Importar distribuidores de peneira vibratória de coque
1. ABERTURA ACIONADA POR PAINPOINT
Is your coke handling operation plagued by inconsistent product quality, geração excessiva de multas, and unplanned maintenance stops? Inefficient screening directly impacts your bottom line through lost product yield, increased downstream equipment wear, and costly process interruptions. Você está enfrentando atualmente:
Contaminação do Produto: Inadequate separation of breeze from furnacegrade coke, leading to customer rejections or penalties for offspec material.
Tempo de inatividade excessivo: Frequent screen deck changes and bearing failures on vibrating screens due to the abrasive nature of hot coke, interrompendo toda a sua linha de processamento.
Altos custos operacionais: Premature wear of screen cloths and components from impact and abrasion, coupled with high energy consumption from inefficient vibratory motion.
Dust and Emission Challenges: Poorly sealed or inefficient screening contributing to fugitive dust, creating environmental and housekeeping issues.
The right industrial vibrating screen is not just a piece of equipment; it's a critical process gatekeeper for profitability. How do you ensure maximum throughput of onspec coke while minimizing lifecycle costs?
2. VISÃO GERAL DO PRODUTO: Peneira vibratória de coque resistente
Este equipamento é de alta capacidade, linear motion vibrating screen engineered specifically for the scalping, dimensionamento, and dedusting of metallurgical coke and coke breeze in harsh operating environments. Seu design prioriza durabilidade, precisão de separação, and minimal maintenance.
Fluxo de Trabalho Operacional:
1. Alimentar & Distribuição: Hot or cooled coke is uniformly fed onto the robust feed box, distributing material across the full width of the top deck.
2. Separação Estratificada: The dualmass vibratory system drives a linear motion, stratifying material by size. Larger furnacegrade coke moves across the upper deck(é), while smaller fractions pass through to lower decks or collection chutes.
3. Sized Product Discharge: Precisely sized fractions are discharged from designated discharge spouts—oversize (por exemplo, +50milímetros), produto (por exemplo, 2550milímetros), and breeze (por exemplo, 25milímetros)—for routing to blast furnaces or other processes.
Escopo de aplicação: Primary and secondary screening of metallurgical coke at coke plants, siderúrgicas, and transfer stations. Suitable for hot or cold feed conditions.
Limitações: Not designed for sticky or highly moist materials without specialized deck treatments. Maximum feed temperature must be specified at time of order to ensure proper component selection.
3. RECURSOS PRINCIPAIS
DualMass Vibratory Drive System | Base Técnica: Subresonant tuned spring system with counterrotating eccentric masses | Benefício Operacional: Generates a linear throwing motion with lower dynamic forces transmitted to the support structure | Impacto do ROI: Reduces structural support costs by up to 40% and cuts energy consumption by 1525% compared to bruteforce designs.
Hot Material Deck & Construção de moldura | Base Técnica: Internally stressed frame with hightemperature alloy steel decks and heatresistant isolators | Benefício Operacional: Withstands thermal expansion from continuous hot material feed up to 200°C+ without warping or premature fatigue | Impacto do ROI: Extends structural service life by an estimated 60%, deferring major capital replacement.
Sistema de tensionamento de convés QuickChange | Base Técnica: Rubbercapped bolt tensioners with integrated clamping rails | Benefício Operacional: Allows a twoperson crew to change polyurethane or wire mesh screen panels in under two hours vs. half a shift | Impacto do ROI: Reduces labor costs per changeout by approximately 65% and increases plant availability.
Labyrinth & Grease Purge Sealing on Bearings | Base Técnica: Multistage sealing protects bearing housings from fine abrasive coke dust ingress | Benefício Operacional: Ensures lubricant integrity and prevents contamination failure in highdust environments | Impacto do ROI: Field data shows bearing life extended by over 100%, eliminating 23 unplanned stoppages annually.
Modular Discharge Spouts with Wear Liners | Base Técnica: Bolton AR400 steel liners at all material contact points | Benefício Operacional: Contém poeira nos pontos de transferência; liners are easily replaced during planned maintenance | Impacto do ROI: Cuts ongoing maintenance time for chute repairs by 50% and improves dust control compliance.
4. VANTAGENS COMPETITIVAS
| Métrica de desempenho | Linha de base padrão da indústria | This Coke Vibrating Screen Solution | Vantagem documentada |
| : | : | : | : |
| Vida útil do pano de tela (Primary Deck) | 46 months on hot duty | 812 months with recommended panels| +100% melhoria |
| Paradas Anuais Relacionadas ao Rolamento| 23 eventos por ano| 80% redução |
| Consumo de energia por tonelada filtrada| Linha de base de 100%| Média medida de 78%| 22% melhoria |
| Consistência de rendimento (±5% of target)| Degrades >10% after cloth wear| Maintains within ±7% through cloth life cycle| ~40% more consistent output |
5. ESPECIFICAÇÕES TÉCNICAS
Capacidade & Avaliação: Projetado para rendimentos de 200 para 2,500 MTPH, depending on model size and aperture selection.
Impulsione a potência: Motors range from 15 kW para 75 kW per drive unit, based on machine size and application duty.
Especificações de materiais: Main frame constructed from S355JR steel; decks from highyield strength steel; side plates lined with replaceable AR400 abrasionresistant steel; heatresistant rubber isolators.
Dimensões Físicas (Modelo de exemplo): Widths from 1.5m to 3.5m; lengths from 4.5m to 10m; multiple deck configurations available.
Faixa operacional ambiental: Faixa de temperatura ambiente: 20°C a +50°C. Continuous material temperature capability up to 200°C (special configurations up to 250°C).
6. CENÁRIOS DE APLICAÇÃO
Integrated Steel Mill – Blast Furnace Feed Preparation | Desafio: Fluctuations in crusher output led to excessive 25mm fines in BF feed stockpile, reducing permeability and increasing fuel rate variability by up to 5%. Manual sampling was unreliable.| Solução:| Installation of a primary linear motion coke vibration screen postcrusher for strict scalp removal of 25mm material.| Resultados:| Fines content in BF feed stabilized at <3%. Plant reported a measurable 2% reduction in coke rate within six months due to improved burden consistency.
Merchant Coke Plant – Product Classification & Breeze Recovery Challenge:| Existing screens generated excessive noise (>105 dB) and suffered frequent spring failures every 8 semanas,causing unpredictable downtime during peak shipping periods.| Solução:| Replacement with dualmass linear motion coke vibration screens featuring noiseabatement enclosures.| Resultados:| Sound levels reduced below 85 dB at operator stations.Spring system has operated for over 14 months without failure.Product classification efficiency improved,yielding an additional 1 .5 % recovery of saleable furnace coke from previously misscreened streams.
7 . CONSIDERAÇÕES COMERCIAIS
Equipment pricing is tiered based on machine size ,materiais de construção,and drive power .A standard carbon steel unit for ambient temperature duty represents the entry point ,while hotduty models with full abrasion lining constitute the premium tier .
Recursos opcionais incluem:
Dust encapsulation hoods
Sistemas de lubrificação automatizados
Vibration monitoring sensors with predictive analytics output
Specialized screen media types (borracha,poliuretano,fio de cunha)
Service packages range from basic commissioning support up through comprehensive multiyear performance contracts covering parts,trabalho,and scheduled inspections.Financing options including operating leases are available through partner institutions ,enabling preservation of capital budgets .
8 . Perguntas frequentes
1º trimestre : Is this vibrating screen compatible with our existing feed conveyor height constraints?
A1 : Modular design allows customization of inlet height .Providing your existing conveyor tail section dimensions allows engineering confirmation .
2º trimestre : Qual é o impacto operacional esperado durante a instalação?
A2 : A typical replacement project requires a planned shutdown window of 5 7 days for foundation preparation ,aparelhamento,and commissioning.Field crews are managedto minimize disruption .
3º trimestre : Can you supply matching screen cloth panels?
A3 : Yes .We provide both proprietaryand industrystandard tensioned panel systems.Dimensional drawings ensure fit .
4º trimestre : Quais são as condições de pagamento padrão?
A4 : Terms are typically30 % mediante pedido ,60 % preshipment,and10 % upon completionof commissioning.Custom terms can be discussedfor larger projects .
Q5 : How does performance change when screening wetcoke?
A5 : Moisture above 4 % can reduce efficiency due tobinding.We recommend heated decksor ball tray systems asan optionfor such conditions .
Q6 : Quem cuida da instalação?
A6 :We provide detailed erection manualsand can supervise installation usingyour crew ,or provide turnkey serviceswith our certified partners .
Q7 :What isthe lead timefora custom unit ?
A7 :Lead timesvaryfrom14 weeksforstandard designsto22 weeksforfully customizedhotduty units ,contingenton current foundryand fabrication schedules .


