Китай 500 Обогатительная фабрика для добычи золота Tph
Китай 500 Обогатительная фабрика для добычи золота TPH: HighCapacity Alluvial Gold Recovery Solution
Operational Challenges in LargeScale Gold Recovery
Your operation faces three persistent bottlenecks: declining recovery rates below 85% due to claybound feed material, unplanned downtime exceeding 120 hours annually from screen blinding and pump failures, and escalating water consumption above 4,000 m³ per day for 500 Пропускная способность ТПХ. Each percentage point lost in recovery represents approximately $15,000–$25,000 in unrecovered gold value per month at current market prices. Equipment wear from abrasive quartz and lateritic clays forces complete liner replacements every 800–1,200 operating hours, adding $180,000–$250,000 in annual maintenance costs.
Can your current washing plant handle feed moisture content exceeding 18% without sacrificing throughput? Are you losing fine gold particles below 75 microns to overflow discharge? Does your existing setup require twostage crushing before washing, adding $0.40–$0.60 per ton in preprocessing costs?
Обзор продукта: Integrated Washing and Recovery System
The China 500 Обогатительная установка для добычи золота ТПХ представляет собой модульную конструкцию., skidmounted system combining rotary trommel scrubbing, highpressure spray washing, and multistage gravity concentration. Designed for alluvial, элювиальный, и выветрелые отложения твердых пород, this plant processes runofmine feed with clay content up to 40% and particle sizes up to 600 мм.
Операционный рабочий процесс:
1. Приготовление корма: Рудный материал поступает в вибрационный колосниковый питатель. (bar spacing 50–80 mm) to scalp oversize >150 мм, which discharges to a reject conveyor.
2. Trommel Scrubbing: Feed enters a 2.4 m diameter × 8.0 m long rotary trommel with internal lifters and highpressure spray bars (12–16 bar, 8 nozzles per linear meter). Retention time adjustable 45–90 seconds via variable frequency drive (ЧРП).
3. Screening and Classification: Trommel screen sections (two decks: 10 мм и 2 мм апертуры) отдельный +10 mm oversize (отклонять), 2–10 mm middlings (secondary crushing optional), и 2 мм жижи.
4. Концентрация гравитации: 2 mm slurry feeds a bank of 8–12 centrifugal concentrators (30 т/ч каждый) with automatic discharge cycles. Concentrate undergoes final upgrading via shaking tables or mercuryfree intensive cyanidation.
5. Управление водными ресурсами: Closedloop system with thickener (20 диаметр м) and filter press recovers 85–90% of process water. Makeup water requirement: 400–600 m³/day.
Область применения: Alluvial gold deposits, добыча русла реки, old tailings reprocessing, weathered gold ores. Ограничения: Not suitable for primary hardrock ores requiring crushing below 10 мм; maximum feed clay content 45% без предварительной подготовки.
Основные функции
HighIntensity Trommel Scrubbing | Техническая основа: Counterrotational lifters with 12–16 bar spray pressure | Операционная выгода: Disaggregates claybound gold particles within 60 seconds retention time | Воздействие на рентабельность инвестиций: Reduces downstream grinding energy by 30–40% and increases liberation of fine gold (75–150 micron) by 18–22%
DualDeck Modular Screen System | Техническая основа: Polyurethane screen panels with 10 мм и 2 мм апертуры, 18° slope, 1,200 RPM vibration | Операционная выгода: Eliminates screen blinding in highclay feeds through selfcleaning ball decks | Воздействие на рентабельность инвестиций: Reduces screen replacement frequency from every 400 часов до 1,200 часы; saves $12,000–$18,000 annually per screen deck
Частотно-регулируемый привод (ЧРП) Контроль | Техническая основа: 160 kW motor with VFD for trommel rotation (4–12 RPM) and feed conveyor speed | Операционная выгода: Adjusts retention time and wash intensity based on realtime feed clay content | Воздействие на рентабельность инвестиций: Optimizes water usage by 15–20% and reduces power consumption by 12% по сравнению с работой с фиксированной скоростью
Automatic Concentrator Discharge System | Техническая основа: Pneumatic pinch valves with PLCcontrolled discharge cycles (every 15–45 minutes) | Операционная выгода: Eliminates manual concentrate removal, сокращение потребности в рабочей силе за счет 2 operators per shift | Воздействие на рентабельность инвестиций: Increases concentrator availability from 85% к 96%, recovering an additional 0.8–1.2 grams per ton of feed
