Sand Gravel Mining Assembly Plant Datasheet

Краткое описание:

1. PAINPOINT DRIVEN OPENING Managing a sand and gravel mining operation means contending with persistent bottlenecks that directly erode profitability. Сталкиваетесь ли вы с этими общими проблемами? Непоследовательный фид & Processing Bottlenecks: Variable feedstock from the pit leads to surges and starvation in your plant, causing constant manual adjustment, снижение пропускной способности, and higher wear on crushers…


Детали продукта

Теги продукта

1. ОТКРЫТИЕ С УПРАВЛЕНИЕМ PAINPOINT

Managing a sand and gravel mining operation means contending with persistent bottlenecks that directly erode profitability. Сталкиваетесь ли вы с этими общими проблемами?

Непоследовательный фид & Processing Bottlenecks: Variable feedstock from the pit leads to surges and starvation in your plant, causing constant manual adjustment, снижение пропускной способности, and higher wear on crushers and screens.
Чрезмерное время простоя для технического обслуживания: Традиционный, hardwired plant designs with multiple conveyors and transfer points require frequent liner changes, ремонт ремня, и замена подшипников, leading to hundreds of unplanned downtime hours annually.
Высокий труд & Энергоемкость: Operating multiple standalone units—excavators, кормушки, дробилки, screens—requires significant fuel and operator hours per ton of final product.
Difficulty Meeting Spec & Загрязнение продукта: Inefficient separation and screening processes result in offspec material or crosscontamination between product stockpiles, leading to rejected loads and revenue loss.
Limited Site Mobility & High Redeployment Costs: Fixed or semimobile plants are capitalintensive to relocate, locking you into a single deposit and preventing pursuit of new market opportunities.

What if your primary processing could be consolidated into a single, intelligent unit that addresses these issues directly? The solution lies in reevaluating your plant’s core assembly.

2. ОБЗОР ПРОДУКТА: Modular Sand & Gravel Mining Assembly Plant

The Modular Sand & Gravel Mining Assembly Plant is an integrated processing system designed to replace traditional fixedplant setups. It combines primary crushing, скрининг, material washing (необязательный), and conveying into a single, trailermounted footprint. This configuration is engineered for rapid deployment and highvolume production in sand and gravel extraction.

Операционный рабочий процесс:
1. Integrated Feeding & Первичное дробление: Runofpit material is fed directly into the hopper module, which regulates flow to the integrated jaw or impact crusher.
2. Onboard Primary Screening: Crushed material is immediately conveyed to an integrated vibrating screen deck for primary size separation.
3. Product Routing & Накопление запасов: Oversize material may be recirculated or diverted, while onspec sand and aggregate fractions are conveyed via onboard stacking conveyors to designated stockpiles. An optional integrated screw washer or cyclones can be incorporated for sand classification.

Область применения:
Ideal for virgin aggregate deposits requiring primary reduction.
Suited for mediumtohigh volume operations (см. характеристики).
Effective for producing road base, бетонный заполнитель, and washed mason sand.

Ограничения:
Not designed as a tertiary finishing plant for precision asphalt chips.
Maximum feed size is constrained by the model’s integrated crusher aperture.
Requires stable ground conditions for setup without extensive civil works.

3. ОСНОВНЫЕ ХАРАКТЕРИСТИКИSand Gravel Mining Assembly Plant Datasheet

Унифицированная конструкция шасси | Техническая основа: Structural integrity analysis with centralized load distribution | Операционная выгода: Enables relocation within 2448 hours using standard heavy haul equipment | Воздействие на рентабельность инвестиций: Reduces site mobilization/demobilization costs by up to 60% compared to fixed plant construction.

Интеллектуальная система управления подачей | Техническая основа: Частотно-регулируемый привод (ЧРП) on feeder coupled with crusher amp monitoring | Операционная выгода: Automatically regulates feed rate to maintain optimal crusher cavity fill, preventing overloads and chokefed stalls | Воздействие на рентабельность инвестиций: Увеличивает производительность дробилки на 1520% while reducing liner wear costs.

Интеграция пылеподавления | Техническая основа: Pressurized water spray bars at all transfer points with particle size analysis for flow control | Операционная выгода: Maintains regulatory compliance and improves site visibility/safety without external systems | Воздействие на рентабельность инвестиций: Eliminates standalone dust control capital expenditure and reduces water consumption by 30% по сравнению с ручными системами.

Hydraulic Set Adjustment & Клиринг | Техническая основа: Centralized hydraulic power unit for crusher gap adjustment and patented clearing cylinder system | Операционная выгода: Allows operators to adjust product gradation or clear blockages from ground level in minutes | Воздействие на рентабельность инвестиций: Сокращает время простоя для плановых регулировок более чем 90% versus mechanical shim systems.

Prewired Control & Instrumentation Package | Техническая основа: PLCbased control panel with motor management diagnostics and remote monitoring capability | Операционная выгода: Provides singlepoint startup/shutdown sequence protection and identifies potential faults before failure | Воздействие на рентабельность инвестиций: Lowers electrical installation costs by ~40% and enables predictive maintenance planning.

4. КОНКУРЕНТНЫЕ ПРЕИМУЩЕСТВА

| Метрика производительности | Отраслевой стандарт (Traditional Setup) | Modular Assembly Plant Solution | Преимущество (% Улучшение) |
| : | : | : | : |
| Время развертывания (New Site)| 46 недели (строительные работы + эрекция) | 35 дни (выравнивание + connection) | ~85% быстрее |
| Операционная рабочая сила в смену| 34 персонал (кормушка,дробилка,screen ops) | 12 персонал (system oversight) | ~50% снижение |
| Расход топлива на тонну| Multiple diesel units operating independently | Single prime power source with optimized load sharing| 2025% улучшение |
| Время простоя при техническом обслуживании (Ежегодный)| 200300 часы (ремонт ремня,bearing changes)