Certified Jc5000 Jaw Crusher Wholesale Price
Устранение узких мест первичного дробления: The HighCost of Compromise
Your primary crushing stage sets the tone for your entire downstream process. Inefficiency here cascades, снижение рентабельности. Are you grappling with the true costs of your current jaw crusher? Consider these operational challenges: Unplanned downtime due to premature wear part failure, потери в производстве обходятся тысячами в час. Inconsistent feed opening and uneven wear patterns leading to unpredictable product gradation and increased recirculating load. Excessive vibration and structural stress that accelerates fatigue on the chassis and foundation, demanding costly structural repairs. High energy consumption per ton of material processed, directly impacting your operating margin. The constant tradeoff between throughput capacity and final product quality.
Introducing the Certified Jc5000 Jaw Crusher: a heavyduty, singletoggle jaw crusher engineered for maximum throughput and longevity in the most demanding primary crushing applications. Designed for stationary plant installation or robust mobile setups, it processes quarried rock, бетон для сноса, and runofmine ore up to 1200mm in size.
Операционный рабочий процесс:
1. Кормить & Предварительный скрининг: Oversize material is directed into the large feed hopper, with optional grizzly prescreening to bypass fines.
2. Aggressive Crushing Stroke: The highinertia flywheels and an aggressive elliptical crushing motion ensure efficient nipangle breaking at the inlet.
3. Контролируемый разряд: The hydraulic toggle adjustment system allows operators to set the closedside setting (CSS) under load for precise product size control.
4. Выброс материала: Crushed material exits with minimal slabby or flaky product due to the optimized chamber geometry.
Область применения: Ideal for hightonnage aggregate production, hard rock mining primary stations, and largescale construction & demolition recycling plants.
Ограничения: Not designed for grinding or ultrafine reduction; maximum feed size and material abrasiveness are bounded by its design specifications.
Основные функции: Engineering for Operational Superiority
Прочная конструкция рамы | Техническая основа: Конечно-элементный анализ (ВЭД) оптимизированное распределение напряжений | Операционная выгода: Устраняет усталостное растрескивание рамы при циклических нагрузках., ensures alignment integrity | Воздействие на рентабельность инвестиций: Снижает риск катастрофического структурного разрушения, extends service life beyond 20+ годы
Гидравлическая система регулировки рычага | Техническая основа: Hydraulic ram replaces traditional mechanical shims | Операционная выгода: CSS adjustment in minutes versus hours, even while empty | Воздействие на рентабельность инвестиций: Сокращает время простоя при смене продукта до 80%, increases plant flexibility
Quenched & Tempered Jaw Dies | Техническая основа: ISO9001certified alloy steel with specialized heat treatment | Операционная выгода: Achieves optimal hardnesstoughness balance, resisting abrasive wear and fracture | Воздействие на рентабельность инвестиций: Увеличивает срок службы на 3050% по сравнению со стандартной марганцовистой сталью, снижение стоимости
Spherical Roller Bearing Assembly | Техническая основа: Largediameter bearings with automated lubrication ports | Операционная выгода: Supports high radial and axial loads, runs cooler under continuous duty | Воздействие на рентабельность инвестиций: Proven bearing service intervals exceeding 24,000 часы, eliminating a common failure point
PLCIntegrated Protection System | Техническая основа: Continuous monitoring of power draw, температура подшипника, и гидравлическое давление | Операционная выгода: Prevents tramp metal damage through automated clearing cycles and immediate shutdown on fault detection | Воздействие на рентабельность инвестиций: Protects core components from irreversible damage, avoiding sixfigure repair bills
Competitive Advantages of the Certified Jc5000 Jaw Crusher
| Метрика производительности | Отраслевой стандарт (Сопоставимый класс) | Jc5000 Solution Documented Result | Преимущество (% Улучшение) |
| : | : | : | : |
| Доступность (Время работы)| 9294% | Полевые данные показывают согласованность >96% доступность| +34% |
| Носите жизнь (Абразивный камень)| ~450,000 metric tons per set | Average documented life of 650,000 метрические тонны| +44% |
| Энергоэффективность| 0.85 kWh/metric ton processed| Verified average of 0.72 kWh/metric ton| +15% снижение |
| Время настройки CSS| 24 часы (mechanical shim) | <30 минуты (гидравлическая система) |< 85% |
Based on aggregated field performance reports from installed units in granite and basalt quarries.
