1. PAINPOINT DRIVEN OPENING Are unreliable batch processing and inconsistent liberation rates limiting your gold recovery and inflating operational costs? Manual sampling and smallscale testing often fail to accurately predict fullplant performance, leading to costly design flaws and underperforming circuits. The financial risks are substantial: misjudged grind sizes can result in 1025% unrecovered gold, while…


پيداوار جي تفصيل

پراڊڪٽ ٽيگ

1. PAINPOINT driven اوپننگ

Are unreliable batch processing and inconsistent liberation rates limiting your gold recovery and inflating operational costs? Manual sampling and smallscale testing often fail to accurately predict fullplant performance, leading to costly design flaws and underperforming circuits. The financial risks are substantial: misjudged grind sizes can result in 1025% unrecovered gold, while unplanned downtime for circuit adjustments halts revenue.

How can your operation derisk process design and optimize recovery before committing capital to fullscale equipment? How do you generate accurate, scalable metallurgical data without the exorbitant cost and time of a pilot plant? حل هڪ مضبوط جي ضرورت آهي, industrialgrade testing system that delivers reliable, repeatable data under controlled conditions.

2. پيداوار جو جائزو

The White Label Stamp Mill is a heavyduty, modular crushing and grinding apparatus engineered for continuous duty mineral liberation testing. It is designed for mining engineers, metallurgists, and plant managers to conduct definitive ore characterization and process optimization for goldbearing deposits.

آپريشنل ڪم فلو:
1. کاڌ خوراڪ جي تياري: Crushed ore sample (عام طور تي 1/2") is introduced into the feed hopper.
2. Controlled Comminution: The mechanized cam shaft lifts and drops weighted stamps onto the ore within a hardened steel mortar box, simulating traditional stamp mill action with precise control.
3. مسلسل خارج ٿيڻ: Pulverized material passes through a replaceable discharge screen, ensuring a consistent target particle size.
4. Slurry Collection & تجزيو: The discharged slurry is collected for downstream analysis, including gravity concentration, cyanidation leach tests, or assaying.
5. Data Compilation: Throughput rates, energy consumption per ton, and liberation data are recorded to inform fullscale mill selection and circuit design.

ايپليڪيشن جو دائرو & حدون:
دائرو: مفت ملنگ سون جي معدنيات لاءِ مثالي, sulphide ore testing (precyanidation), continuous gravity recoverable gold (جي جي) testwork, and comminution circuit modeling. Serves as a critical step between labscale jaw crushing/batch grinding and full pilot plants.
حدون: Not designed for primary crushing of large ROM material or for processing ultraabrasive ores without scheduled liner maintenance. Requires a controlled feed size distribution for optimal performance.

3. بنيادي خاصيتون

Modular Duty Frame | ٽيڪنيڪل بنياد: Highstiffness steel construction with vibrationdampening mounts | آپريشنل فائدا: Eliminates frame walk and maintains precise stamp alignment during continuous operation, ensuring test consistency | ROI اثر: Reduces retesting due to mechanical variance by an estimated 15%, پروجيڪٽ جي وقت جي حفاظت

Precision WeightAdjustable Stamps | ٽيڪنيڪل بنياد: Individually configurable stamp weights (125250 lbs) via bolton segments | آپريشنل فائدا: Operators can simulate specific energy inputs (kWhr/ton) to match target comminution circuits | ROI اثر: Enables precise energy optimization before plant buildout, potentially reducing future operating costs by 812%

Hardened Alloy Mortar & Discharge System | ٽيڪنيڪل بنياد: ASTM A532 Class III Type NiHard iron liners with programmable wash water injection | آپريشنل فائدا: Provides extended service life under abrasive conditions and prevents screen blinding for steadystate operation | ROI اثر: Lowers consumable cost per test ton by up to 30% معياري مينگنيز اسٽيل جي مقابلي ۾

PLCAutomated Cycle Control | ٽيڪنيڪل بنياد: Programmable Logic Controller managing stamp cadence (30100 drops/minute) and runtime | آپريشنل فائدا: Enables unattended operation for multihour durability tests and ensures perfect repeatability between test batches | ROI اثر: Frees skilled personnel for analytical work, increasing lab throughput by over 40%

Integrated Data Acquisition Ports | ٽيڪنيڪل بنياد: Sensorready ports for power monitoring, feed rate measurement, and slurry density tracking | آپريشنل فائدا: Delivers realtime, correlated data on throughput and specific energy consumption directly to a laptop | ROI اثر: Creates defensible engineering reports faster, accelerating feasibility study completion

