جي Chinese Gold Mining Equipment Fabricator - KefidGroup ڪمپني
جي

Chinese Gold Mining Equipment Fabricator

مختصر وضاحت:

1. PAINPOINT driven opening ڇا توهان پنهنجي سون جي بحالي واري سرڪٽ ۾ مسلسل رڪاوٽن کي منهن ڏئي رهيا آهيو جيڪي سڌو سنئون توهان جي هيٺئين لڪير تي اثر انداز ڪن ٿا? Common operational challenges with gold mining equipment include inconsistent feed rates leading to process instability, premature wear of critical components in abrasive slurry environments causing unplanned downtime, and inefficient separation resulting in measurable gold losses…


پيداوار جي تفصيل

پراڊڪٽ ٽيگ

1. PAINPOINT driven اوپننگ

ڇا توهان پنهنجي سون جي بحالي واري سرڪٽ ۾ مسلسل رڪاوٽ کي منهن ڏئي رهيا آهيو جيڪي سڌو سنئون توهان جي هيٺئين لائن تي اثر انداز ڪن ٿا? Common operational challenges with gold mining equipment include inconsistent feed rates leading to process instability, premature wear of critical components in abrasive slurry environments causing unplanned downtime, and inefficient separation resulting in measurable gold losses to tailings. اهي مسئلا مقدار جي قابل خرچن ۾ ترجمو ڪن ٿا: hours of lost production during component changeouts, ongoing expenditure on replacement parts, and the permanent loss of recoverable value. How do you stabilize your operation to achieve predictable throughput, extend the service life of highwear items, and maximize recovery rates from every ton of ore processed? The solution lies in specifying equipment engineered specifically for the demanding lifecycle of a gold mining operation.

2. پيداوار جو جائزو

هي پراڊڪٽ لائن ڳري ڊيوٽي تي مشتمل آهي, ماڊلر سون جي کوٽائي جو سامان designed for the concentration, جدائي, and recovery of gold from alluvial and hard rock sources. The operational workflow is engineered for integration into existing plants or new installations:

1. کاڌ خوراڪ جي تياري: Scalping or scrubbing modules remove oversized material and clays to ensure optimal downstream processing.
2. ڪشش ثقل ڪنسنٽريشن: Dense media separation or centrifugal concentrators isolate highspecificgravity gold particles from gangue material.
3. جدائي & جمع: Specialized sluices, جيگس, or shaking tables provide final concentration into a clean heavy mineral fraction.
4. سيڪيورٽي & سنڀالڻ: Integrated locking mechanisms and streamlined collection points secure the valuable concentrate.

Application scope includes primary ore processing, scavenging from milled product, and tailings reprocessing. Key limitations involve feed particle size compatibility; optimal recovery is achieved within specified size ranges, and extremely fine (<10 مائڪروون) liberated gold may require supplementary chemical processes.

3. بنيادي خاصيتون

ماڊل فريم ڊيزائن | ٽيڪنيڪل بنياد: گڏهه, hightensile steel construction with standardized interfaces | آپريشنل فائدا: Enables rapid onsite assembly without specialized welding crews and permits easy future circuit reconfiguration | ROI اثر: تائين انسٽاليشن وقت گھٽائي ٿو 40%, مزدورن جي خرچن کي گھٽائڻ ۽ وقت جي پيداوار کي تيز ڪرڻ.
Abrasion Resistant لائنر سسٽم | ٽيڪنيڪل بنياد: Interchangeable liners made from proprietary chromium carbide steel or polyurethane composites | آپريشنل فائدا: Protects structural components from wear, maintaining critical tolerances for separation efficiency over extended periods | ROI اثر: Extends liner service life by 23x compared to standard AR steel, جزوي تبديلي جي تعدد ۽ انوینٽري جي قيمتن کي گھٽائڻ.
متغير فريڪوئنسي ڊرائيو (وي ايف ڊي) ڪنٽرول | ٽيڪنيڪل بنياد: Precision electric motor control allowing realtime adjustment of vibration frequency, اسٽروڪ ڊگھائي, or table speed | آپريشنل فائدا: Operators can finetune equipment response to varying feed grades and particle sizes without stopping the process | ROI اثر: Optimizes recovery yield across different ore batches; فيلڊ ڊيٽا هڪ عام ڏيکاري ٿو 38% improvement in overall recovery efficiency.
LowWater Consumption Circuitry | ٽيڪنيڪل بنياد: Recirculating water system design with integrated settling weirs and sumps | آپريشنل فائدا: Minimizes fresh water makeup requirements and reduces the volume of slurry for tailings management | ROI اثر: تائين پاڻي جي خريداري ۽ پمپنگ جي خرچن کي گھٽائي ٿو 60%, a critical advantage in waterscarce regions.
SecurityFocused Access Design | ٽيڪنيڪل بنياد: Lockable inspection hatches and concentrate collection points with tamperevident seals | آپريشنل فائدا: Provides controlled access to valuable concentrates throughout the shift cycle, enhancing security protocols | ROI اثر: Mitigates risk of valuable material loss, ensuring accountedfor production.