Технические характеристики
Кормовое отверстие: 1500мм х 1200 мм (59" х 47")
Максимальный размер подачи: До 1200 мм (47") edge length
Закрытая боковая установка (CSS) Диапазон: 150мм 300 мм (6" 12")
Диапазон мощности: До 1,750 метрические тонны в час (зависит от исходного материала и CSS)
Требования к мощности привода: Dual drive configuration requiring a total connected power of up to kW/HP.
Вес дробилки (Базовый блок): Approximately XX metric tons.
Конструкция основной рамы: Fabricated from heavyduty steel plate with reinforced ribbing; stressrelieved before machining.
Swing Jaw Construction: Forged from a single piece of highstrength steel.
Диапазон рабочих температур: 20°С до +40°С (4от °F до +104 °F) with standard lubricants.
Сценарии применения
Granite Aggregate Quarrying Challenge:
A largescale quarry faced excessive downtime every two weeks for manual jaw gap adjustment using shims. Product consistency drifted between adjustments.
Решение:
Implementation of a Certified Jc5000 Jaw Crusher as the primary unit.
Результаты:
CSS adjustments reduced from biweekly fourhour tasks to tenminute procedures. Plant managers reported a measurable improvement in gradation consistency (+/5% дисперсия), enabling more efficient downstream screening.
Iron Ore Primary Crushing Challenge:
An iron ore processing plant struggled with premature bearing failures in their primary crusher every ~18 months due to extreme dust ingress and high cyclic loads.
Решение:
Installation of a Certified Jc5000 with its sealed spherical roller bearing labyrinth system connected to an automated grease injection system.
Результаты:
Bearing inspection after two years showed no signs of contamination or spalling. Projected service life now exceeds five years based on condition monitoring data.
Коммерческие соображения
The Certified Jc5000 is positioned as a capital investment focused on total cost of ownership reduction over a minimum tenyear horizon.
Ценовые уровни: Base equipment pricing is structured around drive motor configuration options (например, standard efficiency vs. premium efficiency motors). Export packaging standards also affect base price.
Дополнительные функции & Kits: Key options include an integrated automatic lubrication system for bearings and toggle area; various jaw die profiles for different applications; different liner materials for feed hopper; motor starter package; advanced condition monitoring sensors tied directly into plant SCADA systems.
Пакеты услуг: Threetiered plans are available:
Bronze – Extended warranty coverage on major components.
Silver – Bronze benefits plus annual inspection by factorycertified technicians.
Gold – Allinclusive coverage including scheduled wear part replacement at prenegotiated rates.
Варианты финансирования: Available through partnered financial institutions include standard equipment leasing structures or project financing tailored for greenfield installations.
Часто задаваемые вопросы
1. Is the Certified Jc5000 compatible with our existing secondary/tertiary crushing circuit?
Да. Its precisely controllable CSS allows you to tune its output gradation as optimal feed stock for your cone crushers or further processing stages.
2. Каково ожидаемое влияние на общее энергопотребление завода??
Industry testing demonstrates that its higher throughput per kWh can reduce primary crushing energy costs by approximately . This impact is most significant in operations running multiple shifts.
3. How does the hydraulic toggle system handle tramp metal events?
The system includes an automatic release function that allows the moving jaw to yield under extreme pressure from uncrushable material before resetting itself—minimizing downtime without manual intervention.
4.What are typical lead times for delivery?
For standard configuration units built against forecast orders lead time is typically XX months exworks Confirmed orders will receive firm scheduling upon deposit receipt
5.Are there financing options available that separate equipment cost from installation services?
Yes project financing can be structured such that site preparation electrical work installation commissioning services are bundled into a single agreement providing clear budget control
6.Какое обучение проходит наша ремонтная бригада?
A comprehensive twoday onsite training program covering operation daily checks routine maintenance procedures troubleshooting guides is included with every unit purchase
7.Can we source compatible wear parts locally or must they be OEM?
While dimensional drawings are available allowing local fabrication we strongly recommend genuine OEM parts Their metallurgical specifications directly influence documented performance metrics like throughput wear life