ClosedLoop Water Recovery | Техническая основа: 20 m highrate thickener with polymer flocculant dosing (5–15 g/m³) и 1,200 mm filter press | Операционная выгода: Recovers 85–90% of process water, reducing fresh water intake from 4,000 m³/day to 400–600 m³/day | Воздействие на рентабельность инвестиций: Lowers water procurement costs by $80,000–$120,000 annually in waterscarce regions
WearResistant Component Package | Техническая основа: Хардокс 450 steel liners (400 полупансион) in trommel feed section, панели экрана из полиуретана, ceramiclined slurry pipes | Операционная выгода: Extends component life by 2.5–3 times compared to standard mild steel | Воздействие на рентабельность инвестиций: Reduces annual maintenance costs by $45,000–$65,000 and unplanned downtime by 60 часов в год
Удаленный мониторинг и диагностика | Техническая основа: IoT sensors on 12 critical points (вибрация, температура, поток, давление) with cloudbased dashboard | Операционная выгода: Provides realtime alerts for bearing wear, ослепление экрана, and pump cavitation | Воздействие на рентабельность инвестиций: Сокращает среднее время ремонта (среднее время восстановления) от 8 часов до 2.5 часы; prevents catastrophic failures costing $30,000–$50,000 per incident
Конкурентные преимущества
| Метрика производительности | Отраслевой стандарт (500 ТПХ Заводы) | Наш 500 TPH Gold Washing Plant | Преимущество (% Улучшение) |
|||||
| Gold recovery rate (грубый >150 микрон) | 92–95% | 96–98% | 3–4% higher recovery |
| Gold recovery rate (fine 75–150 micron) | 75–82% | 85–90% | 8–10% higher recovery |
| Water consumption per ton processed | 6–8 m³/ton | 3.5–4.5 m³/ton | 35–45% reduction |
| Screen blinding frequency (за 1,000 часы) | 8–12 events | 2–4 events | 65–75% reduction |
| Trommel liner replacement interval | 800–1200 часов | 2,500–3,200 hours | 150–200% longer life |
| Power consumption per ton processed | 1.8–2.4 kWh/ton | 1.3–1.6 kWh/ton | 25–33% снижение |
| Commissioning time (с момента доставки) | 14–21 день | 7–10 дней | 50–55% faster |
| Operator requirement per shift | 4–5 operators | 2–3 operators | 35–40% reduction |
Технические характеристики
| Параметр | Спецификация |
|||
| Емкость | 500 ТПХ (номинальный), 550 ТПХ (пик, <25% глина) |
| Размер подачи | 0–600 мм (Макс 800 mm intermittent) |
| Clay Content Tolerance | До 45% (with VFD adjustment) |
| Размеры барабана | 2.4 m diameter × 8.0 m length |
| Trommel Motor | 160 кВт, 4столб, 415 V/50 Hz (или 480 V/60 Hz) |
| Область экрана | 18 м² (two decks) |
| Spray Water Pressure | 12–16 bar (регулируемый) |
| Общая установленная мощность | 380 кВт (включая конвейеры, насосы, концентраторы) |
| Water Flow Rate | 1,800–2,400 m³/hour (circulating) |
| Концентраторы | 8–12 units, 30 т/ч каждый, 3 mm max feed size |
| Thickener Diameter | 20 м (centerdrive, мягкая сталь) |
| Filter Press | 1,200 mm × 1,200 мм, 100 тарелки, 80 m³ capacity |
| Габаритные размеры (L×W×H) | 45 m × 18 m × 12 м (действующий) |
| Транспортные размеры | 4 × 40 ft containers + 2 flat racks |
| Общий вес | 185 метрические тонны (действующий) |
| Рабочая температура | 10от °С до 50 °С (with heating options for subzero) |
| Уровень шума | <85 дБ(А) в 1 м (с акустическим кожухом) |
Сценарии применения
Alluvial Gold Mining – West Africa | Испытание: Feed material contained 35–40% lateritic clay, causing severe screen blinding and reducing effective throughput to 320 ТПХ. Gold recovery dropped below 70% for particles <100 микроны. | Решение: Установлено 500 TPH plant with VFDcontrolled trommel (increased retention time to 75 секунды) and dualdeck polyurethane screens with ball decks. Added 10 centrifugal concentrators with 20minute discharge cycles. | Результаты: Throughput stabilized at 480–510 TPH. Gold recovery for 75–150 micron fraction increased from 68% к 87%. Потребление воды снижено с 7.2 m³/ton to 4.1 м³/тонна. Annual gold production increased by 22%, equivalent to $1.8 million additional revenue at $1,800/oz.
Riverbed Gold Reprocessing – Southeast Asia | Испытание: Reprocessing 15yearold tailings with 8–12% clay and high silt content (40% прохождение 75 микроны). Existing plant achieved only 55% recovery due to fines loss in overflow. | Решение: Развернуто 500 TPH plant with enhanced fine gold recovery circuit: 12 centrifugal concentrators in parallel, followed by twostage shaking table concentration. Installed thickener with 15 g/m³ flocculant dosing. | Результаты: Recovery rate for tailings feed reached 82% (против. 55% previously). Concentrate grade improved from 45 g/ton to 280 г/тонна. Срок окупаемости: 11 months based on incremental gold recovery of 1.8 г/тонна.
