Borong 500 Tph Gold Mining Washing Plant Manufacturing

Penerangan ringkas:

Borong 500 Loji Pencuci Perlombongan Emas TPH: HighCapacity Alluvial Processing Solutions The Operational Challenge: When Your Feed Rate Outpaces Your Plant Capacity Every hour your gold recovery circuit operates below 500 tan per jam (Tph), you are leaving recoverable gold in the tailings. For a midtier alluvial operation processing 4,000 tan sehari, a 10%…


Perincian produk

Tag produk

Borong 500 Loji Pencuci Perlombongan Emas TPH: HighCapacity Alluvial Processing Solutions

Cabaran Operasi: When Your Feed Rate Outpaces Your Plant Capacity

Every hour your gold recovery circuit operates below 500 tan per jam (Tph), you are leaving recoverable gold in the tailings. For a midtier alluvial operation processing 4,000 tan sehari, a 10% efficiency loss translates to approximately 14–18 ounces of unrecovered gold per week—at current market rates, that is a recurring cost of $35,000 ke $45,000 dalam pendapatan yang hilang, every single week.

Plant managers in the alluvial gold sector face a specific set of constraints that directly impact profitability:

  • Feed variability: Claybound material, oversized cobbles, and highmoisture content can reduce effective throughput by 20–30% if the washing circuit lacks sufficient scrubbing energy and screening area.
  • Water management: Inefficient water recirculation systems increase makeup water demand by up to 40%, raising operational costs and complicating environmental compliance in waterconstrained regions.
  • Downtime accumulation: A washing plant that requires 4–6 hours of weekly maintenance for screen changes, servis pam, and chute cleaning loses 2–3% of annual operating time—a direct hit to your production budget.
  • Mobilization complexity: For contractors moving between sites, a plant that requires 15+ truckloads and 10 days for assembly extends nonrevenue periods significantly.
  • Does your current washing plant deliver consistent 500 TPH throughput on abrasive, clayladen feed? Can your operation maintain recovery efficiency while processing material with 30%+ kandungan tanah liat? Is your plant design optimized for rapid relocation and minimal civil works?

    Gambaran Keseluruhan Produk: The 500 TPH Alluvial Gold Washing Plant

    Peralatan ini ialah a modular, highcapacity rotary trommel washing plant engineered specifically for alluvial gold recovery at a nominal feed rate of 500 Tph. The system integrates feed hopper, hydraulicdriven rotary scrubber, skrin bergetar berbilang dek, and integrated sluice or centrifugal concentrator recovery circuit into a single, transportable processing train.

    Aliran Kerja Operasi

    1. Pemuatan Suapan: A heavyduty grizzly feed hopper (with hydraulic tipping grid) accepts direct loading from 50ton haul trucks. The 25 m³ hopper capacity absorbs loader surge, maintaining steady feed to the scrubber.
    2. Cucian Utama & Menggosok: Material enters a 2.4 m diameter × 7.5 m long rotary scrubber with 18 mm AR400 steel liners. Highenergy tumbling action (12–14 RPM) breaks down clay agglomerates and liberates gold particles from gangue material.
    3. Pemeriksaan & Pengelasan: Discharge from the scrubber passes over a doubledeck vibrating screen (2.4 m × 6.0 m). Bersaiz besar (+50 mm) reports to a radial stacker; intermediate fraction (−50 mm + 6 mm) is rejected or routed to secondary processing; bersaiz kecil (−6 mm) feeds the recovery circuit.
    4. Pemulihan Emas: The −6 mm fraction is distributed across a 2stage sluice run (12 m jumlah panjang) with expanded metal and miners moss, or alternatively directed to a bank of 6 × 20inch Knelsontype centrifugal concentrators for highergrade feed applications.
    5. Pengurusan Tailing: Tailings from the recovery circuit are dewatered via a cyclone cluster and discharged to a lined tailings dam or drystack system, with process water returned to the plant's 1,200 m³/hr recirculation system.