4. مقابلي جا فائدا

| ڪارڪردگي ميٽرڪ | انڊسٽري معيار | Gold Mining Equipment Solution | فائدو (% سڌارو) |
| : | : | : | : |
| ناڪامي جي وچ ۾ وچولي وقت (Critical Liners) | 750 1,000 ڪلاڪ | 2,200 2,800 ڪلاڪ | +147% |
| آن سائيٽ اسيمبلي جو وقت (for a standard module) | 80120 ڪلاڪ | 4565 ڪلاڪ | 43% |
| پاڻي جو استعمال في ٽين پروسيس ٿيل (Recirculating Systems) ~30 m³/tonne ~12 m³/tonne |60% |
| Recovery Efficiency on 100 mesh alluvial feed (ڪنٽرول ٽيسٽ ۾) ~92% capture ~9698% capture |+46% absolute |

5. ٽيڪنيڪل وضاحتون

قابليت / درجه بندي: کان ماڊل انحصار throughput 50 TPH for pilot/test plants to 400 TPH for largescale alluvial operations.
بجلي جي گهرج: اليڪٽرڪ موٽر ڊرائيو کان وٺي 7.5 kW کان 110 kW في ماڊل; plant voltage standards (415V/3/50Hz or 480V/3/60Hz) accommodated.
مواد جي وضاحت: بنيادي جوڙجڪ: ASTM A572 گريڊ 50 اسٽيل. ڪپڙا مٿاڇري: AR400500 steel or proprietary cast chromium carbide alloy. Contact surfaces for corrosion resistance: SS316 or HDPE.
جسماني طول و عرض: Modular units designed for standard shipping container widths; typical module footprint ranges from 4m x 6m to 8m x 12m.
ماحولياتي آپريٽنگ رينج: 20 ° C کان + 50 ° C تائين محيطي درجه حرارت لاء ٺهيل; dustproof (IP65) برقي اجزاء; optional packages available for highhumidity or marine environments.

6. درخواست جا منظر

اولهه آفريڪا ۾ آليويل پلاسر آپريشن

چيلنج: A largescale placer mine experienced significant gold losses in fine (80 ميش) fractions using traditional sluices, alongside high maintenance downtime due to abrasive sand wear on equipment.
حل: Implementation of a multistage circuit featuring lowwater consumption scrubbers followed by a series of highG centrifugal concentrators as the core gold mining equipment.
نتيجا: Plant recovery efficiency increased from an estimated 88% جي طرف 95%. Liner replacement intervals extended from every 6 هر هفتي تائين 4 مهينا. Total water consumption was reduced by over half.

Hard Rock Tailings Reprocessing Project

چيلنج: A historical tailings storage facility contained an estimated economic grade of locked fine gold but presented a lowmargin operation requiring exceptionally low operating costs.
حل: Deployment of a compact, modular gravity separation plant focused on highthroughput classification and efficient concentration via enhanced shaking tables with VFD control.
نتيجا:The plant achieved a consistent recovery rate of over 85%of liberated gold at a processing cost under $12 في ٽين پروسيس ٿيل,prompting expansiontoasecondtailings site within18 months.

7.تجارتي خيالات

Equipment pricing is tiered based on capacityand complexity:
• Standard Module Series(50150 ٽي پي ايڇ):Offers core featuresfor defined applications.Capexfocused entry point
• HighCapacity Series(150400 ٽي پي ايڇ):Includes advanced VFD controls automated monitoring sensorsand premium liner materials
• Custom Engineered Solutions:Tailored designsfor specific orebodiesor space constrained siteswith pricingon application

Optional featuresinclude remote monitoring telemetry packages automated grease systemsand washdown systemsfor dust control

Service packagesare availablefrom basic commissioningand operator trainingto comprehensive annual maintenance contracts with guaranteed spare parts availabilityChinese Gold Mining Equipment Fabricator

Financing optionscan be structured through partner institutions including equipment leasing programsor milestonebased payment plansfor project deployments

8.FAQ

ق:What levelof feed preparationis requiredbefore your gravity concentration equipment?
اي:Ideal feed should be screenedto themanufacturer’s specified top sizewith clays broken apartFor hard rock circuits grindingto at least minus20 meshis recommendedfor effective liberationOur team can adviseon necessary upstream preparation

Q How does thisequipment integratewith our existing cyanidationor flotation circuit?
A Our gravity concentration unitsare commonly installedas aprimary recovery method aheadof leach circuitsto capture coarse freegold reducing leaching timeand consumptionThey can alsobe usedas ascavenger after millingto pull out remaining freegold before chemical processes

Q Whatisthe typical delivery lead timeforastandard configuration?
A Forstandard series modelslead timesrange between14and20 weeksfrom order confirmation dependingon current production cyclesCustom solutionsrequire additional engineeringtimewhich willbe detailedin aproposalChinese Gold Mining Equipment Fabricator

Q Are performance guaranteesprovided?
A Yesperformance criteria suchas minimum recovery rateswithin aparticlesize rangeor maximum power consumptionare establishedduringthe sales processbasedon representative ore samplesThese form partofthe commercial agreement

Q What trainingis providedfor our operations team?
A Comprehensive trainingis included covering safe operation routine maintenance troubleshooting proceduresand liner changeout protocolsTraining occurs during commissioningat your sitewith manualsand video resources provided

Q Do you offer spare parts kits?
A We recommendand offerinitial critical spare parts kits tailoredtoyour expected12 monthsof operationThis minimizesdowntime whileyou establish local inventoryKits typically includewear liners screen panels specialized sealsand drive belts

پنهنجو پيغام ڇڏي ڏيو

پنهنجو پيغام هتي لکو ۽ اسان ڏانهن موڪليو

پنهنجو پيغام ڇڏي ڏيو