پٿر کولہو پلانٽ ٺاهيندڙ گھٽ ۾ گھٽ آرڊر
1. PAINPOINT driven اوپننگ
Are unpredictable maintenance cycles and unplanned downtime crippling your aggregate production schedule? Do inconsistent feed size and material hardness variations lead to premature wear, تمام گهڻو vibration, and suboptimal output? Managing the high operational costs of energy consumption, liner replacements, and manual adjustments is a constant challenge for plant managers.
These issues directly impact your bottom line through lost production hours, rising costperton metrics, and compromised product gradation. What if your primary crushing stage could deliver greater predictability, reduce reactive maintenance labor, and maintain optimal performance across variable feed conditions? The solution lies in selecting a stone crusher plant engineered not just for capacity, but for operational resilience and total cost of ownership.
2. پيداوار جو جائزو: Stationary Stone Crusher Plant
A stationary stone crusher plant is a permanently installed system designed for highvolume aggregate production in quarrying, کان کني, ۽ وڏي پيماني تي تعميراتي منصوبا. اهو پرائمري ضم ڪري ٿو, ثانوي, and often tertiary crushing stages with associated screening and material handling equipment to process raw feed into specified aggregate sizes.
آپريشنل ڪم فلو:
1. ابتدائي گھٽتائي: Raw quarryrun rock (01000ايم ايم) شروعاتي سائيز جي گھٽتائي لاءِ هڪ مضبوط پرائمري جبڑے کولہو ۾ کارايو ويندو آهي.
2. ترتيب ڏيڻ & ثانوي ڪرشنگ: Discharged material is conveyed to a primary screen; oversize is routed to a secondary cone or impact crusher for further reduction.
3. آخري ماپ & ذخيرو ڪرڻ: Crushed material is screened into final product fractions (مثال, 05ايم ايم, 520ايم ايم, 2040ايم ايم) via secondary/tertiary screens and conveyed to designated stockpiles.
ايپليڪيشن جو دائرو & حدون:
دائرو: وڏي پيماني تي ڪارخاني جي عملن لاءِ مثالي, mining auxiliary facilities, ۽ اهم انفراسٽرڪچر پروجيڪٽ جيڪي مسلسل گهربل آهن, hightonnage output over multiple years from a fixed location.
حدون: اهم سرمائي سيڙپڪاري ۽ سائيٽ جي تياري جي ضرورت آهي. Not suitable for temporary sites or projects requiring frequent relocation. Performance is highly dependent on correct plant configuration for the specific material characteristics (ڇڪڻ, سليڪا مواد, نمي).
3. بنيادي خاصيتون
ماڊل پلانٽ ڊيزائن | ٽيڪنيڪل بنياد: اڳواٽ انجنيئر, bolttogether substructures معياري انٽرفيس سان | آپريشنل فائدا: Significantly reduces onsite installation time and civil work costs by up to 30% compared to traditional welded structures | ROI اثر: Faster commissioning enables revenue generation sooner and lowers project implementation risk.
ذھني پروسيس ڪنٽرول سسٽم | ٽيڪنيڪل بنياد: PLCbased automation with loadmanagement algorithms and remote monitoring capability | آپريشنل فائدا: Your operators can optimize crusher settings in realtime based on feed monitoring, preventing overloads and ensuring consistent product gradation | ROI اثر: فيلڊ ڊيٽا هڪ اوسط ڏيکاري ٿو 715% improvement in energy efficiency and a reduction in offspec product.
هائيڊرو سيٽ سي ايس ايس ايڊجسٽمينٽ (مخروطي ڪرشرز) | ٽيڪنيڪل بنياد: Hydraulic adjustment of the Closed Side Setting while the crusher is under load | آپريشنل فائدا: Enables quick product size changes without stopping production or manual shim adjustments | ROI اثر: Minimizes planned downtime for adjustments by over 80%, پلانٽ جي دستيابي کي وڌائڻ.
مضبوط HeavyDuty فريم | ٽيڪنيڪل بنياد: محدود عنصرن جو تجزيو (ايف اي اي)optimized steel construction with highstress zone reinforcements | آپريشنل فائدا: Absorbs dynamic crushing forces effectively, reducing structural fatigue cracks and misalignment issues common in highcycle operations | ROI اثر: Extends the structural life of the plant core, توهان جي ڊگهي مدت جي سرمائيداري اثاثن جي حفاظت.
مرڪزي گريسنگ & لوڻ جو نظام | ٽيڪنيڪل بنياد: Automated singlepoint lubrication circuits for all major bearing points across the crushing circuit | آپريشنل فائدا: Ensures critical components receive correct lubrication on schedule without relying on manual operator routines | ROI اثر: صنعت جي جاچ ڏيکاري ٿو سڌو سنئون لاڳاپو سان 4060% وقت کان اڳ بيئرنگ ناڪامي ۾ گهٽتائي.
