ODM Crushing And Screening Equipment Manufacturer

Краткое описание:

ODM Crushing and Screening Equipment Manufacturer 1. PainPoint Driven Opening Every hour of unplanned downtime in your crushing circuit costs between $10,000 и $50,000 в потерянном производстве, depending on your tonnage and material value. You face three persistent challenges with your current setup: inconsistent product gradation that fails to meet spec, excessive wear on liners…


Детали продукта

Теги продукта

ODM Crushing and Screening Equipment Manufacturer

1. Открытие, управляемое PainPoint

Every hour of unplanned downtime in your crushing circuit costs between $10,000 и $50,000 в потерянном производстве, depending on your tonnage and material value. You face three persistent challenges with your current setup: inconsistent product gradation that fails to meet spec, excessive wear on liners and screens that drives maintenance budgets 1520% above projections, and the logistical headache of coordinating multiple OEMs for a single plant line. When your cone crusher is from one supplier and your screen deck from another, who takes responsibility for the bottleneck at 300 ТПХ? You need a singlesource solution that guarantees throughput, снижает рециркуляционную нагрузку, and delivers a consistent cubical product. Can your current equipment deliver 95% uptime during peak season?

2. Обзор продукта

The ODM Crushing and Screening Equipment Manufacturer provides an integrated, modular processing plant designed for hard rock and aggregate applications. This system combines a primary jaw crusher, вторичная конусная дробилка, and tripledeck vibrating screen into a single, synchronized workflow.

Операционный рабочий процесс:

  • Кормовой бункер & Фидер: Рунный материал (до 600 мм) is loaded into a heavyduty grizzly feeder, scalping off fines (40мм) to reduce wear on the primary crusher.
  • Первичное дробление: The jaw crusher reduces material to a 150mm nominal product, with a hydraulic wedge adjustment for closedside setting (CSS) changes in under 5 минуты.
  • Вторичное дробление & Скрининг: Material is conveyed to the cone crusher, which operates in closed circuit with the tripledeck screen. Негабаритный (+25мм) is recirculated; средний размер (1025мм) is stockpiled; штрафы (010мм) are separated.
  • Транспортировка конечного продукта: Three independent discharge conveyors allow simultaneous stockpiling of multiple fractions.
  • Область применения: Ideal for mediumtolarge quarries (200500 ТПХ), concrete aggregate production, and road base material. Ограничения: Не рекомендуется для липких глинистых материалов, превышающих 15% moisture content without a dedicated washing system.

    3. Основные функции

    HeavyDuty Roller Bearing Cone Crusher | Техническая основа: Eccentric bushing design with spherical thrust bearings | Операционная выгода: Handles high eccentric throws (up to 30mm) for maximum reduction ratio without overheating | Воздействие на рентабельность инвестиций: Снижает рециркуляционную нагрузку за счет 1218%, lowering conveyor wear and energy consumption by 810%.

    Modular Screen Deck with Tensioned Polyurethane Media | Техническая основа: Highfrequency vibration (8501200 об/мин) с регулируемой амплитудой | Операционная выгода: Eliminates blinding on wet or nearsize material, достижение 95% screening efficiency at 10mm aperture | Воздействие на рентабельность инвестиций: Extends screen media life from 4 недели (проволочная ткань) к 1216 недели, сокращение ежегодных расходов на рекламу за счет $18,000$25,000.

    Гидравлическая система регулировки CSS | Техническая основа: Dualacting hydraulic cylinders with position feedback sensors | Операционная выгода: Your operators can change product size in 35 minutes from a remote panel, without shims or manual tools | Воздействие на рентабельность инвестиций: Reduces changeover downtime from 45 минут до 5 минуты, выздоравливает 810 production hours per month.

    Integrated PLC Control with Load Sensing | Техническая основа: Частотно-регулируемые приводы (VFD) on all conveyors and crusher motor | Операционная выгода: Automatically reduces feed rate when crusher amp draw exceeds 90% номинальной мощности, preventing stall events | Воздействие на рентабельность инвестиций: Устраняет 90% of crusher stallrelated downtime, экономия примерно $40,000 annually in repair costs.

    ODM Crushing And Screening Equipment Manufacturer

    WearLiner Package with ChromeMoly Alloy | Техническая основа: 27% хром белое железо (ASTM A532 Class III) for jaw plates and cone liners | Операционная выгода: Достижения 8,00010,000 tons per liner set in abrasive granite (2025% содержание кремнезема) | Воздействие на рентабельность инвестиций: Снижает частоту замены вкладышей на 30% по сравнению со стандартным 18% марганцевая сталь.

    SingleSource Chassis with Integrated Walkways | Техническая основа: Structural steel frame with bolted connections and OSHAcompliant handrails | Операционная выгода: Eliminates the need for separate support structures and site welding; your team can install and commission in 5 days instead of 14 | Воздействие на рентабельность инвестиций: Сохранения $15,000$25,000 in site fabrication costs and 9 дни простоя.

    4. Конкурентные преимущества

    | Метрика производительности | Отраслевой стандарт (MultiOEM) | ODM Integrated Solution | Преимущество (% Улучшение) |
    | : | : | : | : |
    | Время работы (Ежегодный) | 8588% | 9496% | +89% |
    | Рециркуляционная нагрузка | 2530% | 1518% | 40% |
    | Время переключения (CSS) | 45 минуты | 5 минуты | 89% |
    | Эффективность экрана (10мм) | 8588% | 9395% | +78% |
    | Время установки | 1421 дни | 57 дни | 64% |
    | Гарантийное покрытие | 12 месяцы (per component) | 24 месяцы (entire plant) | +100% |

    5. Технические характеристики

    | Параметр | Спецификация |
    | : | : |
    | Модель | ODM450C (Первичный/Средний) |
    | Диапазон мощности | 250450 ТПХ (depending on feed gradation and CSS) |
    | Максимальный размер подачи | 600мм (челюсть) / 120мм (конус) |
    | Требования к питанию | 450550 кВА (total installed: 380 кВт) |
    | Первичная дробилка | Челюсть: 1,100мм х 850 мм, 160 кВт двигатель |
    | Вторичная дробилка | Конус: 1,300мм диаметр головки, 220 кВт двигатель |
    | Экранная палуба | Трипледек, 2.4м х 6,0 м, 22 kW vibrator motor |
    | Характеристики материала | Рамка: Конструкционная сталь S355JR; Вкладыши: 27% CrMo alloy |
    | Физические размеры (Д х Ш х В) | 28m x 4.5m x 6.2m (transportable in 3 контейнеры) |
    | Эксплуатационная масса | 145,000 кг (fully assembled) |
    | Экологический диапазон | 20°С до +45°С; derated above 1,500m altitude |

    6. Сценарии применения

    Карьер Хард Рок (Гранит) – Midwest USA | Испытание: А 350 TPH quarry was losing 12 hours per week to screen blinding on wet granite fines (8% влага). The existing wire cloth lasted only 3 недели, and the recirculating load was 32%, choking the cone crusher. | Решение: ODM installed the integrated plant with polyurethane screen media and loadsensing VFDs. The cone crusher was set to a 19mm CSS with a 10mm screen aperture. | Результаты: Recirculating load dropped to 17%. Screen media life extended to 14 недели. Время безотказной работы увеличено с 82% к 95%. Годовые затраты на техническое обслуживание снижены на $62,000.

    Concrete Aggregate Production – Southeast Asia | Испытание: A contractor needed to produce 200,000 tons of 20mm and 10mm aggregate for a dam project within 6 месяцы. The site had limited space and a 10day mobilization window. | Решение: ODM provided a containerized version of the plant, prewired and prepiped. Установка была завершена в 6 дни. The plant was configured to produce 20mm (начальный) and 10mm (вторичный) одновременно. | Результаты: Production averaged 420 ТПХ, exceeding the target by 20%. The project was completed 3 на несколько недель раньше графика. The contractor reported zero unscheduled downtime in the first 4 месяцы.

    ODM Crushing And Screening Equipment Manufacturer

    Road Base Material – Australia | Испытание: A civil contractor required a consistent 20mm minus road base with a PI (Plasticity Index) ниже 6. The existing jawcone circuit produced excessive fines (5мм) в 35%, failing the specification. | Решение: ODM adjusted the cone crusher eccentric throw to 25mm and added a prescreen to scalp fines before the cone. The plant was run in open circuit for the primary and closed circuit for the secondary. | Результаты: Образование штрафов сократилось до 22%, meeting the PI specification. The contractor saved $15 per ton on blending costs. Завод добился 98% availability over the 8month contract.

    7. Коммерческие соображения

    Ценовые уровни оборудования (Exworks, ФОБ-порт):

  • Стандартный пакет (ODM450C): $1,250,000 – $1,450,000 (включает челюсть, конус, экран, конвейеры, ПЛК, and 12month parts warranty).
  • Премиум-пакет: $1,550,000 – $1,750,000 (adds polyurethane screen media, chromemoly liners, remote monitoring system, and 24month full warranty).
  • Пакет «под ключ»: $2,100,000 – $2,400,000 (includes site survey, проектирование фундамента, шеф-монтаж, ввод в эксплуатацию, and operator training for 5 дни).
  • Дополнительные функции:

  • Система пылеподавления (water spray or dry fog): $45,000
  • Metal detector with automatic belt stop: $12,500
  • Wireless remote control for all conveyors: $8,000
  • Запасной комплект вкладышей (челюсть + конус): $65,000
  • Пакеты услуг:

  • Базовый (Ежегодный): $18,000 – 2 site inspections, удаленная диагностика, 10% скидка на запчасти.
  • Премиум (Ежегодный): $45,000 – 4 site inspections, 24/7 удаленная поддержка, гарантированная доставка запчастей в течение 48 часов, priority service scheduling.
  • Варианты финансирования:

  • Лизтаун: 3660 условия месяца, 4.56.5% АПРЕЛЬ (при условии одобрения кредита).
  • Отсрочка платежа: 10% вниз, 90% после 90 days of commissioning.
  • Программа Трейдайн: ODM accepts competing equipment at appraised value (до $250,000 кредит).

8. Часто задаваемые вопросы

вопрос: Can the ODM plant handle recycled concrete or asphalt?
А: Да, с модификациями. For RAP (переработанный асфальт), we recommend a lower crusher speed and a water spray system to prevent material buildup. For concrete, the standard configuration works, but we advise replacing the jaw liners with a highchrome option to handle rebar wear.

вопрос: What is the lead time for a standard ODM450C plant?
А: Текущее время выполнения заказа составляет 1416 недели с момента подтверждения заказа. Сюда входит изготовление, сборка, и заводские испытания. Ускоренная доставка (1012 недели) доступен за дополнительную плату 5% платеж.

вопрос: How does the loadsensing system prevent crusher stalls?
А: The PLC monitors motor amperage in realtime. When amp draw reaches 90% номинальной мощности, the VFD on the feed conveyor reduces belt speed by 20%. If amp draw continues to rise to 95%, the feed stops entirely. This prevents the crusher from being overloaded, which is the primary cause of stall events.

вопрос: What training do you provide for my operators?
А: Our Premium and Turnkey packages include a 5day onsite training program covering: daily startup/shutdown procedures, Настройка CSS, screen media replacement, контроль износа гильзы, and basic PLC troubleshooting. We also provide a 200page operations manual and 12 months of remote support.

вопрос: Is the plant compliant with OSHA and EU safety standards?
А: Да. The plant is designed to meet OSHA 1910 and EU Machinery Directive 2006/42/EC. All guards are interlocked, walkways have antislip grating, and emergency stops are located at 10meter intervals along the conveyors.

вопрос: What is the warranty on the crusher main shaft?
А: The main shaft on both the jaw and cone crusher carries a 5year warranty against manufacturing defects, provided the plant is operated within the specified parameters (максимальный размер подачи, CSS range, и нагрузка двигателя). This is a standard industry term for ODM equipment.

вопрос: Can I integrate my existing conveyors or screen with the ODM plant?
А: Technically, yes, but we do not recommend it. The ODM plant is designed as a synchronized system. Using thirdparty components often leads to mismatched belt speeds, incorrect chute angles, and reduced overall efficiency. We offer a retrofit package that includes adapters and a PLC reprogram, but this typically reduces the overall warranty to 12 месяцы.

Оставьте свое сообщение

Напишите свое сообщение здесь и отправьте его нам

Оставьте свое сообщение