جي خانگي ليبل پٿر کولہو پلانٽ سپلائرز - KefidGroup ڪمپني
جي

خانگي ليبل پٿر کولہو پلانٽ سپلائرز

مختصر وضاحت:

1. PAINPOINT DRIVEN OPENING Managing a crushing operation presents persistent challenges that directly impact your bottom line. Are you experiencing inconsistent final product gradation, رد ٿيل لوڊ ۽ گم ٿيل آمدني جي ڪري? Are you facing excessive wear part costs and unplanned downtime due to premature component failure in abrasive conditions? Is your plant’s overall throughput limited…


پيداوار جي تفصيل

پراڊڪٽ ٽيگ

1. PAINPOINT driven اوپننگ

Managing a crushing operation presents persistent challenges that directly impact your bottom line. Are you experiencing inconsistent final product gradation, رد ٿيل لوڊ ۽ گم ٿيل آمدني جي ڪري? Are you facing excessive wear part costs and unplanned downtime due to premature component failure in abrasive conditions? Is your plant's overall throughput limited by frequent clogging, دستي صاف ڪرڻ, or inefficient material flow? اهي مسئلا ماپيل خرچن ۾ ترجمو ڪن ٿا: hours of lost production per month, 2030% higher than expected wear part expenditures, and potential safety risks during maintenance interventions. پلانٽ مينيجرز لاءِ بنيادي سوال هي آهي: توهان ڪيئن قابل اعتماد حاصل ڪري سگهو ٿا, predictable crushing performance with lower costperton and maximized uptime?

2. پيداوار جو جائزو

اي پرائيويٽ ليبل پٿر کولڻ وارو پلانٽ هڪ مڪمل آهي, preengineered crushing and screening circuit manufactured under your specified brand name. اهو پرائمري ضم ڪري ٿو, ثانوي, and sometimes tertiary crushing stages with material handling and screening equipment into a cohesive system.

آپريشنل ڪم فلو:
1. ابتدائي گھٽتائي: Runofquarry material is fed into a robust primary jaw crusher for initial size reduction.
2. ترتيب ڏيڻ & ثانوي ڪرشنگ: پريز ٿيل مواد روٽ ڪيو ويو آهي; oversize is directed to a secondary cone or impact crusher for further refinement.
3. آخري ماپ & ذخيرو ڪرڻ: Crushed aggregate passes through final screening decks to separate it into precise product fractions (مثال, ¾" چپ, 57 پٿر, کولہو هلائڻ), جيڪي پوءِ مقرر ٿيل ذخيرن تائين پهچايا ويندا آهن.

ايپليڪيشن جو دائرو: مجموعي پيدا ڪندڙن لاء مثالي, large construction projects requiring onsite material processing, and contractors establishing fixed or semifixed quarry operations. It is designed for processing natural stone (گرينائيٽ, چونا پٿر, بيسالٽ) ۽ ري سائيڪل ٿيل ڪنڪريٽ/اسفالٽ.

اهم حدون: Stationary and semistationary plants require foundational work and are not mobile like trackmounted units. Optimal performance depends on correct plant configuration for the feed material's abrasiveness and hardness.

3. بنيادي خاصيتون

HeavyDuty Primary Crusher Frame | ٽيڪنيڪل بنياد: محدود عنصرن جو تجزيو (ايف اي اي) بهتر دٻاء جي ورڇ | آپريشنل فائدا: Withstands peak load shocks from uncrushable material, فريم ٿڪڻ جي ڀڃڪڙي کي روڪڻ | ROI اثر: Eliminates catastrophic structural failure, ڏهاڪن تائين پلانٽ سروس جي زندگي کي وڌائڻ

PLCBased Automated Control System | ٽيڪنيڪل بنياد: مرڪزي پروگرام قابل منطق ڪنٽرولر ٽچ اسڪرين HMI سان | آپريشنل فائدا: مانيٽر amp ڊرا, کولہو جو دٻاء, and conveyor speeds for realtime optimization and fault diagnosis | ROI اثر: Reduces operator error, allows oneperson operation from the control room, throughput جي تسلسل کي بهتر بنائڻ

ماڊلر اجزاء ڊيزائن | ٽيڪنيڪل بنياد: Standardized bolttogether sections for major assemblies | آپريشنل فائدا: ڪپڙا ماڊلز جي تيزيءَ سان متبادل کي قابل بڻائي ٿو (مثال, feed hopper skirts, ڪپڙا لائينر) versus welded repairs | ROI اثر: منصوبابندي ڪيل سار سنڀال جو وقت گھٽائي ٿو 40% and reduces dependency on specialized field welders