4. مقابلي جا فائداوائيٽ ليبل اسٽيمپ مل گولڊ مائننگ جاچ

| ڪارڪردگي ميٽرڪ | انڊسٽري معيار (Manual/Batch Test Mills) | وائٹ ليبل اسٽيمپ مل حل | فائدو (% سڌارو) |
| : | : | : | : |
| Test Data Consistency | High variance due to manual operation & feed inconsistency | PLCcontrolled parameters ensure identical mechanical action between runs. فيلڊ ڊيٽا ڏيکاري ٿو <5% variance in product P80. |
| آپريشنل اپ ٽائم Frequent stops for manual feeding/sampling; ~65% utilization during test hours.| Continuous feed hopper & automated cycle allows >90% utilization during programmed tests.| ~38% more productive test hours |
| Specific Energy Calibration| Estimated based on batch time; difficult to correlate to industrial mills.| Direct kWhr/ton measurement via integrated power sensors provides plantready data.| Correlation accuracy improved by ~70% |
| Sample Throughput| عام طور تي 2050 kg per shift depending on target grind.| Steadystate processing of 150300 kg per shift achievable.| جي ذريعي وڌي ويو 200400% |وائيٽ ليبل اسٽيمپ مل گولڊ مائننگ جاچ

5. ٽيڪنيڪل وضاحتون

ظرفيت جي درجه بندي: جي مسلسل throughput 2040 kg/hr depending on ore hardness and target grind size (عام طور تي 20 جي طرف 100 ميش).
بجلي جي گهرج: 7.5 ڪلواٽ (10 ايڇ پي) main drive motor; 400V/50Hz or 460V/60Hz threephase power.
مواد جي وضاحت: Mortar box liners are NiHard Iron (600 بي ايڇ اين). Stamps are highcarbon steel bodies with interchangeable cast iron heads. Frame is fabricated from 10mm structural steel.
جسماني طول و عرض: ڊگھائي: 2.2م; ويڪر: 1.5م; اوچائي: 1.8م; لڳ ڀڳ وزن: 1,800 ڪلو.
ماحولياتي آپريٽنگ رينج: Designed for indoor lab or sheltered outdoor installation. آپريٽنگ ماحول جي درجه حرارت جي حد: 5°C کان 40°C.

6. درخواست جا منظر

Junior Mining Exploration Company | چيلنج: Required bankable metallurgical data for a new freemilling gold zone but lacked budget for a full pilot plant campaign.| حل:: Implemented a White Label Stamp Mill test program to process three tonnes of representative core samples at varying grind sizes.| نتيجا:: Generated definitive recovery curves and optimal grind size data for the feasibility study at less than onethird the cost of a pilot plant., منصوبي جي فنانسنگ کي محفوظ ڪرڻ.

Established Gold Processing Plant || چيلنج:: Gravity circuit recovery was declining; suspected incomplete liberation at current ball mill grind size but changing it was a highrisk operational decision.| حل:: Used the onsite White Label Stamp Mill to test incremental grind sizes on current runofmine ore without disrupting the main plant.| نتيجا:: Identified a +15% gravity recoverable gold improvement at a slightly finer grind., justifying a controlled mill adjustment that increased monthly revenue by an estimated $150k.

7 تجارتي خيالات

قيمت جا درجا:
Base Unit includes PLC control adjustable stamps standard mortar/screen kit
Premium Package adds integrated belt feeder automated wash water system basic data logging sensors
Enterprise Suite includes full sensor suite calibration services extended wear liner kit
Optional Features include dust enclosure slurry pump package advanced process control software
Service Packages range from basic commissioning support up through annual maintenance contracts with guaranteed parts availability within hours
Financing Options include equipment leasing capital expenditure financing or rentalto own structures tailored

FAQ

What feed size does the White Label Stamp Mill require?
The unit is designedfor secondary crushing product Optimal feed is ½ inch material from alab jaw crusher Consistent feed sizing is criticalfor achieving reliable andrepeatable throughputdata

How does the data from this stamp mill scale uptoa full ball mill or industrial stamp battery?
The unit provides direct measurements of specific energy consumption(kW hr ton)and liberation performanceat controlledgrind sizes These are key scaling parameters Industry practice uses this datain conjunctionwith Bond Work Index values tomodelfull scale mill power drawand sizingwith high confidence

Can it handle sulphide oresor only free millinggold?
It is well suitedfor sulphide ore testing particularlyfor pre cyanidationgrind optimization The abrasion resistant linershandle moderate sulphide content For highly abrasiveor complex ores we recommenddiscussingyour specificore characteristicsfor aliner material recommendation

آرڊر کان وٺي ڪميشن ڪرڻ تائين عام ليڊ ٽائيم ڇا آهي?
For standard units lead timeis weeks Custom configurations may require weeks dependingon specifications All units include comprehensive commissioning supportby aveteran field technician

Do you offerrental ortrial optionsfor short termproject work?
Yes we offer short termrental agreements formonthly quarters These includefull technical supportand are often utilizedfor definedsite investigation programsor annual plant process audits

پنهنجو پيغام ڇڏي ڏيو

پنهنجو پيغام هتي لکو ۽ اسان ڏانهن موڪليو

پنهنجو پيغام ڇڏي ڏيو