    Skop Permohonan

    This plant is suitable for:

  • Alluvial gold deposits with clay content up to 35%
  • Feed material with particle size up to 600 mm
  • Operations at altitudes up to 4,000 m (with derating above 3,000 m)
  • Ambient temperatures from −10°C to +45°C
  • Batasan

    Borong 500 Tph Gold Mining Washing Plant Manufacturing

  • Not designed for hardrock (utama) gold ore—requires feed precrushing to −150 mm
  • Recovery efficiency for fine gold (−75 µm) is limited to 40–55% in sluice configuration; centrifugal concentrators improve this to 70–80%
  • Anda memerlukan paling sedikit 450 m³/hr water supply at 60 m head for optimal operation
  • Ciri Teras

    HighEnergy Rotary Scrubber | Asas Teknikal: Countercurrent material flow with 12–14 RPM drum rotation creates interparticle attrition | Faedah Operasi: Breaks down clay balls and coatings in 2–4 minutes retention time, ensuring complete liberation of gold particles before screening | Kesan ROI: Eliminates the need for separate preconditioning drums, reducing capital cost by 15–20% versus twostage systems

    Modular Transportable Design | Asas Teknikal: All components mounted on 3 × 40ft flatrack containers with quickconnect piping and electrical harnesses | Faedah Operasi: Plant can be relocated and recommissioned in 5–7 days with a 25ton crane and 4person crew | Kesan ROI: Reduces mobilization costs by approximately $180,000–$250,000 per site move compared to stickbuilt plants

    AR400 AbrasionResistant Wear Package | Asas Teknikal: 18 mm AR400 steel in scrubber shell, 12 mm in screen feed box, dan 10 mm in all transfer chutes | Faedah Operasi: Service life of 12,000–15,000 operating hours before liner replacement, even on quartzrich feed | Kesan ROI: Reduces annual wear parts expenditure by 30–40% versus mild steel construction

    DualCircuit Recovery Flexibility | Asas Teknikal: Sluice runs and centrifugal concentrators are installed on independent frames with dedicated feed and discharge points | Faedah Operasi: Operators can switch between sluiceonly (daya pengeluaran yang tinggi, lower grade feed) and concentratorassisted (lower throughput, higher grade feed) without plant shutdown | Kesan ROI: Optimizes recovery efficiency across varying feed grades, improving overall gold capture by 5–8% in heterogeneous deposits

    ClosedLoop Water Recirculation | Asas Teknikal: 1,200 m³/hr settling tank array with cyclone dewatering and 4 × 8/6 F rubberlined slurry pumps | Faedah Operasi: Recovers 85–90% of process water, reducing makeup water demand to 120–180 m³/hr | Kesan ROI: Lowers water procurement and treatment costs by up to $4,500 per month in waterscarce regions

    Hydraulic VariableSpeed Drives | Asas Teknikal: Independent hydraulic motors on scrubber and screen with electronic speed control (±5% accuracy) | Faedah Operasi: Operators adjust drum speed from 8–14 RPM to match feed conditions, optimizing retention time for varying clay content | Kesan ROI: Improves washing efficiency by 10–15% on highclay feed, reducing gold loss to oversize rejection

    Integrated PLC Control with Remote Monitoring | Asas Teknikal: Siemens S71200 PLC with HMI touchscreen and optional satellite telemetry | Faedah Operasi: Realtime monitoring of feed rate, Cabutan kuasa, suhu yang mengandungi, and recovery circuit performance from a central control room or remote location | Kesan ROI: Reduces operator requirements by 1 person per shift and enables predictive maintenance, cutting unplanned downtime by 20–25%

    Kelebihan Kompetitif

    | Metrik Prestasi | Piawaian Industri (400–500 TPH Class) | 500 Penyelesaian Loji Basuh TPH | Kelebihan |
    |||||
    | Effective throughput on 30% makanan tanah liat | 320–380 TPH | 450–500 TPH | 18–32% higher |
    | Penggunaan air bagi setiap tan yang diproses | 3.5–4.5 m³/ton | 2.4–3.0 m³/ton | 25–33% lower |
    | Kecekapan pemulihan emas (−6 mm fraction) | 85–90% (sluice) | 92–96% (sluice + penumpu) | 5–8% lebih tinggi |
    | Screen media changeout time | 8–12 jam | 4–6 hours (quickrelease tensioning) | 40–50% faster |
    | Mobilization truckloads | 12–18 loads | 9–11 loads | 25–40% fewer |
    | Masa pentauliahan (di tapak) | 10–14 hari | 5–7 days | 40–50% faster |
    | Wear parts cost per ton processed | $0.08–$0.12/tan | $0.05–$0.07/ton | 30–40% lower |
    | Adanya (waktu operasi / calendar hours) | 85–90% | 92–95% | 5–8% lebih tinggi |

