جي Cement Plant Equipment Producer Specification - KefidGroup ڪمپني
جي

Cement Plant Equipment Producer Specification

مختصر وضاحت:

ھدف پلانٽ مينيجرز & انجنيئرنگ ٺيڪيدار: Optimizing Clinker Cooling for Peak Kiln Efficiency Are your kiln output and plant profitability limited by inefficient clinker cooling? Inconsistent cooling rates directly impact grindability, increasing specific power consumption in the finish mill by 815%. Excessive cooler air leakage not only wastes energy but can lead to thermal shock…


پيداوار جي تفصيل

پراڊڪٽ ٽيگ

ھدف پلانٽ مينيجرز & انجنيئرنگ ٺيڪيدار: Optimizing Clinker Cooling for Peak Kiln Efficiency

Are your kiln output and plant profitability limited by inefficient clinker cooling? Inconsistent cooling rates directly impact grindability, increasing specific power consumption in the finish mill by 815%. Excessive cooler air leakage not only wastes energy but can lead to thermal shock and reduced refractory life in the kiln discharge zone. ان کان سواء, unreliable grate plate systems cause frequent, unplanned shutdowns for maintenance, سراسري قيمت 1824 hours of lost production per incident. Are you managing high maintenance costs from abrasive clinker wear and struggling to meet increasingly stringent emission targets due to nonoptimized air flows? حق rotary clinker cooler is not just a heat exchanger; it is a critical determinant of your plant's thermal efficiency, equipment longevity, and operating cost structure.

پيداوار جو جائزو: HighEfficiency Rotary Clinker Cooler

هي rotary clinker cooler هڪ مضبوط آهي, cylindrical heat recovery unit installed at the discharge end of the cement kiln. Its primary function is to reduce clinker temperature from approximately 1200°C to below 100°C for handling while recovering and redirecting hot secondary air back to the kiln and tertiary air to the calciner.

آپريشنل ڪم فلو:
1. Infeed & ورهائڻ: Incandescent clinker from the kiln discharges onto internal lifting flights within the rotating shell.
2. CounterCurrent Heat Exchange: جيئن شيل گھمندو آهي, clinker is lifted and cascaded through a controlled flow of ambient cooling air introduced at the discharge end.
3. Controlled Residence Time: The rotation speed and internal flight design govern material travel time, ensuring precise cooling.
4. گرمي جي بحالي: Hot air exiting the cooler (secondary/tertiary air) is channeled back to combustion processes.
5. خارج ٿيڻ: Cooled clinker exits via a sealed outlet for conveyance to storage.

ايپليڪيشن جو دائرو: Ideal for medium to large capacity cement production lines with rotary kilns. This technology is particularly effective where consistent clinker quality and maximized heat recovery are priorities.
حدون: Requires stable kiln operation for optimal performance; not typically suited for very small plants or those using nonrotary kiln technologies.

بنيادي خاصيتون: قابل اعتماد لاء انجنيئر & ROI

Advanced Lifting Flight Design | ٽيڪنيڪل بنياد: Optimized cascade profile based on granular material dynamics | آپريشنل فائدا: Creates a uniform curtain of clinker for maximum gassolid contact and even cooling | ROI اثر: Improves heat recovery efficiency by up to 72%, reducing specific fuel consumption.

ماڊل گريٽ پليٽ سسٽم | ٽيڪنيڪل بنياد: هاء ڪروم, abrasionresistant alloy castings with bolted assembly | آپريشنل فائدا: Allows for individual plate replacement during scheduled maintenance, گھٽ ۾ گھٽ وقت گھٽائڻ | ROI اثر: Cuts coolerrelated maintenance downtime by an estimated 40% سالانه.

Hydrostatic ڊرائيو سسٽم | ٽيڪنيڪل بنياد: Multimotor girth gear drive with variable frequency control | آپريشنل فائدا: هموار مهيا ڪري ٿي, reliable rotation with precise speed control under varying loads | ROI اثر: ڊرائيو ٽرين جي ڊگھي عمر کي وڌايو, reducing major drive system overhaul costs over a 10year lifecycle.

Enhanced Sealing Solutions | ٽيڪنيڪل بنياد: Multistage labyrinth seals combined with pneumatic sealing at inlet/outlet | آپريشنل فائدا: Dramatically reduces false air infiltration (to below 10% of total airflow) | ROI اثر: Improves kiln combustion efficiency and can reduce ID fan power draw.

Intelligent Cooling Air Control | ٽيڪنيڪل بنياد: Segmented plenum chambers with independently adjustable fans | آپريشنل فائدا: Enables zonebased cooling control to match clinker bed conditions and temperature profile | ROI اثر: Optimizes power consumption of cooler fans and improves final clinker quality.

Predictive Maintenance Integration | ٽيڪنيڪل بنياد: Standardized ports for thermal imaging, vibration جي نگراني, and condition sensors | آپريشنل فائدا: Facilitates realtime health monitoring of bearings, ڊرائيو, and shell integrity | ROI اثر: بحالي کي رد عمل کان اڳڪٿي ڪرڻ ۾ تبديل ڪري ٿو, تباهي کان بچڻ.

مقابلي جا فائدا

| ڪارڪردگي ميٽرڪ | انڊسٽري معيار (Reciprocating Grate Cooler) | Our Rotary Clinker Cooler Solution | فائدو (% سڌارو) |
| : | : | : | : |
| گرمي جي بحالي جي ڪارڪردگي | ~6570% typical recovery rate| مسلسل >72% recovery rate demonstrated| +37% improvement in thermal efficiency |
| مخصوص پاور واپرائڻ| Higher due to grate movement & numerous fans| هيٺيون; driven only by rotation & fewer fans| تائين 15% reduction in cooler fan power |
| سار سنڀال بند وقت (سالياني)| 80120 hours for grate replacement & general upkeep| 4060 hours focused on inspection & minor parts| ~50% reduction in annual downtime |
| False Air Infiltration| عام طور تي 1525% of total cooling airflow| برقرار رکي ٿو 50% reduction in wasted fan energy |
| Clinker Temperature Outlet| Can be variable (+/ 50°C) with uneven grates| مسلسل (+/ 15°C) due to tumbling action| Improved grindability & mill output |

ٽيڪنيڪل وضاحتون

Cement Plant Equipment Producer Specification

گنجائش جي حد: Designed for kiln outputs from 2,000 TPD ڏانهن 8,000 ٽي پي ڊي.
بجلي جي گهرج: مکيه ڊرائيو موٽر(ايس): 150400 ڪلواٽ (depending on size). Cooling fan total installed power varies with configuration.
مواد جي وضاحت: ڪاربان اسٽيل پليٽ مان ٺهيل شيل; Internal lifting flights made from heatresistant cast steel; Inlet section lined with refractory castables.
جسماني طول و عرض (Sample for 3,500 ٽي پي ڊي): شيل قطر: 4.2م; Shell length: 28م; Total installed weight (لڳ ڀڳ): 450 ٽين.
ماحولياتي آپريٽنگ رينج: 20 ° C کان + 45 ° C تائين محيطي درجه حرارت لاء ٺهيل. Dusttight construction suitable for outdoor installation.

ايپليڪيشن منظرنامو

Modernization of Integrated Cement Plant

چيلنج: A plant in Southeast Asia operated an aging grate cooler suffering from high air leakage (>22%) and frequent grate plate failures, limiting kiln output and increasing fuel costs.
حل: Replacement with a customengineered rotary clinker cooler, including an integrated hydraulic drive and upgraded instrumentation.
نتيجا: Secondary air temperature increased by approximately 85°C. Kiln specific fuel consumption decreased by over 3%. Annual maintenance hours on the cooler system were reduced by nearly 300 hours within the first year.

Expansion Project for Growing Producer

چيلنج: An engineering contractor required a reliable cooling solution for a new production line where space was constrained and operational simplicity was valued over complex mechanical systems.
حل: Installation of a single rotary clinner cooler as part of the greenfield plant design.
نتيجا: The simpler layout reduced civil costs. The robust design allowed plant operators to achieve stable operation faster during commissioning. Field data shows the unit has consistently met guaranteed capacity and outlet temperature specifications since startup.

تجارتي خيالات

قيمت جا درجا: Capital cost varies significantly with capacity:
ٽائر I (6,000 ٽي پي ڊي): Fully customengineered solutions.
اختياري خاصيتون: Advanced process control package (PLC/SCADA integration), supplemental water spray system for extreme conditions, extended warranty on drive components.
سروس پيڪيجز: Choose from annual inspection packages, fullservice maintenance contracts including parts inventory management, or remote monitoring support agreements.
فنانسنگ جا اختيار: Available through partner institutions include traditional equipment leasing structures or projectbased financing solutions tailored for large capital expenditures.

اڪثر پڇيا ويا سوال (FAQ)

1. Is this rotary clinker cooler compatible with our existing kiln system?
A full engineering assessment is required. Our team reviews your existing kiln discharge housing geometry, elevation points,and material handling interfaces to design a compatible retrofit solution that minimizes disruption.Cement Plant Equipment Producer Specification

2. What is the typical impact on overall plant thermal efficiency?
Field data shows that replacing an inefficient older cooler can improve overall plant thermal efficiency by between 1% ۽ 4%, primarily through higher secondary/tertiary air temperatures which directly lower main burner fuel requirements.

3. How does this equipment handle variations in clinker quality or granulometry?
The tumbling action of a rotary cooler is generally more forgiving than grate systems regarding fines content or slight variations in pellet size.The controlled residence time ensures even coarse particles are adequately cooled before discharge.

4. What are standard commercial terms like delivery timeframe?
For standard capacity models,the delivery period ranges from 12 months exworks after final design approval.Customengineered largecapacity units require longer lead times.Detailed project schedules are provided upon request.

5.

پنهنجو پيغام ڇڏي ڏيو

پنهنجو پيغام هتي لکو ۽ اسان ڏانهن موڪليو

پنهنجو پيغام ڇڏي ڏيو