Atacado 500 Produtor de planta de lavagem de mineração de ouro Tph
Atacado 500 TPH Gold Mining Washing Plant Producer
The Hidden Costs of Underpowered Gold Recovery Systems
Your current washing plant is processing 500 tons per hour—on paper. Na realidade, downtime from clogged screens, inadequate scrubbing, and inefficient gold recovery is costing your operation $12,000–$18,000 per day in lost production. Field audits across West African and South American alluvial sites show that plants operating below 85% availability lose 30–40% of fine gold (<100 malha) para rejeitos.
Are you still relying on multiple smaller units that require constant operator intervention? Can your existing setup handle highclay feed material without weekly screen replacements? Does your current supplier provide consistent quality across bulk orders for multiple site expansions?
Visão geral do produto: O 500 TPH Rotary Trommel & Sluice System
Esse wholesale 500 tph gold mining washing plant é modular, dieselelectric driven system designed for continuous alluvial and eluvial gold recovery operations. The equipment integrates three core processes into a single production line:
Fluxo de Trabalho Operacional:
1. Funil de alimentação & Pardo – 50ton capacity hopper with vibrating grizzly feeder (100mm bar spacing) removes oversize material before washing
2. Rotary Trommel Scrubber – 2.4m diameter × 8.0m length drum with internal lifters and highpressure spray bars (12 bar) breaks down clay agglomerates
3. DoubleDeck Vibrating Screen – 6.0m × 2.4m screen with 6mm and 2mm mesh decks classifies material for downstream processing
4. Concentrator Circuit – 4 banks of 20channel sluice boxes with expanded metal riffles and rubber matting capture free gold
5. Descarga de Rejeitos – 30m conveyor system with water recycling (85% recovery rate via hydrocyclone)
Escopo de aplicação: Alluvial gold deposits, rocha dura resistida, river terrace gravels, and old tailings reprocessing
Limitações: Não é adequado para britagem primária de rocha dura; requires feed material with <15% superdimensionado (+100milímetros) content
Recursos principais
Purificador Trommel de alta capacidade | Base Técnica: Counterrotational lifters with 12° drum angle | Benefício Operacional: 98% clay disaggregation in 90 seconds retention time | Impacto do ROI: Eliminates need for presoaking ponds, reducing water consumption by 40%
Modular Transport Design | Base Técnica: ISO containerized modules (4 × 40ft containers) | Benefício Operacional: Montagem do local em 5 days with 2 técnicos | Impacto do ROI: Reduces mobilization costs by $150,000 compared to custombuilt plants
HeavyDuty Screen Media | Base Técnica: Polyurethane modular panels with 65 Dureza Shore A | Benefício Operacional: 3,000hour screen life in abrasive quartz environments | Impacto do ROI: Decreases annual screen replacement costs by $45,000
Sistema de Lubrificação Automatizado | Base Técnica: Centralized grease distribution with 8point metering | Benefício Operacional: Reduces daily maintenance time from 2 horas para 20 minutos | Impacto do ROI: Increases plant availability from 82% para 94%
Unidade de frequência variável (VFD) Controles | Base Técnica: 160 kW motor with 0–50 Hz speed range | Benefício Operacional: Adjust trommel RPM from 8 para 16 based on feed clay content | Impacto do ROI: Optimizes power consumption by 22% in lowclay conditions
Dual Water Injection System | Base Técnica: 400 m³/hr pump capacity with 15 spray nozzles per meter | Benefício Operacional: Mantém 95% solids suspension in slurry | Impacto do ROI: Reduces gold loss to tailings by 18% in fine particle recovery
Integrated Safety Interlocks | Base Técnica: 12 paradas de emergência, sensores de desalinhamento da correia, monitoramento de temperatura dos rolamentos | Benefício Operacional: Evita falhas catastróficas nos rolamentos (média $28,000 repair cost) | Impacto do ROI: Reduz o tempo de inatividade não planejado 60%
Vantagens Competitivas

| Métrica de desempenho | Padrão da Indústria (500 Plantas TPH) | Nosso 500 Solução TPH | Vantagem |
|||||
| Taxa de recuperação de ouro (grosseiro +100 malha) | 92–95% | 97–98% | +3–5% improvement |
| Taxa de recuperação de ouro (multar 100 malha) | 65–75% | 82–88% | +13–17% improvement |
| Disponibilidade de planta (anual) | 78–85% | 92–95% | +7–17% improvement |
| Consumo de água (m³/ton processado) | 0.8–1.2 | 0.5–0.7 | 30–40% reduction |
| Screen Replacement Interval (horas) | 800–1,200 | 2,800–3,200 | +150–300% increase |
| Tempo de mobilização (dias) | 14–21 | 5–7 | 60–70% reduction |
| Consumo de energia (kWh/tonelada) | 0.45–0,55 | 0.32–0.38 | 20–30% de redução |
Especificações Técnicas
| Parâmetro | Especificação |
|||
| Classificação de capacidade | 500 tph (densidade aparente 1.6 t/m³, 15% umidade) |
| Faixa de tamanho de alimentação | 0–100 mm (grizzly oversize rejected) |
| Trommel Dimensions | Ø2.4m × 8.0m (effective washing length 6.5m) |
| Screen Deck Area | 14.4 m² (6.0m × 2.4m, deck duplo) |
| Requisito de energia | 380–480V, 50/60 hertz, 3fase, 320 kW total instalado |
| Diesel Generator | 450 kVA (opcional, for remote sites) |
| Necessidade de água | 350–400 m³/hr at 8–12 bar pressure |
| Especificações de materiais | tambor: 12mm Hardox 450 aço; Tela: Poliuretano; Sluice: 3mm stainless steel 304 |
| Dimensões Físicas | 28eu (eu) × 6.5m (C) × 7.2m (H) (operando) |
| Peso de envio | 68,000 kg (4 × 40ft container loads) |
| Temperatura operacional | 10°C a 50 °C (ambiente) |
| Umidade máxima de alimentação | 25% (por peso) |
Cenários de aplicação
Operação de ouro aluvial da África Ocidental | Desafio: Alto teor de argila (35–40%) caused 6hour daily downtime for trommel cleaning at 350 alvo tph | Solução: Instalado 500 tph plant with extended trommel (8eu) and 12bar spray system | Resultados: A produtividade aumentou para 480 tph, downtime reduced to 45 minutes/day, recuperação de ouro melhorou de 78% para 91%, annual revenue increase of $2.4 milhão
South American Terrace Deposit Reprocessing | Desafio: Existing plant recovered only 62% de ouro fino (100 malha) from old tailings, leaving $800,000/year in unrecovered value | Solução: Implantado 500 tph plant with dual sluice banks and rubber matting | Resultados: Fine gold recovery increased to 84%, período de retorno de 7 meses, tailings grade reduced from 0.8 g/t para 0.15 g/t
Central African River Gravel Operation | Desafio: Remote site required 3month mobilization for previous plant; frequent bearing failures due to abrasive sand ingress | Solução: Containerized 500 tph plant with sealed bearing housings and centralized lubrication | Resultados: Mobilization completed in 6 dias, bearing replacement interval extended from 4 meses para 18 meses, plant availability maintained at 94% over 2year period
Considerações Comerciais
Níveis de preços de equipamentos (Porta principal FOB):
- Configuração básica (dieselelétrico, standard sluice): $1,850,000–$2,100,000
- Configuração aprimorada (with centrifugal concentrator, automated controls): $2,400,000–$2,700,000
- Configuração Premium (automação completa, monitoramento remoto, reciclagem de água): $3,100,000–$3,500,000
- Additional sluice bank for fine gold recovery: $185,000
- Automated sampling system (todo 15 minutos): $95,000
- Sistema de supressão de poeira (canhões de neblina): $42,000
- Kit de peças de reposição (12fornecimento mensal): $180,000
- Garantia estendida (3 anos, parts and labor): $210,000
- Comissionamento & Treinamento (2 semanas no local): $45,000
- Contrato Anual de Manutenção (4 visitas ao site): $120,000/ano
- Monitoramento Remoto & Diagnóstico: $18,000/ano
- 30% pagamento inicial, balance upon shipment
- Carta de crédito (L/C à vista) para compradores qualificados
- Locação de equipamentos: 36–60 month terms at 6–9% APR (sujeito a aprovação de crédito)
- Descontos por volume: 5% for 2–4 units, 10% para 5+ unidades
Recursos opcionais:
Pacotes de serviços:
Opções de financiamento:
Perguntas frequentes
P: Can this 500 tph plant handle feed material with 40% teor de argila?
UM: Sim. The 8meter trommel with 12bar spray pressure and counterrotational lifters is designed for clay content up to 45%. Field data from Ghana operations shows 98% disaggregation at 38% clay with 90second retention time.
P: What is the expected gold recovery rate for fine particles (100 malha)?
UM: With the standard sluice configuration, recovery averages 82–85% for 100 malha de ouro. Adding the optional centrifugal concentrator increases this to 90–93%. Recovery for +100 mesh gold consistently exceeds 97%.
P: How many containers are required for shipping, and what are the dimensions?
UM: The plant ships in 4 standard 40foot opentop containers. O volume total de envio é 2,400 cubic feet. Each module weighs between 14,000–20,000 kg. No special heavylift equipment is required for unloading.
P: What is the lead time for wholesale orders of 5+ unidades?
UM: Standard lead time for single units is 12–14 weeks. For wholesale orders of 5+ unidades, production is staggered at 3 units per month, with first shipment at 16 weeks and full delivery within 24 semanas. Volume orders receive priority engineering support.
P: Can the plant be modified for different site conditions after purchase?
UM: Sim. The modular design allows screen mesh changes (2–12 mm), trommel speed adjustment via VFD (8–16 RPM), and sluice angle adjustment (5–12°). Retrofit kits are available for highaltitude sites (up to 4,000m) and cold climates (down to 20°C).
P: What is the warranty coverage, and what is excluded?
UM: Coberturas de garantia padrão 24 meses ou 8,000 operating hours for structural components, 12 months for wear parts (telas de bateria, sluice mats, impulsores de bomba). Exclusões: danos por operação inadequada, unauthorized modifications, normal wear on consumables, e eventos de força maior.
P: How does the water recycling system affect overall water consumption?
UM: The integrated hydrocyclone and settling tank system recovers 85% de água de processo. Net water consumption is 0.5–0.7 m³ per ton processed, compared to 1.0–1.5 m³ for plants without recycling. This reduces makeup water requirements by 60,000–80,000 liters per hour at full capacity.