    Spesifikasi Teknikal

    | Parameter | Spesifikasi |
    |||
    | Nominal Feed Rate | 500 Tph (maks 550 TPH on freedigging material) |
    | Feed Top Size | 600 mm (dengan grizzly) |
    | Scrubber Dimensions | 2.4 m diameter × 7.5 m length |
    | Scrubber Speed | 8–14 RPM (hydraulic variable) |
    | Scrubber Drive Power | 2 × 75 kW hydraulic power packs |
    | Jenis Skrin | Doubledeck horizontal vibrating screen, 2.4 m × 6.0 m |
    | Screen Deck Openings | Top deck: 50 mm; Bottom deck: 6 mm (panel poliuretana) |
    | Screen Drive | 2 × 22 motor penggetar kW, 750–900 RPM |
    | Recovery Circuit | 12 m sluice run (2 × 6 m modules) ATAU 6 × 20inch centrifugal concentrators |
    | Sluice Width | 1.5 m per module |
    | Keperluan Air | 450–550 m³/hr at 60 m head |
    | Water Recirculation Rate | 1,200 m³/jam (settling tank capacity) |
    | Kuasa Terpasang | 320 kw (excluding feed conveyor and stackers) |
    | Generator Requirement | 500 kVA minimum |
    | Dimensi Tumbuhan (L × W × H) | 38 m × 12 m × 8 m (beroperasi) |
    | Dimensi Pengangkutan | 3 × 40ft flatrack containers + 2 × 20ft containers |
    | Total Transport Weight | 185,000 kg (lebih kurang) |
    | Julat Suhu Operasi | −10°C to +45°C |
    | Max Operating Altitude | 4,000 m (derate 3% per 500 m di atas 3,000 m) |
    | Tahap Kebisingan (di 10 m) | ≤ 85 db(A) |
    | Bahan Struktur | Keluli struktur S355JR, hotdip tergalvani |
    | Wear Liner Material | AR400 (18 mm scrubber, 12 mm screen feed, 10 mm chutes) |

    Senario Aplikasi

    LargeScale Alluvial Mining Operation – West Africa

    | Cabaran | Penyelesaian | Keputusan |
    ||||
    | Deposit contained 25–35% plastic clay that plugged conventional screens every 2–3 hours, reducing effective throughput to 280 Tph. Manual cleaning required 6 pekerja setiap syif. | Deployed the 500 TPH washing plant with highenergy scrubber and polyurethane screen panels. Adjusted drum speed to 13 RPM and increased water flow to 500 m³/jam. | Throughput stabilized at 480–510 TPH. Screen plugging reduced to once per 12hour shift. Pemulihan emas meningkat daripada 82% ke 93% (confirmed by monthly reconciliations). Tempoh bayaran balik: 7 bulan. |

    Contract Mining Operation – Central Asia (Ketinggian tinggi)

    | Cabaran | Penyelesaian | Keputusan |
    ||||
    | Site at 3,200 m altitude with short 5month operating season. Previous plant required 18 days for relocation between two pits 40 km apart, memakan 25% of the season. | Utilized the modular containerized design. Preassembled all piping and electrical connections at the workshop. Mobilized with 11 truckloads and a 25ton crane. | Relocation completed in 6 days including recommissioning. Operating season extended by 12 hari. Tambahan 6,000 tons processed per season, generating incremental revenue of $240,000. |

    River Terrace Deposit – South America

    | Cabaran | Penyelesaian | Keputusan |
    ||||
    | Feed material contained 15% +50 mm oversize with high abrasivity (85% kuarza). Standard screen media lasted only 300 jam. Water supply limited to 400 m³/hr from river. | Specified the AR400 wear package and polyurethane screen panels (expected life 2,000+ jam). Activated the closedloop water recirculation system with cyclone dewatering. | Screen media life extended to 1,800 jam. Water makeup demand reduced to 100 m³/jam. Ketersediaan tumbuhan tercapai 94% over a 6month operating campaign. Operating cost per ton reduced by 22% versus previous equipment. |

    Pertimbangan Komersial

    Peringkat Harga Peralatan

    | Konfigurasi | Penerangan | Indicative Price Range (FOB) |
    ||||
    | Pakej Asas | penyental, skrin, sluice recovery, penghantar, sistem kawalan | $1,850,000 – $2,200,000 |
    | Pakej Dipertingkatkan | Pangkalan + penumpu emparan (6 unit), cyclone dewatering, enhanced PLC | $2,400,000 – $2,800,000 |
    | Pakej Turnkey | Dipertingkatkan + feed hopper with hydraulic grizzly, all stackers, settling tanks, 500 kVA genset, 12month wear parts kit | $3,100,000 – $3,600,000 |

