500 Tph Gold Mining Washing Plant Manufacturers Sample
1. PAINPOINT driven اوپننگ
ڇا توهان پنهنجي اعلي حجم سون جي آپريشن ۾ وڌندڙ آپريشنل خرچن ۽ غير متوقع وصولي جي شرح کي منهن ڏئي رهيا آهيو? انتظام a 500 TPH throughput مختلف چئلينج پيش ڪري ٿو جيڪي سڌو سنئون توهان جي هيٺئين لائن تي اثر انداز ڪن ٿا. عام درد جون پوائنٽون شامل آهن:
اعلي پاڻي واپرائڻ & ٽائلنگ جو انتظام: Traditional scrubbing and screening can consume 500800 cubic meters of water per hour, creating massive settling pond requirements and environmental compliance costs.
ClayBound Gold Losses: Sticky clay, cemented gravels, and agglomerated fines can blind screens and encapsulate fine gold, leading to significant material bypass and lost revenue.
سار سنڀال لاءِ اضافي وقت: Abrasive feed material wears out components rapidly, leading to frequent shutdowns for screen cloth changes, bearing replacements, and scrubber drum repairs.
Inefficient Fines Recovery: Ensuring effective gold liberation and capture for particles below 1mm requires optimized attritioning and precise classification, often missed in basic setups.
اسڪاليبلٽي & Consistent Throughput: Can your washing plant maintain rated capacity with variable feed gradation without constant operator intervention and adjustment?
مرڪزي سوال آهي: توهان ڪيئن قابل اعتماد حاصل ڪري سگهو ٿا, highyield gold recovery at a 500tonperhour scale while controlling operational expenses and maximizing resource extraction? The solution lies in a purposeengineered 500 TPH gold mining washing plant.
2. پيداوار جو جائزو
اي 500 TPH gold mining washing plant is a modular, heavyduty processing system designed for the primary washing, scrubbing, اسڪريننگ, and initial gravity concentration of alluvial or eluvial goldbearing ore. Its function is to break down conglomerates, remove deleterious clays, and classify material into specific size fractions for optimal downstream recovery (مثال, سلائيس, centrifuges).
آپريشنل ڪم فلو:
1. Primary Feed & Scrubbing: رنوفمين (روم) material is fed into a robust scrubber or trommel where intense attritioning breaks down clay bonds and soft conglomerates.
2. پرائمري اسڪريننگ & Waste Rejection: Washed material is screened; oversize barren rock (+75mm or +100mm) is conveyed to waste stackers.
3. Secondary Screening & درجه بندي: The midsize fraction is further screened to isolate the target pay gravel range (مثال, 75mm to +2mm). Highpressure spray bars ensure thorough cleaning.
4. فائنس مينيجمينٽ & Slurry Routing: The undersize fraction (2ايم ايم), containing liberated fine gold, is routed as slurry to dedicated fine recovery circuits like spiral concentrators or jigs.
5. Concentrate Production: Coarse and midsize gold is recovered via integrated gravity units (مثال, ڇڪڻ واري ٽيبل, coarse mineral jigs) within the plant structure.
ايپليڪيشن جو دائرو & حدون:
دائرو: Ideal for largescale alluvial/eluvial deposits, riverine operations, and weathered conglomerate ores where gold is liberated through physical washing. Effective for feed material with high clay content.
حدون: Not suitable for hard rock (لوڊ) deposits requiring crushing or chemical leaching at this stage. ڪارڪردگي صحيح فيڊ جي خاصيت تي منحصر آهي (مٽي جو مواد, rock hardness). Requires a consistent water supply.
3. بنيادي خاصيتون
HeavyDuty اسڪربر ماڊل | ٽيڪنيڪل بنياد: Hightorque drive system with reinforced lifters | آپريشنل فائدا: Consistently processes cemented gravels and sticky clay without bogging down | ROI اثر: Maintains design throughput of 500 TPH under adverse conditions, روزاني پيداوار جي مقصدن جي حفاظت.
Modular Screen Deck Design | ٽيڪنيڪل بنياد: Independently tensioned, replaceable polyurethane screen panels on vibratory decks | آپريشنل فائدا: Rapid panel changeout (<4 hours vs. 12+ for traditional cloth) minimizes downtime | ROI اثر: Reduces maintenance downtime by over 65%, سالياني آپريٽنگ ڪلاڪ وڌائڻ.
انٽيگريڊ واٽر ريسائڪلنگ سسٽم | ٽيڪنيڪل بنياد: Cyclonefed closedloop circuit with thickener underflow return | آپريشنل فائدا: Cuts fresh water consumption by up to 70% through intelligent recycling | ROI اثر: Drastically reduces water procurement costs and tailings pond footprint/management expenses.
Optimized Slurry Distribution Network | ٽيڪنيڪل بنياد: Laminarflow launders with adjustable splitters and defined drop heights | آپريشنل فائدا: Ensures even feed distribution to gravity concentrators, preventing channeling | ROI اثر: Improves fine gold recovery efficiency by an estimated 812%, capturing more payable metal.
Centralized Grease & PLC خودڪار | ٽيڪنيڪل بنياد: Automated lubrication points monitored by a Programmable Logic Controller (پي ايل سي) with fault diagnostics | آپريشنل فائدا: Eliminates manual greasing errors; provides early warning for bearing failures | ROI اثر: Extends component life by ~30% and prevents catastrophic failures costing days of downtime.
Reinforced Structural Frame | ٽيڪنيڪل بنياد: CADoptimized steel fabrication with fatigueresistant welding at stress points | آپريشنل فائدا: Withstands constant vibration and dynamic loads in remote locations | ROI اثر: Reduces structural maintenance needs over the plant's 15+ year lifespan.