ٽائر 4 فائنل / EU Stage V Compliant Power Unit | ٽيڪنيڪل بنياد: Modern diesel or electric drive systems meeting global emissions standards | آپريشنل فائدا: Ensures regulatory compliance for stationary engines without sacrificing power output | ROI اثر: Avoids potential fines and site shutdowns in regulated regions, futureproofing your investment

Integrated Dust Suppression System | ٽيڪنيڪل بنياد: Strategically placed spray nozzles with solenoid valves tied to crusher activation | آپريشنل فائدا: خاص طور تي بنيادي منتقلي پوائنٽن تي هوائي ذرڙن کي گھٽائي ٿو | ROI اثر: صحت / حفاظت جي خطرن کي گھٽائي ٿو, ڪميونٽي جي شڪايتن کي گھٽائي ٿو, and helps maintain environmental permit compliance

HighAbrasion Resistant Steel Liners | ٽيڪنيڪل بنياد: AR400/500 steel plates in critical wear zones (فيڊرز, ڇڪڻ, پوي ٿو) | آپريشنل فائدا: Provides 23x longer service life compared to mild steel in highimpact areas | ROI اثر: Lowers longterm material costs for plant infrastructure maintenance

4. مقابلي جا فائدا

| ڪارڪردگي ميٽرڪ | انڊسٽري معيار (Typical OEM Plant) | Private Label Crusher Plant Solution | فائدو (% سڌارو) |
| : | : | : | : |
| لباس جو حصو تبديل ڪرڻ وقت (مخروطي کولہو)| 812 ڪلاڪ دستي ڪم| 68 هائيڊولڪ مدد سان ڪلاڪ & اوزار لڳائڻ| ~30% تيز |
| بجلي جو استعمال في ٽين ڪرش ٿيل| بيس لائين 100%| اصلاح ٿيل چيمبر ڊيزائن & efficient drive belts reduces draw| 58% سڌارو |
| پلانٽ سيٽ اپ / ڪم ڪرڻ جو وقت| 1014 days after delivery| اڳي گڏ ڪيل ماڊلز & singlesource wiring reduce field work| ~25% تيز (710 ڏينهن) |
| اجزاء جي مٽاسٽا| Often modelyear specific| Standardized bearings, مهر, motors across crushing stages| 15% reduction in spare parts inventory cost |

5. ٽيڪنيڪل وضاحتونخانگي ليبل پٿر کولہو پلانٽ سپلائرز

گنجائش جي حد: کان ترتيب ڏئي سگهجي ٿو 150 جي طرف 600+ ٽين في ڪلاڪ (ٽي پي ايڇ), depending on feed material hardness and final product mix.
پرائمري کولہو جا اختيار: Jaw crusher sizes from 36" x 48" تائين 56" x 72", with CSS adjustments from 4" جي طرف 12".
ثانوي/Tertiary کولہو جا اختيار: Cone crushers with head diameters from 4.5' to 7.5', or horizontal shaft impactors.
بجلي جي گهرج: ڪل نصب ٿيل طاقت عام طور تي حد تائين 500 HP کان مٿي 1,200 ايڇ پي. Available in full electric motor drive or dieselelectric hybrid configurations.
ساختي مواد: Main frame fabricated from heavyduty wideflange beams; گھٽ ۾ گھٽ AR400 اسٽيل سان ليڪ ڪيل سطحون پائڻ.
جسماني طول و عرض (عام ترتيب): Footprint of approximately 120' L x 80' W x 65' H for a complete threestage plant.
ماحولياتي آپريٽنگ رينج: 20 ° C کان + 50 ° C تائين محيطي درجه حرارت لاء ٺهيل (4°F کان +122°F). Dust suppression systems rated for operation in conditions up to 85% نسبتي نمي.

6. درخواست جا منظر

گرينائيٽ ڪواري توسيع پروجيڪٽ

چيلنج: An existing quarry needed to increase production of state DOTspec road base (1½" هيٺ) but was bottlenecked by an aging secondary circuit causing inconsistent gradation.
حل: Implementation of a new private label plant featuring a highperformance cone crusher as the secondary stage with an automated setting regulation system.
نتيجا: Postinstallation field data showed a 22% reduction in offspec product. جي ذريعي وڌي ويو 18%, achieving the target of +450 TPH while maintaining strict gradation bands.

ري سائيڪل ٿيل ڪنڪريٽ مجموعي (آر سي اي) Processing Facility

چيلنج: A demolition contractor entering the RCA market faced extreme wear on plant components from embedded rebar and abrasive concrete, leading to weekly downtime.
حل: A rugged private label jawandimpactor plant was specified with extraheavyduty skirting; magnetic separators on all discharge conveyors; and quickchange wear liners throughout the material path.
نتيجا: Wear life on liner components increased by 60%. Magnetic separation removed +95% of ferrous contaminants automatically. پلانٽ جي دستيابي حد کان وڌي وئي 92%, making the RCA operation commercially viable.

7. تجارتي خيالات

Our private label stone crusher plants are offered in clear pricing tiers based on capacity and complexity:

1. بنيادي درجي (150250 ٽي پي ايڇ): پرائمري جبڑے کولہو شامل آهن; ثانوي مخروط کولہو; بنيادي اسڪريننگ يونٽ; اسٽيل جي جوڙجڪ; رستا; ڏاڪڻيون; mechanical installation drawings.
2.
3.ڪارڪردگي جو درجو (250450 ٽي پي ايڇ):
All Base Tier items plus:
PLC automation with motor management;
Integrated dust suppression package;
Optional onboard power generation;
وڏن حصن تي توسيع وارنٽي.

4.پريميئم ٽائر (450600+ ٽي پي ايڇ):
All Performance Tier items plus:
Tertiary crushing stage;
Advanced process control software;
Full set of commissioning spares;
Dedicated project manager & onsite technical support during startup.

Optional features include telescopic stacker conveyors; wash screens; صوتي ملفوظات; and advanced fire suppression systems.

We offer comprehensive service packages ranging from annual inspection contracts to fullturnkey operation & maintenance agreements.Financing options include capital lease agreements tailored for heavy equipment acquisition.

FAQ

خانگي ليبل پٿر کولہو پلانٽ سپلائرز

Q1:What level of customization is possible within a private label program?
A1:The program offers significant customization within proven engineering frameworks.You can specify brandspecific color schemes,ليوري,and control panel layouts.Crucially,your team selects key component brands(کولڻ وارا,اسڪرين,موٽرون)and we engineer the integration.We do not compromise core structural or safety designs but tailor the applicationspecific flow sheet,مواد specifications,and ancillary equipment precisely around your chosen components.

Q2:آرڊر لڳائڻ کان وٺي ڪميشن ٿيڻ تائين عام ليڊ ٽائيم ڇا آهي?
A2.For standard configurations within our Performance Tier,the typical lead time ranges between five months.This includes detailed engineering,ٺاھڻ,مصوري,and predelivery testing.Larger Premium Tier plants may require six months.Complex customizations will affect this timeline,and we provide detailed project schedules upon initial quotation.

Q3:What are the ongoing operational costs we should budget for?
A3.The primary operational costs are wear parts(لينر,ڪپڙا,اسڪرين ڪپڙا),توانائي جو واھپو,and routine maintenance labor.Field data indicates that wellconfigured plants operating within specification achieve a costperton where consumables account for approximately .Energy varies by local rates.Regular lubrication system maintenance is critical.We provide detailed expected consumption models based on your feed material analysis during the quoting process.

Q4:اسان جي آپريشن ٽيم لاءِ ڪهڙي تربيت ڏني وئي آهي?
A4.Each project includes comprehensive training covering daily startup/shutdown procedures,routine inspection checklists,basic troubleshooting via the PLC interface,and safe lockout/tagout practices.Training occurs both at our facility during predelivery testing(FAT)and at your site during commissioning.We also provide complete digital operations manuals specific to your configured plant.

Q5:What happens if we need technical support after commissioning?
A5.We offer tiered technical support.A dedicated phone/email line provides immediate access.A shared parts list ensures component traceability.For urgent issues requiring physical presence,a network of qualified field service technicians can be dispatched under agreedupon service level agreements(SLAs).Remote diagnostics via secure modem connection are available as an option

پنهنجو پيغام ڇڏي ڏيو

پنهنجو پيغام هتي لکو ۽ اسان ڏانهن موڪليو

پنهنجو پيغام ڇڏي ڏيو