    Ciri Pilihan

  • Remote telemetry package: Satellitebased monitoring with monthly performance reports – $45,000
  • Additional sluice modules: Increase recovery area by 50% – $85,000 setiap modul
  • Heavyduty feed hopper: 40 m³ capacity with twin hydraulic rams – $120,000
  • Dieseldriven hydraulic power packs: For operations without grid power – $95,000
  • Coldclimate package: Enclosed operator cabin, heated lubrication systems, lowtemperature hydraulic oil – $65,000
  • Pakej Perkhidmatan

    | Pakej | Skop | Annual Cost |
    ||||
    | Penyelenggaraan pencegahan | 2 scheduled site visits/year, diagnostik jauh, wear parts inspection | $48,000 |
    | Penyelenggaraan Penuh | 4 lawatan tapak/tahun, all wear parts supplied, 48respons kecemasan jam | $185,000 |
    | Jaminan Prestasi | Plant availability ≥92%, throughput ≥480 TPH on specified feed, recovery ≥90% | $220,000 (includes penalties/credits) |

    Pilihan Pembiayaan

  • Pajakan Operasi: 36-tempoh 60 bulan, monthly payments from $52,000 (based on $2.4M equipment value)
  • Pinjaman Peralatan: 20–30% down payment, 5penggal tahun, fixed or floating rates
  • ProductionLinked Payment: Monthly payment calculated as percentage of gold recovered (minimum guaranteed payment applies)
  • SaleandLeaseback: For operations with existing equipment looking to upgrade
  • Soalan Lazim

    1. What is the minimum feed grade required for economic operation of this 500 loji TPH?

    Based on current operating cost benchmarks ($3.50–$4.50 per ton processed including depreciation, bahan api, buruh, dan memakai bahagian), a feed grade of 0.15–0.20 g/m³ is the practical economic threshold at current gold prices. Pada 0.15 g/m³, daily production is approximately 60–75 grams (2–2.4 oz) per 12hour shift. Operations with feed grades below 0.10 g/m³ should consider highercapacity equipment to achieve economies of scale.Borong 500 Tph Gold Mining Washing Plant Manufacturing

    2. How does the plant perform on feed with high clay content (di atas 35%)?

    The rotary scrubber is designed for clay content up to 35% at full rated throughput. Above this level, we recommend reducing feed rate to 400–450 TPH and increasing drum speed to 14 Rpm. For deposits with clay content exceeding 45%, a preconditioning drum or highpressure water cannons at the feed hopper may be required. Field data from West African operations shows 92% availability maintained on 30–35% clay feed over 6month campaigns.

    3. What is the expected gold recovery rate, and how is it verified?

    Recovery efficiency depends on feed particle size distribution and gold liberation:

  • Sluiceonly configuration: 85–92% for gold coarser than 150 μm
  • Sluice + penumpu emparan: 92–96% for gold coarser than 75 μm
  • Emas halus (−75 µm): 40–55% in sluices, 70–80% with concentrators
  • Recovery is verified through monthly reconciliation comparing feed grade (from drilling and sampling) against gold production, with adjustments for incircuit inventory. We provide a sampling protocol and calculation methodology with the plant documentation.

    4. What are the site preparation requirements before plant delivery?

    The plant requires a level area of approximately 60 m × 40 m (including settling ponds). Civil works include:

  • Compacted hardstand (300 mm compacted fill or existing competent ground)
  • Concrete pads for settling tanks and genset (pilihan, depending on soil conditions)
  • Water supply line (minimum 200 diameter mm) to the plant feed point
  • Tailings containment area with sufficient capacity for 4,000–5,000 m³/day of tailings
  • Site preparation typically takes 5–7 days with a dozer and compactor. The plant itself requires a 25ton crane for assembly.

    5. What is the lead time for manufacturing and delivery?

    Standard manufacturing lead time is 16–20 weeks from order confirmation, depending on current production schedule. Ini termasuk:

  • Engineering and documentation: 2 minggu
  • Fabrication and assembly: 10–12 minggu
  • Ujian penerimaan kilang (LEMAK): 1 minggu
  • Disassembly and containerization: 1–2 weeks
  • Penghantaran (Pelabuhan FOB): 1–2 weeks to major ports
  • Penghantaran dipercepatkan (12–14 minggu) is possible with a 10% surcaj, subject to production slot availability.

    6. How does the plant handle oversize material (+50 mm)?

    Oversize material is rejected by the top screen deck and discharged via a radial stacker to a separate stockpile. This material typically represents 10–20% of feed volume and is either rehandled for further processing (if it contains goldbearing material) or used for road construction and backfill. For deposits where oversize carries significant gold values, an optional secondary scrubber and screen module can be added to process this fraction.

    7. What training and ongoing support do you provide for operator teams?

    The standard package includes:

  • 2week onsite commissioning with 2 senior technicians
  • Operator training: 5 days covering plant operation, prosedur keselamatan, dan penyelenggaraan rutin
  • Maintenance training: 3 days covering wear parts

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda