Contoh Peralatan Perlombongan Emas Borong

Penerangan ringkas:

1. PAINPOINT DRIVEN OPENING Are your gold recovery operations struggling with inconsistent yields, high operational costs, dan masa henti yang berlebihan? Inefficient material handling and processing directly impact your bottom line. Pertimbangkan cabaran biasa ini: Kadar Pemulihan Rendah: Inefficient separation leads to valuable fine gold reporting to tailings, representing a direct loss of revenue. Perbelanjaan Operasi yang Tinggi:…


Perincian produk

Tag produk

1. PEMBUKAAN PAINPOINT DRIVEN

Are your gold recovery operations struggling with inconsistent yields, high operational costs, dan masa henti yang berlebihan? Inefficient material handling and processing directly impact your bottom line. Pertimbangkan cabaran biasa ini:
Kadar Pemulihan Rendah: Inefficient separation leads to valuable fine gold reporting to tailings, representing a direct loss of revenue.
Perbelanjaan Operasi yang Tinggi: Frequent maintenance, penggunaan air yang tinggi, and excessive reagent use erode profit margins.
Masa Henti yang Ketara: Equipment failures and complex cleanup procedures halt production, menelan belanja beribu-ribu sejam dalam pengeluaran yang hilang.
Intensiti Buruh: Manual panning for cleanup or constant monitoring requires skilled personnel and increases variability.
Environmental Management Costs: Ineffective water recycling and tailings handling escalate compliance and operational expenses.

Is your current setup maximizing return on investment from every ton of ore? The right equipment is critical for addressing these systemic issues.

2. GAMBARAN KESELURUHAN PRODUK: HighCapacity Centrifugal Gold Concentrator

A centrifugal gold concentrator is a dense media separation device designed for the continuous recovery of free gold, terutamanya emas halus yang sering hilang dalam sistem berasaskan sluice tradisional. Its operational workflow enhances gravity separation efficiency through mechanical force.

Aliran Kerja Operasi Utama:
1. Penyediaan Makanan: Ore slurry is classified to optimal particle size (biasanya 6mm) and mixed with water to create a consistent feed density.
2. Kepekatan Empar: The slurry is introduced into a rapidly spinning drum or bowl. Centrifugal force amplifies gravity, driving denser gold particles to collect in retention grooves or riffles.
3. Kepekatan Berterusan & Pembersihan: While the bowl spins, concentrate is held securely. Lighter gangue materials are fluidized and flushed over the bowl's edge as tailings.
4. Automated Discharge: After a set cycle time, the concentrate is automatically discharged into a collection vessel with minimal operator intervention, ready for final refining.

Skop Permohonan & Batasan:
Sesuai Untuk: Highvolume placer operations, hard rock mill grinding circuits (as a gravity concentrator), alluvial mining, and cleanup of sluice concentrates.
Optimal For: Freemilling gold particles from fine (<100 mesh) to coarse.
Batasan: Tidak berkesan untuk terikat secara kimia (refraktori) gold or where significant clay content causes blinding without proper prewashing/scrubbing. Requires consistent feed density and particle size control for peak performance.

3. CIRI TERAS

Pemacu Frekuensi Boleh Ubah (VFD) Kawalan | Asas Teknikal: Precise motor speed regulation via solidstate electronics | Faedah Operasi: Operators can finetune Gforce for specific ore characteristics in realtime, optimizing recovery across varying feed grades | Kesan ROI: Maximizes yield from every batch; data lapangan menunjukkan a 515% increase in overall recovery compared to fixedspeed units.

Kitaran Pelepasan Automatik | Asas Teknikal: Pengawal logik boleh atur cara (Plc) managing solenoid valves and motor functions | Faedah Operasi: Enables consistent, handsoff concentrate extraction, reducing operator error and labor time per cycle | Kesan ROI: Cuts labor costs for cleanup by up to 70% and standardizes process efficiency.

Duplex Concentrate Traps | Asas Teknikal: Parallel riffle systems manufactured from abrasionresistant polyurethane | Faedah Operasi: Provides redundant gold trapping zones within a single bowl, ensuring capture even during feed fluctuations; memudahkan penyelenggaraan | Kesan ROI: Reduces risk of loss during surge events; extends wear life by over 40% compared to standard rubber liners.

Sistem Hidraulik Tekanan Rendah | Asas Teknikal: Closedloop hydraulic circuit for bowl actuation and discharge functions | Faedah Operasi: Delivers reliable high torque for smooth operation with lower heat generation and reduced risk of leaks versus highpressure systems | Kesan ROI: Decreases hydraulic service incidents by an average of 30%, lowering maintenance costs and downtime.

Contoh Peralatan Perlombongan Emas Borong

Integrated Water Manifold | Asas Teknikal: Centralized distribution block with individual flow control valves | Faedah Operasi: Allows precise adjustment of fluidization water to each section of the concentrating bowl for optimal separation efficiency | Kesan ROI: Reduces total process water consumption by an estimated 2025%, lowering pumping costs and tailings pond load.

4. KELEBIHAN KOMPETITIF

| Metrik Prestasi | Piawaian Industri (Basic Concentrators) | Penyelesaian Penumpu Emas Empar Kami | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Pemulihan Emas Halus (<100 mesh) | 6075% Estimated Recovery Rate | 9297% Verified Recovery Rate in Controlled Tests| +25% Penambahbaikan |
| Average Cycle Time (to discharge) | 90 120 minit (manual/semiauto) | 45 60 minit (fully automated cycle) | 50% Pengurangan Masa |
| Annual Liner Wear Cost (timur.)| High Frequent full liner replacement required| Low Modular duplex trap replacement only as needed| 40% Spare Parts Cost |
| Operator Attention Required| Constant monitoring & manual discharge procedure| Periodic check; PLCcontrolled automated process| 70% Intensiti Buruh |

5. SPESIFIKASI TEKNIKALContoh Peralatan Perlombongan Emas Borong

Penamaan model: GC150 HD
Kapasiti Pemprosesan: Hingga 150 meter padu buburan sejam (bergantung kepada ketumpatan makanan).
Keperluan kuasa: 30 motor pemacu utama kW (400V/50Hz atau 480V/60Hz). Hydraulic power pack: 7.5 kw.
Spesifikasi Bahan:
Bowl Structure: Hardcoated stainless steel.
Concentrate Traps / Pelapik: Abrasionresistant polyurethane.
Bingkai & Casing: Powdercoated carbon steel.
Dimensi Fizikal (L x W x H): 2.8m x 1.9m x 2.1m. Berat Kering: ~2,200 kg.
Julat Operasi Persekitaran: Suhu persekitaran: 10°C hingga +45°C. Requires covered or enclosed installation if exposed to precipitation.

6. SENARIO APLIKASI

LargeScale Placer Mining Operation | Cabaran: A North American placer mine was losing significant fine gold to tailings using traditional sluices, with high water usage and laborintensive cleanup cycles impacting profitability.| Penyelesaian: Implementation of three GC150 HD centrifugal concentrators in parallel within their wash plant circuit.| Keputusan: Plant recovery efficiency increased by 18%. Water recycling costs decreased by 22%. The operation reduced dedicated cleanup labor from three shifts to one shift daily.

Hard Rock Mill Gravity Circuit Upgrade | Cabaran:A milling operation sought to pull free gold earlier in the process to reduce overgrinding, lower cyanide consumption in leach tanks, and create a smeltable gravity product.| Penyelesaian:A single GC150 HD unit was installed postball mill on cyclone underflow to capture liberated gold.| Keputusan:The circuit now produces a direct smelting concentrate representing ~25% of total monthly production. Leach reagent consumption dropped by an estimated 15%, paying back the equipment investment in under nine months.

7. PERTIMBANGAN KOMERSIL

Peringkat Harga Peralatan:

Konfigurasi Pangkalan: Includes concentrator with PLC automation,VFD,and standard instrumentation.Pricing is structured per unit capacity.
Pakej Integrasi Tumbuhan: Adds advanced flow meters,density gauges,and communication protocols(Modbus RTU)for full SCADA integration.Optional at +12%.
Modular SkidMounting: Preassembled on a structural steel skid with walkways,facilitating faster installation.Optional at +8%.

Pakej Perkhidmatan:

1. Waranti Asas:12 months on parts and labor for manufacturing defects.
2. Pelan Sokongan Lanjutan(3 tahun):Termasuk pemeriksaan tahunan,perlindungan buruh,and discounted parts.Priced as a percentage of CAPEX.
3.
4.Sokongan Teknikal OnDemand: Remote troubleshooting assistance available via annual retainer or hourly rate.

Pilihan pembiayaan termasuk perjanjian pajakan modal pajakan operasi,and projectspecific financing through partner institutions subject to credit approval

8.Soalan Lazim

Q:What preclassification is required before feeding material into the centrifugal concentrator?
A:Ideal feed should be screened to under6mm(1/4 inci).A welldesigned vibrating screen or hydrocyclone system upstream is recommended for consistent performanceand preventing blockages

Q How does this equipment integrate with our existing wash plant or milling circuit?
A:The unitis designedfor inline installation.It features standard flanged connectionsfor slurry inputand outputand requiresa dedicated lowpressurewater supplyIntegrationwith plant control systemsis availablevia optional instrumentation packages

Q What arethe ongoingmaintenance requirementsand associatedcosts?
A Primary maintenance involves periodic inspectionand replacementof wear liners(traps).Under normal operationsthis occurs every20003000 hours.Lubrication pointsare minimalAnnual bearing inspectionis recommended.Spare partscostsare predictableand scheduled

Q Can this concentrator handle materialwith high clay content?
A Clay can cause blindingand reduce efficiency.We recommenda prescrubbingor trommel washing stagefor clayrich feeds.Testingof your specific materialin our process laboratoryis advisedto determineoptimal prep flowsheet

Q What kindof trainingis providedfor ouroperators?
A Comprehensive trainingis includedwith purchasecoveringoperationstartup/shutdownproceduresbasic troubleshootingand safetyprotocols.Thisis providedonsite duringcommissioning

Q Are theredifferent modelsfor smaller scaleor pilotplant operations?
A Yes we offera scaleddownmodelwitha capacityof50 cubic metersper hourdesignedfor pilot testingor lower throughputoperations.Specificationsvary

Q Whatisthe typical lead timefrom orderto delivery?
A Lead timesvarybasedon modeland configurationStandard unitsare typicallyavailablewithin1216 weeksfrom confirmedorderCustomizedskidmountedorspecialtyconfigurationsmay requireadditional time

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda