Oem 500 Tph Gold Mining Washing Plant Quote
1. PAINPOINT DRIVEN OPENING
Are you facing escalating operational costs and unpredictable recovery rates in your highvolume gold mining operation? Managing a 500 TPH throughput presents distinct challenges that directly impact your bottom line. Common pain points include:
High Water Consumption & Tailings Management: Traditional washing plants can use over 1,500 cubic meters of water per hour, creating massive settling pond requirements and environmental compliance costs.
Frequent Downtime for Maintenance: Standard scrubbers and trommels with thin shells or inferior bearings require frequent stoppages for liner replacement and mechanical repairs, costing hundreds of production hours annually.
Inefficient Fines Recovery: Significant gold loss in the 1mm fraction due to inadequate scrubbing action or poor sluice/screen configuration represents a direct revenue leak.
High Operational Manning: Plants requiring constant manual adjustment of water flow, feed rates, and monitoring of multiple failure points increase labor costs and operational risk.
Difficulty Handling Variable Feed Material: Claybound ore or changes in feedstock density can choke standard systems, leading to prolonged cleanup cycles and reduced average throughput.
Is your current setup delivering the consistent, costperton efficiency required for profitable 500 TPH gold mining? The solution lies not just in capacity, but in intelligent, robust engineering designed for continuous heavyduty operation.
2. PRODUCT OVERVIEW
The OEM 500 TPH Gold Mining Washing Plant is a complete, modular processing system engineered for the primary washing, scrubbing, screening, and gravity concentration of alluvial or eluvial goldbearing material. It is designed to handle high clay content and produce a concentrated slurry for downstream extraction.
Operational Workflow:
1. Primary Feed & Scrubbing: Runofmine (ROM) material is fed into a heavyduty doublescreen scrubbing trommel, where intense attrition breaks down clay agglomerates and liberates gold.
2. Sizing Separation: The trommel performs precise separation into multiple size fractions (e.g., +30mm waste rock, 30mm+5mm gravels for secondary scrubbing/concentration, 5mm slurry).
3. Fines Concentration: The critical 5mm slurry containing fine gold reports to a series of cascading sluices or enhanced gravity concentrators within the circuit to maximize recovery.
4. Waste Handling: Oversize waste is conveyed to a separate stockpile, while tailings are managed via an integrated dewatering system to reduce water loss and pond footprint.
Application Scope & Limitations:
Scope: Ideal for largescale alluvial/eluvial deposits, riverine operations, and old tailings reprocessing projects requiring highvolume clay breaking and gold liberation.
Limitations: Not suitable for hard rock (lode) ore processing without prior crushing. Feed size is typically limited to 250mm. Optimal performance requires a consistent feed rate managed by upstream equipment.
3. CORE FEATURES
HeavyDuty Scrubbing Trommel | Technical Basis: Dualscreen design with internal lifters and highpressure spray bars | Operational Benefit: Achieves >95% clay disintegration even with highly cemented feed, ensuring maximum gold liberation | ROI Impact: Reduces gold losses in clay balls by an estimated 1525%, directly increasing overall recovery revenue.
Modular BoltTogether Design | Technical Basis: Prefabricated modules with flanged connections | Operational Benefit: Reduces site installation time by up to 40% compared to weldedsite builds, enabling faster commissioning | ROI Impact: Lowers capital installation costs and brings the plant to revenuegenerating status weeks earlier.
Intelligent Water Recycling System | Technical Basis: Cyclonebased closedcircuit water management with thickener option | Operational Benefit: Cuts fresh water consumption by up to 70%, minimizing environmental footprint and water licensing challenges | ROI Impact: Dramatically reduces pumping costs and settling pond construction/maintenance expenses.
Centralized PLC Control & Monitoring | Technical Basis: Industrial programmable logic controller with touchscreen HMI monitoring motor loads, feed rates, and pump pressures | Operational Benefit: Allows a single operator to manage the entire washing plant process from a control cabin, optimizing performance | ROI Impact: Lowers labor requirements by approximately 23 operators per shift while improving process consistency.
AbrasionResistant Liner Package | Technical Basis: Highchrome alloy liners at all wear points (trommel screens, chutes, launders) | Operational Benefit: Extends service life of critical components by 300400% compared to standard AR steel | ROI Impact: Reduces maintenance downtime parts replacement costs by an estimated 35% annually.
HighCapacity Slurry Distribution System | Technical Basis: Manifolded distribution system with adjustable splitters to secondary concentrators | Operational Benefit: Ensures even feed distribution across all recovery units, preventing overload and maximizing efficiency of fine gold capture | ROI Impact: Optimizes concentration ratio yield improving payback on downstream refining processes.
4. COMPETITIVE ADVANTAGES
| Performance Metric | Industry Standard for 500 TPH Plants | OEM 500 TPH Solution Documented Advantage |
| : | : | : |
| Average Clay Disintegration Rate | ~85% on tough material |>95% on equivalent feed |
| Fresh Water Consumption (m³/hour) | ~1,200 1,800 m³/hr |>70% reduction (~360 540 m³/hr) |
| Planned Maintenance Interval (Critical Trommel) | ~500750 operating hours |>2,000 operating hours |
| Fine Gold Recovery (100 mesh) Efficiency| ~7080% range |>8892% range |
| Installation & Commissioning Time (weeks) | ~1216 weeks |>810 weeks |
_Efficiency dependent on specific mineralogy; based on controlled test data._
5. TECHNICAL SPECIFICATIONS
Nominal Processing Capacity: 500 tonnes per hour (dry feed basis).
Feed Size Range: Up to 250mm.
Power Requirements: Approx. 750900 kVA total installed power (dependent on optional modules). Plant designed for 415V/50Hz or customized voltage/frequency.
Key Material Specifications:
Trommel Shell & Chutes: Mild steel with bolton highchrome alloy wear liners.
Structural Frame: Heavyduty hotrolled steel sections (S355 grade).
Screen Media: Modular polyurethane panels on primary trommel; harp screens on secondary units.
Slurry Pumps: Highwear slurry pumps with replaceable rubber liners.
Physical Dimensions (Approx., modular):
Scrubbing Module (L x W x H): 22m x 6m x 8m
Recovery Module:18m x5m x6m
Total Footprint:~40m x25m (configured).
Environmental Operating Range:
Ambient Temperature: 20°C to +50°C。
Water Source: Can be configured for fresh or recycled water systems。
6. APPLICATION SCENARIOS
Alluvial Gold Mining, West Africa| Challenge: A concession with deeply weathered, highly claybound ore was causing frequent plugging in competitor's scrubbers, resulting in an effective throughput of only ~320 TPH against a planned 500 TPH。 Significant fine gold was being lost in tailings。| Solution: Implementation of the OEM plant featuring the heavyduty dualscreen trommel with intensified spray bars, coupled with the enhanced fines recovery circuit。| Results: Achieved consistent nameplate capacity of >480 TPH。 Metallurgical accounting showed fine gold recovery improved from an estimated76%to89%, increasing overall project yield。 Water recycling cut daily freshwater demand from24,000 m³to under7,000 m³。
Eluvial Deposit Processing, Southeast Asia| Challenge: Reprocessing old mine tailings with variable density; existing equipment struggled with surges causing inconsistent feed to concentrators, leading to periodic overloading and gold loss。 High labor costs for manual monitoring。| Solution: Deployment of the OEM plant including the centralized PLC control system feeding realtime data on pump loads, along with the manifolded slurry distribution system。| Results: The automated control system stabilized feed rates, eliminating surges。 Even distribution improved concentrator efficiency by15%。 The operation reduced its required operating crew from5to2per shift。
7. COMMERCIAL CONSIDERATIONS
The investment in a robust industrialscale washing plant is structured around core functionality, scalability,and longterm support。
Pricing Tiers:
1. Base Plant Package includes core scrubbing module,primary screening,and basic sluice recovery。
2 Enhanced Recovery Package adds advanced gravity concentrators(e.g.,centrifugal concentrators)and more sophisticated control systems。
3 Turnkey Solution includes all modules,freight,sirect supervision,and commissioning。
Optional features include diesel power generation packages,mobile skidmounted versionsfor phased pit advancement,and automated sampling systems。
Service Packages are offered as annual maintenance contracts providing scheduled inspections,predictive maintenance analysis based on operational data,and guaranteed priority parts dispatch。
Financing Options available through partner institutions can include equipment leasing structures,tailored project finance solutions,and milestonebased payment plans aligned with commissioning stages。
8.FAQ
Q What upstream equipment is required?
A A consistent feed at~500TPH is essential.Typically,a large frontend loader feeding a hopperwith an apron feeder or a direct truck dump arrangementis used.Prescreeningof oversized boulders(>250mm)may be necessary dependingon deposit characteristics。
Q How does this plant handle changesin ore hardnessor clay content?
A The PLC control system allows operators adjust trommel rotational speedand spray bar pressurein realtime.The robust drive train provides sufficient torquefor demanding conditions.Field data shows it can handleclay content variationsfrom20%to60%。
Q What arethe expected operatingcostsper ton?
A While sitespecific,variable operatingcosts(power,labor,wear parts)for awellrun installation typically range between$0.$0.per processed ton.Water recyclingis themajor factorin keepingthis cost low。
Q Is training providedfor ouroperational staff?
A Yes.Comprehensive trainingfor plant managersand operatorsis includedwith purchase covering normal operation,troubleshooting,and routine maintenance procedures.Manualsare providedin both digitaland physical formats。
Q What isthe typical deliverylead time?
A Fora standard configuration lead timeis approximately2024weeksfrom orderconfirmation Exworks.Modular design allowsfor concurrent site preparation whichcan reduce overall project timeline
Q Are spare parts readily available?
A Critical wear part inventoriesare heldat regional service centers.A unique serialized part identification system ensures accurate ordering anda guaranteed48hour dispatchfor stocked critical itemsunder service agreements
Q Can thisplant be relocatedas mining faces advance?
A Yes.The modular bolttogether design allowsfordisassembly relocation andrecommissioningwithin anew sector.A dedicated relocation service teamcan manage this processto minimize downtime