4. مقابلي جا فائدا
| ڪارڪردگي ميٽرڪ | انڊسٽري معيار | اسان جو پٿر Crusher پلانٽ حل | فائدو (% سڌارو) |
| : | : | : | : |
| لائنر زندگي (ابراھيندڙ پٿر)| 450 550 Mtons| 600 700 Mtons| +20% سراسري. واڌارو |
| توانائي واپرائڻ في ٽين| Based on motor ratings only| Loadadaptive drives & آپٽمائزڊ ڪينيميٽيڪس| تائين 12% گهٽتائي |
| ناڪامي جي وچ ۾ وچولي وقت (ايم بي ايف)| Reactive maintenance schedules| اڳڪٿي جي نگراني & component design| +35% سڌارو |
| ٻوٽن جي بحالي جو وقت| Weeks for major flow changes| ماڊلر ڊيزائن & preplanned layouts| 50% time required |
5. ٽيڪنيڪل وضاحتون
گنجائش جي حد: کان ترتيب ڏئي سگهجي ٿو 200 TPH کان مٿي 800 TPH فائنل پيداوار جي پيداوار.
پرائمري کولہو جا اختيار: جبڑے کي ٽوڙڻ وارا (900x1200mm کان 1500x2000mm تائين), Gyratory Crushers.
Secondary/Tertiary Options: هائيڊولڪ مخروط crushers (HP200HP500 equivalent), افقي شافٽ متاثر ڪندڙ.
بجلي جي گهرج: ڪل نصب ٿيل طاقت عام طور تي حد تائين 400 kW کان 1.2 ميگاواٽ جي ترتيب تي منحصر آهي; requires dedicated HV substation.
اهم مواد جي وضاحت: اعلي طاقت اسٽيل فريم (S355J2); مينگنيز اسٽيل کولہو لائنر (18%22% من); Abrasionresistant steel wear liners on chutes and hoppers (AR400).
جسماني طول و عرض: Footprint varies widely; هڪ معيار 350 TPH plant requires approximately 50m L x 25m W x 15m H planning space.
ماحولياتي آپريٽنگ رينج: 20 ° C کان + 45 ° C تائين محيطي درجه حرارت لاء ٺهيل; مٽي دٻائڻ وارو نظام معياري; noise encapsulation packages available.
6. درخواست جا منظر
گرينائيٽ ڪواري جي توسيع | چيلنج: Existing jawcone plant could not meet new contract demand of +600 TPH of railway ballast while maintaining low flakiness index (<15%). Excessive downtime for cone mantle changes was bottlenecking output. | حل: Implementation of a new stationary stone crusher plant featuring a largecapacity primary jaw crusher paired with two heavyduty cone crushers equipped with automated wear compensation. Integrated advanced screening removed fines prior to secondary stage. | نتيجا: ٻوٽي جي مسلسل throughput حاصل 640 ٽي پي ايڇ. Flakiness index consistently below 12%. Mantle change intervals extended by ~25%, دستاويز ۾ حصو وٺڻ 18% decrease in costperton over the first year.
Urban Infrastructure Project Recycling Concrete Waste Challenge A major metro project generated thousands of tons of demolition concrete requiring onsite processing into road base material Strict noise dust emissions regulations applied Solution A soundanddust encapsulated stationary stone crusher plant centered on a highinertia impact crusher optimized for reinforced concrete Dedicated magnetic separators removed rebar Results The plant processed over . million tons of waste achieving % recycling rate while complying with all urban environmental limits eliminating landfill costs
Limestone Processing Facility Challenge Variable moisture content in feed caused frequent clogging in secondary screens leading to unscheduled stops every – operating hours Solution Redesigned stationary stone crusher plant incorporated nonblind vibrating screens with heating elements on decks along with optimized hopper angles Material flow aids were added at key transfer points Results Clogging incidents reduced by over % Plant availability increased by estimated hours per month directly boosting contracted delivery reliability
تجارتي خيالات
Equipment pricing tiers are structured around core capacity throughput key automation level
Basic Tier – TPH Manual semiautomated control focus on core crushing functions
Performance Tier – TPH Full PLC automation advanced diagnostics modular design
High Availability Tier – TPH Redundant critical systems premium wear materials remote predictive service tools
اختياري خاصيتون شامل آهن
Dust suppression fog cannon systems
Noise encapsulation canopies
Advanced metal detection tramp release systems
جهاز تي وزن ڪرڻ وارو اوزار
Extended warranty packages covering major structural components
سروس پيڪيجز دستياب
Preventive Maintenance Plans scheduled inspections parts kits
Performance Optimization Contracts guaranteeing uptime or throughput metrics
Operator Training Programs conducted onsite covering safe efficient operation troubleshooting
Financing Options Project financing operating leases long term rental purchase agreements are available subject to credit approval These models can help preserve capital expenditure budgets
FAQ
What information do you need to configure stone crusher plant correctly We require your target hourly annual tonnage feed material analysis compressive strength abrasiveness maximum input size required final product sizes grades any specific site constraints access power etc
How does automation reduce operational costs Automation minimizes human error in setting adjustments prevents overload damage sequences equipment startups shutdowns optimally reducing energy spikes wear Collectively this improves consistency reduces unplanned stops lowers power consumption per ton
What are typical lead times from order commissioning For standard configurations lead time averages – months including manufacturing shipping erection commissioning Custom engineered solutions may require additional time Detailed project schedules are provided upon initial quotation
Can existing conveyors screens be integrated into new stone crusher plant Yes integration is often feasible Our engineering team can assess compatibility of your current equipment load capacities transfer points control systems provide retrofit recommendations This can offer significant cost savings
What commercial terms are standard A firm quotation is valid for days Typical payment terms involve an advance payment upon order confirmation staged payments against manufacturing milestones balance due prior shipment Delivery terms are typically EXW or FOB origin port Incoterms are specified clearly