PreWired & Tested Modules | ٽيڪنيڪل بنياد: Factoryassembled modules with plugandplay electrical connections | آپريشنل فائدا: Reduces onsite installation time by approximately 40% versus stickbuilt designs| ROI اثر: Lowers installation labor costs and accelerates timetoproduction.
4. مقابلي جا فائدا
| ڪارڪردگي ميٽرڪ | انڊسٽري معيار لاء 500 TPH پلانٽس | اسان جي 500 TPH Gold Mining Washing Plant Solution | فائدو (% سڌارو) |
| : | : | : | : |
| Water Consumption (m³/hour) | 550 800 m³/h (open circuit) | 70% گھٽتائي |
| دستيابي / اپٽائم (%)| ~ 85% (high maintenance load) |>92% (design target with features above)| +7 في سيڪڙو پوائنٽس |
| Clay Disintegration Time| تائين 45 minutes retention required| <25 minutes retention required| ~45% Faster Processing |
| سٺي سون جي بحالي (92% recovery in designed range via optimized slurry handling| اندازي مطابق +8% Recovery Efficiency|
| OnSite Commissioning Time| 68 weeks typical after component arrival|34 weeks due to preassembled modules|<50% تيزيءَ سان لڳائڻ |
5. ٽيڪنيڪل وضاحتون
ڊيزائن جي صلاحيت: Nominal throughput of up to dry metric tons per hour of 200mm alluvial feed material.
بجلي جي گهرج: Total connected load approximately depending on configuration; typical primary supply requirement of .
Scrubber Module: Diameter x length trommel or drum scrubber; powered by dual motors via gear reducer drive.
اسڪرين ڊيڪس: Tripledeck vibrating screen; total screening area of ; polyurethane panel sizing standard.
مواد جي وضاحت: Abrasionresistant steel (AR400/450) at critical wear points; structural steel frame ISO certified).
جسماني طول و عرض: Modular design; largest single module typically within shipping dimensions .
ماحولياتي آپريٽنگ رينج: کان وسيع گرمي پد لاء ٺهيل ; مٽي دٻائڻ جو نظام معياري; can be housed within a structure in freezing climates.
6. درخواست جا منظر
LargeScale Alluvial Operation in West Africa
Challenge A major operator faced severe clay blinding in their existing trommel screens losing an estimated of fine gold to tailings due to poor liberation Water costs were prohibitive at scale
Solution Implementation of a modular washing plant featuring an aggressive scrubber module highpressure spray bars on polyurethane screensand a dedicated fines recovery circuitwith water cyclones
Results Achieved consistent throughput Plant reduced fresh water consumption from per day Clayrelated downtime was eliminated Projected annual increase in recovered ounces based on improved efficiency
Eluvial Deposit Processing in South America
Challenge Variable feed gradation from highly weathered ore caused constant blockagesand surging feedto gravity concentrators leadingto inconsistent concentrate grades
Solution A customized plant design incorporateda robust grizzly feederfor scalpingsurge capacity hopperand an automated slurry density control systemto ensure steady feedto downstream units
Results Feed surges were eliminatedby the buffering system Concentrate grade variability decreasedby allowingfor more stable operationof secondary recovery circuits Overall plant throughput stabilizedat the target
7 تجارتي خيالات
Pricing for a engineered solution varies significantlybasedon customization optional featuresand sitespecific requirements
Base Configuration Tier Includes core scrubbing primary screening waste rejection conveyorsand basic slurry handling Designedfor operators addingtheir own downstream recovery circuits
Optimized Recovery Tier Includes base configuration plus integrated gravity concentration units coarse mineral jig shaking tablefor midsizeslurry distribution manifoldand advanced control panel Idealfor turnkey operations
Premium Water Management Tier Builds upon the Optimized Tier addinga complete water recycling circuitwith clarifier thickener sludge pumpand clean water holding Idealfor regionswith strict environmental regulationsor limited water access
Optional Features Mobile skidmounted versions electricor dieselhydraulic drive options onboard power generation packages dust encapsulation covers extended warranty packages
Service Packages Proactive maintenance plans remote monitoring diagnostics access trained field service engineers commissioning supervision operator training programs
Financing Options Available through partner institutions including equipment leasingoperational lease agreementsor project financing structures subjectto credit approval
8 FAQ
What upstream equipmentis requiredto feeda plant A wellsized frontend loaderor excavatorfeedinga ROM hopperwith grizzlyis typical For optimal performancea consistentfeed rateis more criticalthan exact sizing thoughprescalpingof bouldersover recommended sizeis advised
Can this plantbe integratedwith our existing cyanidationor flotation circuit Yes The plants primary functionis preparationof clean sizedgravelsand concentratedslurries These productscan be directedto your existing downstreamprocesses It effectivelyreplacesprimary crushingand washingstagesin such circuits
How many operatorsare requiredto run the plant Most plantsof this scalecan be operatedby personnelfrom a central control cab Monitoringthe PLC interface managingfeed ratesand conductingroutine checks Additional ground personnelmay be neededfor mechanical inspectionsand concentrate handling
What arethe lead timesfor deliveryand commissioning Following engineeringfinalization standardlead timesfor fabricationare months Onsite commissioningby our teamstypicallyrequires weeks dependingon site readinessand foundationpreparation
What kindof spare partsinventoryshouldwe maintain We providea recommendedcritical spares listbasedon wear rates This typicallyincludes screen panels scrubber lifters pump volutesand liners grease cartridgesand a setof common hydraulic hoses Local stockingof conveyor beltingis also advised