Weathered HardRock Gold – Central Asia | Испытание: Feed material from weathered quartz veins with 20–25% clay and 15% влага. Existing plant required twostage crushing (челюсть + конус) before washing, adding $0.55/ton in costs. | Решение: Implemented 500 TPH plant with 50 mm grizzly scalping and direct trommel feed. Added secondary scrubber for +10 мм фракция. | Результаты: Eliminated primary crushing stage, reducing preprocessing costs by $0.48/ton. Throughput maintained at 470–500 TPH. Gold recovery: 94% для +150 микрон, 83% for 75–150 micron. Annual cost savings: $720,000.

Коммерческие соображения
Ценовые уровни оборудования (FOB Shanghai, exworks):
| Конфигурация | Ценовой диапазон (доллар США) | Время выполнения | Включает |
|||||
| Стандартный (8 концентраторы, ручная разгрузка) | $680,000–$750 000 | 8–10 недель | барабан, экраны, 8 концентраторы, насосы, панель управления |
| Улучшенный (10 концентраторы, auto discharge) | $820,000–$910,000 | 10–12 weeks | Выше + 2 additional concentrators, PLC autodischarge, удаленный мониторинг |
| Премиум (12 концентраторы, полная автоматизация) | $980,000–$1,080,000 | 12–14 недель | Выше + загуститель, filter press, IoT sensors, SCADA-интеграция |
Дополнительные функции:
- Secondary scrubber for +10 мм фракция: $85,000–$110,000
- Shaking table package (4 единицы): $120,000–$145,000
- Heating system for subzero operation: $45,000–$60,000
- Mobile chassis (roadtowable): $95,000–$130,000
- Комплект запасных частей (12month operation): $55,000–$75,000
- Базовый (1 год): Удаленная техническая поддержка, 2 onsite visits, обновления программного обеспечения: $18,000/год
- Стандартный (3 годы): Выше + 4 onsite visits, приоритетная отправка запчастей, ежегодный аудит эффективности: $42,000/год
- Всесторонний (5 годы): Выше + гарантированный 92% время безотказной работы, 48hour parts replacement, обучение операторов (4 сессии): $68,000/год
- 30% авансовый платеж, 70% при доставке (стандартный)
- 20% вниз, 40% при отправке, 40% after commissioning (available for established buyers)
- Лизтаун: 36месячный срок, 8.5% АПРЕЛЬ (при условии одобрения кредита)
- Equipmentbacked financing: 12–24 months, 6–9% APR (for buyers with existing operations)
Пакеты услуг:

Варианты финансирования:
Часто задаваемые вопросы
вопрос: Can this plant handle feed with clay content exceeding 45%?
А: Стандартная конфигурация оптимизирована для 45% глина. Для более высокого содержания глины (до 60%), we recommend adding a preconditioning drum or increasing trommel retention time via VFD adjustment. Field data shows recovery rates decline by 3–5% for each 5% increase in clay above 45%. A sitespecific test is recommended before ordering.
вопрос: What is the expected gold recovery rate for fine particles (50–75 microns)?
А: For the 50–75 micron fraction, recovery typically ranges from 65–78% depending on gold morphology and clay content. Our centrifugal concentrators achieve 72–78% recovery for liberated gold in this size range. For particles below 50 микроны, recovery drops to 40–55%; we recommend adding a flotation or intensive cyanidation circuit for optimal recovery.
вопрос: How long does installation and commissioning take?
А: Подготовка сайта (бетонный фундамент, water supply) requires 10–14 days. Equipment assembly and wiring: 7–10 days with a 4person crew. Ввод в эксплуатацию и обучение операторов: 3–5 дней. Total timeline from delivery to full production: 20–28 days. We provide one commissioning engineer onsite for 10 дни.
вопрос: What is the power requirement and can it run on generator power?
А: Total installed power is 380 кВт. В 80% load factor, actual consumption is 300–310 kW. Для работы генератора, мы рекомендуем 500 дизель-генератор кВА (минимум 450 кВА). The VFD system includes softstart capability, сокращение пикового спроса за счет 35%. Fuel consumption at full load: approximately 85–95 liters/hour.
вопрос: What warranty and aftersales support do you offer?
А: Стандартная гарантия: 24 месяцев или 8,000 часы работы (смотря что наступит раньше) for manufacturing defects. Изнашиваемые детали (вкладыши, экраны, spray nozzles) are excluded. Aftersales support includes 24/7 удаленная диагностика, a regional parts warehouse (stocking 200+ критические компоненты), and guaranteed 48hour dispatch for emergency parts.
вопрос: Can this plant be expanded to 750 TPH in the future?
А: Да. The modular design allows capacity expansion by adding a second trommel module in parallel or upgrading to a 2.8 m diameter trommel. Estimated cost for 750 TPH upgrade: $320,000–$420,000. The existing thickener and filter press can handle up to 650 ТПХ; above that, additional water treatment capacity is required.
вопрос: What are the environmental compliance requirements?
А: The closedloop water system meets most international standards (IFC, World Bank) for zero liquid discharge. Хвосты (негабаритный +10 мм) are drystacked; 2 mm tailings from concentrators are thickened to 55–65% solids for dry stacking or pond disposal. Noise levels meet OSHA requirements with standard enclosures. We provide environmental compliance documentation for permitting.


