Katalog Loji Pemasangan Mesin Penghancur Batu Sepuluh Teratas

Penerangan ringkas:

Kandungan Sasaran untuk Pembeli Komersial: Stone Crusher Machine Assembly Plant Solutions 1. PAINPOINT DRIVEN OPENING Managing primary rock reduction is a capitalintensive and operationally critical process. Inefficiencies here cascade downstream, impacting your entire production line’s profitability. Adakah anda menghadapi cabaran berterusan ini? High Downtime from Component Failure: Unplanned stoppages due to premature wear on liners,…


Perincian produk

Tag produk

Kandungan Sasaran untuk Pembeli Komersial: Stone Crusher Machine Assembly Plant Solutions

1. PEMBUKAAN PAINPOINT DRIVEN

Managing primary rock reduction is a capitalintensive and operationally critical process. Inefficiencies here cascade downstream, impacting your entire production line’s profitability. Adakah anda menghadapi cabaran berterusan ini?Katalog Loji Pemasangan Mesin Penghancur Batu Sepuluh Teratas

High Downtime from Component Failure: Unplanned stoppages due to premature wear on liners, galas, or shafts can cost over $15,000 per day in lost production and emergency repair labor.
Output Tidak Konsisten & Penggredan Produk: Turun naik dalam saiz suapan atau kekerasan membawa kepada agregat offspec, causing reject material and forcing secondary processing loops that increase energy and wear costs by an estimated 1825%.
Penggunaan Tenaga Berlebihan: Older or poorly optimized crushing chambers and drive systems can make comminution your single largest power consumer, with inefficient plants spending 3040% more on energy per ton of output.
Kerumitan Penyelenggaraan Tinggi & Safety Risk: Panjang, manual adjustment procedures for setting changes and liner replacements expose your maintenance crew to hazardous environments and extend downtime windows.

Persoalan utama untuk pengurus loji ialah: bagaimana anda boleh mencapai daya pengeluaran yang boleh diramal, tighter control over product specs, and lower costperton in your primary crushing stage?

2. GAMBARAN KESELURUHAN PRODUK: MODERN STONE CRUSHER MACHINE ASSEMBLY PLANT

This product category encompasses complete, preengineered assembly systems for primary jaw crushers—the workhorse of hard rock reduction. These are not just the crusher itself, but a coordinated plant module designed for rapid integration.

Aliran Kerja Operasi: 1) Scalped feed material is directed onto a rugged vibratory grizzly feeder. 2) Oversize material is conveyed into the crusher’s engineered chamber. 3) The compressive crushing action reduces rock via a fixed and moving jaw plate. 4) Crushed product exits through the adjustable closedside setting (CSS), determining maximum product size. 5) Output is conveyed to the next stage of your process.
Skop Permohonan: Ideal for highcapacity primary crushing of granite, basalt, batu perangkap, dan agregat kasar yang lain. Suited for stationary quarry installations or largescale portable plant setups.
Batasan: Not designed for recycling or asphalt demolition where tramp metal is prevalent without specific feeder protections. Requires prepared feed from drilling and blasting; not a substitute for mining excavation.

3. CIRI TERAS

Ruang Penghancuran Dalam & Sudut nip agresif | Asas Teknikal: Kinematik dan geometri ruang yang dioptimumkan | Faedah Operasi: Enables higher throughput rates by pulling material into the crushing zone more effectively, reducing bridging and improving capacity by design | Kesan ROI: Increases potential revenue output per operating hour without increasing crusher footprint.

Rangka Asas Fabrikasi Tugas Berat | Asas Teknikal: Stressrelieved steel construction with integral motor mounts | Faedah Operasi: Provides exceptional rigidity under dynamic loads, minimizing vibration transfer to supporting structures and ensuring precise alignment of drive components | Kesan ROI: Extends bearing and belt life by up to 35%, mengurangkan kos penggantian bahagian dan masa henti yang berkaitan.

Togol Hidraulik & Sistem Pelarasan | Asas Teknikal: Silinder hidraulik yang boleh diganti untuk penegangan dan pembersihan | Faedah Operasi: Allows remote adjustment of the CSS for quick product size changes and provides automated clearing of stalled material in the chamber | Kesan ROI: Reduces changeover time from hours to minutes and eliminates the need for manual intervention in blockages, meningkatkan keselamatan pengendali.

Pelapik Pakai BoltOn & Rahang Modular Mati | Asas Teknikal: Highstrength manganese steel with multiple mounting points | Faedah Operasi: Simplifies liner replacement procedures; jaw dies can be rotated or replaced sectionally to maximize wear material utilization | Kesan ROI: Lowers liner costperton by up to 20% through extended service life and reduces inventory holding costs via modular components.

Sistem Gris Automatik Berpusat | Asas Teknikal: Programmable lubrication unit with distribution blocks to key bearings | Faedah Operasi: Memastikan konsisten, correct lubrication intervals without operator dependency, even under highdust conditions | Kesan ROI: Menghalang kegagalan galas bencana; data lapangan menunjukkan a 60% reduction in bearingrelated unscheduled downtime.

Motor Bersepadu & Pengawal Memandu | Asas Teknikal: Enclosed vbelt drives with access doors | Faedah Operasi: Contains drive energy safely while allowing for routine inspection and maintenance without full guard removal | Kesan ROI: Meets stringent site safety protocols, reducing incident risk and associated liability.

4. KELEBIHAN KOMPETITIF

| Metrik Prestasi | Piawaian Industri (Penghancur Rahang Berdaya saing) | Our Stone Crusher Machine Assembly Plant Solution | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Tons per Hour @ 6" CSS (Granit Keras)| 450 500 tph| 525 575 tph| +10% ke +15% Kapasiti |
| Kehidupan Pelapik (Abrasive Basalt)| ~550,000 tons| ~700,000 tons| +27% Pakai Kehidupan |
| Average Energy Consumption| ~1.8 kWh/ton| ~1.55 kWh/ton| 14% Power Draw |
| Masa Pelarasan CSS| Manual shims (~46 jam)| Sistem hidraulik (~1520 minutes)| 90% Downtime |
| Selang Servis Bearing| Manual greasing (8hour shifts)| Automated system (Continuous/Programmed)| Ensures Compliance |

5. SPESIFIKASI TEKNIKAL

Penamaan model: JC5460 Primary Assembly Plant
Jenis penghancur: Overhead Eccentric Single Toggle Jaw Crusher
Pembukaan suapan: 54" x 60" (1372mm x 1524mm)
Saiz suapan maksimum: 48" (1220mm) ketulan
Keperluan Kuasa Pandu: 300 Hp (224 kw), electric motor standard
Approximate Capacity Range: 475 – 1,200 tph (bergantung pada CSS & bahan)
Tetapan sampingan tertutup (CSS) Julat: Hydraulically adjustable from 6" – 14" (150mm – 355mm)
Spesifikasi Bahan Utama: Rangka Dasar & Pengawal: ASTM A36 Keluli; Rahang Mati: Keluli Mangan Premium (14%18%); Aci: Forged Alloy Steel ESI4340.
Dimensi Modul Keseluruhan (LxWxH): Lebih kurang. 45' x 12' x 15' (13.7m x 3.7m x 4.6m)
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +50°C (4°F hingga +122°F). Dust seals rated for high particulate environments.

6. SENARIO APLIKASI

Pengembangan Kuari Granit Berskala Besar

Cabaran:
A major aggregate producer needed to increase primary circuit throughput by over 30% but was constrained by existing foundation space and high maintenance demands on older equipment.
Penyelesaian:
Implementation of two JC5460 Stone Crusher Machine Assembly Plants as parallel primary lines with integrated apron feeders.
Keputusan:
Achieved a combined steadystate throughput of over 1 ,100 tph each line within the existing footprint. The hydraulic adjustment system allowed rapid switching between railroad ballast and coarse aggregate settings, meningkatkan fleksibiliti tumbuhan.

Operasi Penghancuran Kontrak Mudah Alih

Cabaran:
A contracting company faced excessive mobilization time 2 days per setup 3 days per teardown 3 days per teardown due to complex component assembly onsite.
Penyelesaian:
Deployment of a skidmounted JC5460 assembly plant with preinstalled feeders,motor,dan laluan pejalan kaki.
Keputusan:
Reduced site installation time by approximately 65%. The unit’s integrated lube system proved critical in maintaining reliability across multiple shortduration projects,demonstrating less than 1 % unplanned downtime across three seasons

7 . PERTIMBANGAN KOMERSIL

Our Stone Crusher Machine Assembly Plants are offered in clear pricing tiers based on configuration:

• Tier I Base Plant Includes crusher fabricated base frame vbelt drive guards basic walkways motor mount • Tier II Production Ready Adds vibratory grizzly feeder hydraulic toggle system automated greasing discharge conveyor • Tier III Turnkey Premium Includes all Tier II items plus integrated dust suppression spray system advanced condition monitoring sensors extended starter package

Optional features include different jaw die profiles scalloped vs straight special alloy liners for specific abrasion characteristics custom discharge heights

We offer three service packages:

• Bronze Annual inspection parts discount • Silver Includes Bronze plus prioritized technical support scheduled lubrication system service • Gold Comprehensive coverage including wear component monitoring predictive maintenance planning annual mechanical health audit

Financing options are available including capital lease operating lease or loan structures through our partners typically ranging from 36 84 terma bulan

8 . Soalan LazimKatalog Loji Pemasangan Mesin Penghancur Batu Sepuluh Teratas

Q How compatible is this assembly plant with my existing secondary cone crushers?
A The JC5460 is engineered to produce a well graded feed curve optimal for secondary cone crushers Its hydraulic CSS adjustment allows you fine tune the feed size distribution to match your specific downstream cavity profile improving overall circuit balance

Q What impact will this have on my operational staffing requirements?
A The automation features notably the hydraulic adjustment reduce the need for manual labor during setting changes This allows one operator manage both feeding monitoring functions from control room potentially reallocating personnel other areas

Q Can we source wear parts locally?
A While we recommend genuine parts performance warranty our designs use standardized bearing sizes common alloy specifications facilitating local sourcing non critical components like seals filters However core wear items jaw dies require precise metallurgy ensure stated service life

Q What typical payment terms delivery schedule apply?
A For confirmed orders standard terms are 30 % deposit atas pesanan 70 % balance prior shipment Lead times range from 16 24 weeks depending model tier current production cycle We provide detailed milestone updates throughout manufacturing process

Q Does price include installation commissioning?
A Tier I III pricing covers FOB factory shipment Supervision commissioning available as separate scope work conducted our field service engineers ensure optimal startup performance training your crew

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda