چيني ريتي بجری مائننگ ٺيڪيدار ٺاهيندڙ
1. PAINPOINT driven اوپننگ
Are escalating operational costs and unpredictable downtime eroding your sand and gravel margins? Managing a modern aggregate operation presents distinct challenges that standard equipment often fails to address. انهن کي عام سمجهيو, قيمتي منظرنامو:
اعليٰ لباس & سار سنڀال جا خرچ: Abrasive silica and gravel rapidly degrade standard components, بار بار جي اڳواڻي, unscheduled shutdowns for liner changes, pump rebuilds, and conveyor belt replacements.
نامناسب حتمي پيداوار جي معيار: Fluctuations in feed material cause offspec product—fines content too high or particle distribution out of grade—resulting in rejected loads and lost revenue.
غير موثر پاڻي & Sludge Management: Ineffective washing and clarification systems waste process water, create environmental compliance hurdles, and lose valuable fines to settling ponds.
گھٽ مجموعي پلانٽ جي ڪارڪردگي: Bottlenecks at crushing, اسڪريننگ, or material handling stages limit total throughput, preventing you from capitalizing on highdemand periods.
What if your key processing equipment was engineered from the ground up to confront these specific abrasion, درجه بندي, and reliability challenges? The solution lies in partnering with a specialized contract manufacturer for your core sand gravel mining equipment.
2. پيداوار جو جائزو
This content details a comprehensive line of stationary and modular sand washing, درجه بندي, and dewatering equipment manufactured under contract for sand and gravel mining operations. As your contract manufacturer, we engineer and build the core machinery that transforms raw feed into specification aggregate.
آپريشنل ڪم فلو:
1. کاڌو & ورهائڻ: Crushed material is evenly distributed into the washing system.
2. انتشار & آزادي: Rotating paddles or screws scrub particles to break down clay clots and liberate fines from coarse aggregate.
3. هائيڊولڪ درجه بندي: Precise water flow rates separate particles by size and specific gravity in settling tanks or hydrocyclones.
4. Mechanical Dewatering: Screws or vibratory decks remove excess water from fine and coarse products to meet shipping moisture specifications.
5. Fines Recovery & پاڻي جو انتظام: Integrated cyclones and thickeners capture ultrafine particles for byproduct sale while clarifying water for recirculation.
ايپليڪيشن جو دائرو: ڪنوار جي مجموعي پروسيسنگ لاء مثالي, crushed stone rewashing, and construction/demolition material recycling. Primary limitations include maximum feed size (typically ≤1”) and the requirement for a consistent water supply; dry processing solutions are configured separately.
3. بنيادي خاصيتون
Polyurethane Wear Components | ٽيڪنيڪل بنياد: Advanced elastomer casting with high tear strength | آپريشنل فائدا: Outlasts standard rubber liners by 300500% in abrasive silica applications | ROI اثر: Reduces component changeout frequency by over 60%, حصن جي انوینٽري جي قيمتن کي گھٽائڻ ۽ سار سنڀال مزدور ڪلاڪ.
متغير فريڪوئنسي ڊرائيو (وي ايف ڊي) ڪنٽرول | ٽيڪنيڪل بنياد: Precision AC motor speed regulation via programmable logic controller (پي ايل سي) | آپريشنل فائدا: Operators can instantly adjust screw speed or slurry density in response to feed changes | ROI اثر: Maintains onspec product yield, reducing waste by an average of 15% as per field data.
Unified Rinse Water System | ٽيڪنيڪل بنياد: Pressurized manifold distributing clarified water across final rinse screens | آپريشنل فائدا: Ensures thorough cleansing of final product without increasing fresh water consumption | ROI اثر: Lowers fresh water makeup requirements by up to 30%, پمپنگ جي خرچن کي گھٽائڻ ۽ ماحولياتي اثرات کي گھٽائڻ.
BoltTogether Modular Chassis | ٽيڪنيڪل بنياد: Fabricated structural steel design with predrilled connection points | آپريشنل فائدا: Enables rapid site relocation or plant reconfiguration with minimal cutting/welding | ROI اثر: Cuts redeployment time by 50%, allowing faster response to shifting deposit locations.
Integrated Cyclone Cluster Packages | ٽيڪنيڪل بنياد: Bank of smalldiameter hydrocyclones for highG force separation | آپريشنل فائدا: Recovers ultrafine sand (100400 ميش) from waste streams for sale as a byproduct | ROI اثر: Adds a new revenue stream; typical plants report payback on this module in under 12 مهينا.
مرڪزي گريس لوبريڪيشن سسٽم | ٽيڪنيڪل بنياد: Automated manifold delivering grease to all critical bearings on timed intervals | آپريشنل فائدا: Eliminates manual greasing points in hardtoreach locations, بهترين برداشت واري زندگي کي يقيني بڻائي | ROI اثر: Documented reduction in bearingrelated failures by over 80%, protecting against catastrophic downtime.
4. مقابلي جا فائدا
| ڪارڪردگي ميٽرڪ | انڊسٽري معياري معيار | Our Sand Gravel Mining Contract Solution | دستاويزي فائدو |
| : | : | : | : |
| Liner Life in Abrasive Silica Sand | 750 1,000 ڪم جا ڪلاڪ | 3,000 4,000 ڪم جا ڪلاڪ (Polyurethane) | +300% سڌارو |
| Fresh Water Consumption per Ton Processed| ~100 gallons/ton (کليل لوپ) | ~70 gallons/ton (بند لوپ سسٽم) | 30% گهٽتائي |
| سٺي مواد جي بحالي (92% recovery to product stream (with cyclone pack) | +27 سيڪڙو پوائنٽون |
| ناڪامي جي وچ ۾ وچولي وقت (ايم بي ايف) نازڪ ڊرائيو| ~ 2,000 ڪلاڪ| >4,500 ڪلاڪ (with VFD & centralized lube)| +125% سڌارو |
| OnSpec Product Consistency (درجي بندي)| ±5% variation from target sieve| ±2% variation from target sieve (with VFD control)| تفاوت گھٽجي ويو 60% |
5. ٽيڪنيڪل وضاحتون
ماڊل رينج جي گنجائش: کان 50 TPH pilot/test units to highvolume 450 TPH production plants.
بجلي جي گهرج: Plantdependent; typical single module ranges from 75 HP کان 250 HP total connected load at 480V/3Phase/60Hz (other voltages configurable).
مواد جي وضاحت: Primary wear components constructed from ASTMrated abrasionresistant steel (>400 بي ايڇ اين), cast polyurethane (>95A Durometer), and ceramic linings in ultrahigh wear zones.
جسماني طول و عرض (Typical Single Screw Washer): ڊگھائي: ~35’, ويڪر: ~10’, اوچائي: ~15’. Modular design allows for stacking or sidebyside placement.
ماحولياتي آپريٽنگ رينج: 20 ° C کان + 50 ° C تائين محيطي درجه حرارت لاء ٺهيل (4°F to 122°F). Dust enclosures and heated bearing options available for extreme environments.
6. درخواست جا منظر
Commercial Sand Producer – Midwest USA
چيلنج: A producer faced significant profit loss due to high silt/clay content contaminating final concrete sand products, leading to frequent customer rejections.
حل: Implementation of a highcapacity fine material washer with an integrated attrition cell and cyclonebased fines recovery system.
نتيجا: Reduced deleterious materials content from >6% جي طرف <0.5%. The recovered fines were sold as a filler material. Overall plant profitability increased by an estimated $12/ton on washed concrete sand.
Alluvial Gravel Pit Operator – Western Canada
چيلنج: Seasonal freezing conditions caused severe downtime during spring thaw due to sedimentladen process water that could not be effectively clarified for recirculation.
حل: Contract manufacturing of a modular washing plant featuring a highcapacity deep cone thickener for rapid solids settling and sludge densification.
نتيجا: Achieved closedloop water recycling within 48 hours of seasonal startup versus the previous twoweek average. Reduced fresh water procurement costs by over $45,000 annually and ensured consistent earlyseason production.
7. تجارتي خيالات
Our contract manufacturing model provides flexibility tailored to your operational scale:
قيمت جا درجا: گنجائش جي بنياد تي (ٽي پي ايڇ) and complexity—from standard singlescrew washer packages (300 ٽي پي ايڇ).
اختياري خاصيتون / واڌارو: Common upgrades include automated polymer dosing systems for fines flocculation , ريموٽ مانيٽرنگ ٽيليميٽيڪس پيڪيجز , اسپيئر پارٽس اسٽارٽر کٽ ,and custom discharge chute configurations .
سروس پيڪيجز: Choose from annual preventative maintenance inspections , guaranteed parts availability programs with defined SLAs ,and ondemand technical support .
فنانسنگ جا اختيار: We work with thirdparty financial institutions who specialize in heavy equipment financing . Solutions include capital leases , آپريٽنگ ليز ,and leasetoown structures designed around project cash flow .
8. FAQ
Q1: Is your equipment compatible with our existing crushing plant setup?
ها . Our systems are designed as both standalone plants or as bolton modules . We require your existing plant’s discharge conveyor height , فيڊ جي شرح ,and available power specifications . Our engineering team will provide detailed interface drawings .
Q2:اسان جي مجموعي ٻوٽي جي throughput تي متوقع اثر ڇا آهي?
By eliminating bottlenecks at the washing stage , most operations see an increase in total usable output . Field data shows plants often realize a net gain of between1020 %in salable tons per hour due reduced waste material handling .
Q3:What are typical lead timesfor contractmanufactured equipment?
Lead times varyby complexity . For standard designs we maintain partial inventoryof key components ;typical delivery is1418 weeksfrom order approval . Custom engineered solutions require2226 weeksfor full fabrication assembly testing .
Q4:What commercial terms do you offer?
Standard commercial terms involvea progress payment schedule tiedto major manufacturing milestones :30 %upon order40 %upon major fabrication completion25 %upon completionof factory acceptance testing5 %upon shipment .
Q5:What levelof operator trainingis provided?
We include comprehensive onsite trainingfor both operationsand maintenance crewsas partof commissioning This covers normal startup/shutdown procedures routine maintenance troubleshooting guidesand safety protocols Documentation includesfull electrical schematics parts manuals lubrication schedules
Q6:Canyour systems handle recycled concreteor asphalt millings(ريپ)?
Yes but this requires specific configuration Heavily soiledor contaminated C&D debris often needs enhanced attrition scrubbing We recommend providinga sampleof your feedstockfor pilot testingto determine the optimal machine parameters
Q7:Doyou provide performance guarantees?
We provide mechanical performance guaranteescovering workmanship materials Additionally we can establish process performance criteria basedon pilot test resultsor agreedupon feed specifications These are detailed within the commercial proposal








