250 300tph Stone Crushing Plant Companies Inspection
1. PAINPOINT driven اوپننگ
Managing a 250300tph stone crushing plant presents distinct operational and financial challenges. ڇا توهان تجربو ڪري رهيا آهيو:
اڻ شيڊول بند وقت: Unplanned stops due to feeder blockages, کولہو overloads, or conveyor misalignment, گم ٿيل پيداوار ۽ بيڪار محنت ۾ هزارين في ڪلاڪ خرچ.
نامناسب فائنل پراڊڪٽ: Fluctuations in aggregate size and shape, پراڊڪٽ رد ڪرڻ جي ڪري, reduced saleable yield, and compromised contract compliance.
اعلي آپريشنل خرچ: Spiking energy consumption from inefficient load distribution and excessive wear part replacement cycles that erode profit margins.
Bottlenecking & غير موثر وهڪري: Mismatched capacity between primary, ثانوي, and tertiary stages causing one section to wait on another, preventing the plant from achieving its designed 300tph potential.
سار سنڀال جي پيچيدگي: Timeconsuming inspections and component changes that require extended plant shutdowns.
پلانٽ مينيجرز لاء مرڪزي سوال آهي: توهان ڪيئن قابل اعتماد حاصل ڪري سگهو ٿا, مسلسل 250300 ton per hour output while controlling operational costs and maximizing equipment uptime? The answer lies in a holistically engineered crushing plant solution.
2. پيداوار جو جائزو
هڪ 250300tph اسٽيشنري پٿر ڪرشنگ پلانٽ هڪ مڪمل مادي پروسيسنگ سسٽم آهي جيڪو تعمير لاءِ مجموعن جي وڏي مقدار جي پيداوار لاءِ ٺهيل آهي., روڊ جو بنياد, ۽ ريلوي ballast. It integrates multiple stages of size reduction and classification into a synchronized workflow.
آپريشنل ڪم فلو:
1. پرائمري ڪرشنگ: وڏو کاڌو مواد (750mm تائين) is reduced by a robust jaw crusher or gyratory crusher.
2. ثانوي & ٽيٽيري ڪرشنگ: مواد وچولي سائيز ۾ وڌيڪ گھٽتائي لاءِ مخروطي ڪرشرن يا اثر ڪرشرن تائين پهچايو ويندو آهي.
3. اسڪريننگ & درجه بندي: وائبريٽنگ اسڪرينون ڪچري ٿيل مواد کي مخصوص سائز جي حصن ۾ الڳ ڪن ٿيون.
4. مواد سنڀالڻ: A network of belt conveyors transfers material between stages and to final stockpiles.
5. ڪنٽرول & نگراني: A centralized control system manages startup sequences, load balancing, and operational parameters.
ايپليڪيشن جو دائرو: وڏي پيماني تي ڪارخاني جي عملن لاءِ مثالي, major infrastructure projects requiring dedicated onsite aggregate production, and highcapacity commercial aggregate suppliers.
حدون: This is a capitalintensive solution requiring significant site preparation, stable electrical supply (typically high voltage), and is designed for semipermanent or permanent installation. It is not suitable for highly mobile or smallscale operations.
3. بنيادي خاصيتون
ذھني لوڊ مينيجمينٽ سسٽم | ٽيڪنيڪل بنياد: PLCintegrated amp monitoring with variable frequency drives (وي ايف ڊيز) | آپريشنل فائدا: Prevents crusher overloads and feeder blockages by automatically adjusting feed rates | ROI اثر: تائين غير منصوبابندي بند وقت گھٽائي ٿو 30% and minimizes stressrelated component failures
ماڊل پلانٽ ڊيزائن | ٽيڪنيڪل بنياد: Bolttogether sections with standardized interfaces | آپريشنل فائدا: تيز سائيٽ جي تنصيب کي فعال ڪري ٿو (~25% less time) and future reconfiguration or expansion | ROI اثر: Lowers initial installation costs and protects longterm capital investment
مرڪزي گريسنگ & لوڻ | ٽيڪنيڪل بنياد: خودڪار, programmable system delivering precise lubricant volumes to key bearing points | آپريشنل فائدا: مسلسل سڻڪ کي يقيني بڻائڻ سان برداشت جي زندگي کي وڌايو; reduces manual labor requirements | ROI اثر: Cuts lubricationrelated bearing failures by an estimated 40% and associated maintenance manhours
HeavyDuty Conveyor سسٽم | ٽيڪنيڪل بنياد: لوڊنگ پوائنٽن تي اثر بستر, abrasionresistant belts with proper tensioning | آپريشنل فائدا: Minimizes belt wear and spillage, ensuring consistent material flow between stages | ROI اثر: Reduces belt replacement costs and cleanup labor, directly supporting sustained 300tph throughput
ڳوڙھي ڊسٽ سپپريشن انٽيگريشن | ٽيڪنيڪل بنياد: Strategically placed nozzles with solenoid valves tied to crusher/screen operation | آپريشنل فائدا: Suppresses dust at source points only when needed, سائيٽ جي نمائش ۽ ماحولياتي تعميل کي بهتر بنائڻ | ROI اثر: Reduces water consumption versus constant spraying and avoids potential regulatory fines
Unified Control Cabin | ٽيڪنيڪل بنياد: Sounddampened cabin with full visualization of process flow on SCADA monitors | آپريشنل فائدا: Provides operators with a safe, ergonomic environment to monitor the entire plant from a single point | ROI اثر: Improves operational response time by 50% and enhances personnel safety
4. مقابلي جا فائدا
| ڪارڪردگي ميٽرڪ | 250300tph پلانٽس لاءِ انڊسٽري معيار | Our Engineered Solution | فائدو (% سڌارو) |
| : | : | : | : |
| مجموعي طور تي پلانٽ جي دستيابي (ماهوار) | 8892% (لڳ ڀڳ. 3540 ڪلاڪ بند وقت)| >95% (37% واڌارو |
| توانائي جو استعمال في ٽين پروسيس ٿيل| وڏي پيماني تي مختلف آهي; often suboptimal load sharing| Optimized via VFDs & efficient drive trains| فيلڊ ڊيٽا ڏيکاري ٿو 812% گهٽتائي |
| ثانوي کولہو ۾ حصو حيات ڪپڙا| Dependent on feed; inconsistent monitoring| Extended via load management & alloy options| دستاويز ٿيل 1525% سڌارو |
| تنصيب & ڪم ڪرڻ جو وقت| 810 weeks for full system integration| Streamlined modular design reduces this span| لڳ ڀڳ 25% تيزيءَ سان لڳائڻ|
| پيداوار جي ڪعبي (شڪل انڊيڪس)| Can fluctuate with feed hardness/type| Maintained via crusher chamber optimization & settings control| More consistent output within spec |
5. ٽيڪنيڪل وضاحتون
ڊيزائن جي ذريعي ظرفيت: 250 300 ميٽرڪ ٽين في ڪلاڪ (tph) ڀريل پٿر جو مجموعو.
پرائمري کولہو جا اختيار: جهيڙيندڙ (900x1200mm) يا Gyratory Crusher (4265).
ثانوي / ثانوي اسٽيج: Two units of Cone Crushers (مثال, HPC315 يا برابر).
اسڪريننگ اسٽيج: Multideck Heavyduty vibrating screens (مثال, 2 sets of 2400x6000mm).
Total Installed Power Requirement: لڳ ڀڳ 800 1000 ڪلواٽ; requires stable HV grid connection.
اهم مواد جي وضاحت: Primary frame constructed from highstrength steel (Q345B); Liner plates from Mn18Cr2 or equivalent; Abrasionresistant conveyor belting (minimum ST1250).
عام ٻوٽي جي پيرن جو نشان (ايل ايڪس ڊبليو): ~120m x 85m (varies based on stockpile layout).
ماحولياتي آپريٽنگ رينج: 20 ° C کان + 45 ° C جي محيطي درجه حرارت لاء ٺهيل; dust emission control to meet local standards below <20mg/m³.
6. درخواست جا منظر
چونا جي پٿر جي وڏي کوٽائي | چيلنج: Existing plant capped at 200tph could not meet new contract demands for road base material; bottlenecks at secondary screening caused frequent slowdowns. Solution Implementation of a new modulardesigned crushing plant configured for consistent throughput across primary jaw crushing followed by twostage cone crushing with precise screening decks integrated into the existing flow where possible Results Achieved steadystate production of over tph of specificationcompliant product within two months of commissioning reducing reliance on subcontracting crushed material by
Major Highway Construction Corridor Challenge Required establishing multiple high volume temporary aggregate plants along the corridor with fast setup teardown times each needing reliable output Solution Deployment of semi stationary plants built on modular skid bases featuring unified control cabins pre wired connections Results Each site was operational within weeks achieving target production rates Project reporting indicated lower fuelpower costs per ton produced compared to mobile fleet alternatives meeting tight project timelines
7 تجارتي خيالات
Pricing tiers are structured around core configuration choices:
1 Standard Tier Includes primary jaw crusher secondary cone crushers basic screening conveyors central control panel Designed for consistent feed material Priced as a complete turnkey system
2 Enhanced Tier Adds tertiary crushing stage automated grease systems advanced dust suppression higher capacity stockpile conveyors Suited for producing more spec products or harder feed materials
3 Custom Tier Incorporates specific customer requirements such as specialized metal detection washing systems integration with existing equipment or unique layout constraints Priced upon engineering review
Optional Features High frequency fine screening decks remote monitoring diagnostics packages automated wear part measurement systems spare parts starter kits
Service Packages Comprehensive packages are available including scheduled preventive maintenance onsite technical support annual health inspections Extended warranty options can be negotiated
Financing Options Flexible commercial terms can be arranged including leasing structures milestone based project financing or traditional equipment loans through our partnered financial institutions
8 FAQ
What are the primary electrical requirements for this tph plant The system typically requires a high voltage connection kV range with total installed power draw between kW A detailed power distribution plan is part of our pre installation engineering assessment
Can this plant be configured to produce multiple aggregate specifications simultaneously Yes through strategic screen deck selection proper conveyor routing the standard design can produce up separate spec products concurrently such as base course chipsand manufactured sand
How does your solution manage variations in feed rock hardness The intelligent load management system adjusts feeder rates automatically protecting downstream crushers For extreme variations we recommend selecting specific liner profiles chamber options during the configuration phase
What is the expected timeline from order placement to full commissioning For standard tier configurations lead time is typically months followed by weeks onsite installationcommissioning subject to site readiness Custom configurations require additional engineering time
Are training services included for our operations team Yes comprehensive training covering daily operation routine maintenance safety procedures troubleshooting is provided onsite during commissioning Documentation includes detailed operating manuals parts lists schematics








