Spesifikasi Kilang Bola Mampan

Penerangan ringkas:

1. PEMBUKAAN PAINPOINT DRIVEN Adakah anda menguruskan ketidakcekapan litar pengisaran yang secara langsung menghakis margin keuntungan anda? Common operational challenges with traditional ball mills include excessive energy consumption per ton of processed material, masa henti yang tidak dirancang kerana kegagalan mekanikal, and inconsistent product fineness leading to downstream recovery losses. These issues translate into quantifiable costs: energy can…


Perincian produk

Tag produk

1. PEMBUKAAN PAINPOINT DRIVEN

Adakah anda menguruskan ketidakcekapan litar pengisaran yang secara langsung menghakis margin keuntungan anda? Common operational challenges with traditional ball mills include excessive energy consumption per ton of processed material, masa henti yang tidak dirancang kerana kegagalan mekanikal, and inconsistent product fineness leading to downstream recovery losses. These issues translate into quantifiable costs: energy can account for over 50% of your milling OPEX, while a single major bearing failure can halt production for days and incur sixfigure repair bills. Are you questioning how to improve grinding media consumption rates, reduce maintenance labor hours, and achieve a more predictable particle size distribution? The solution requires a fundamentally robust and intelligently engineered ball mill designed for sustainable operation.

2. GAMBARAN KESELURUHAN PRODUKSpesifikasi Kilang Bola Mampan

This sustainable ball mill is a heavyduty, horizontal cylindrical grinding device engineered for the continuous comminution of ores, mineral, dan bahan industri. Its operational workflow is based on a proven, optimized process: (1) Feed material is conveyed into the first compartment of the rotating mill. (2) The impact and attrition of grinding media (bola) within the cascading charge reduce particle size. (3) Ground material discharges through grate plates, often proceeding to classification in a closedcircuit system. Peralatan ini berskop untuk aplikasi pengisaran primer dan sekunder dalam perlombongan, Pengeluaran simen, dan pemprosesan mineral. Its limitations include being less effective for ultrafine grinding below 20 microns compared to specialized vertical mills or stirred media detritors.

3. CIRI TERAS

Geometri Pelapik Berpaten | Asas Teknikal: Profil pengangkat yang dioptimumkan & kelengkungan plat | Faedah Operasi: Directs charge motion for optimal impact energy transfer, reducing slippage and wasteful heat generation | Kesan ROI: Data lapangan menunjukkan a 715% pengurangan penggunaan tenaga tertentu (kWj/t) compared to standard wave liners.

Pelabuhan Pemantauan Keadaan Bersepadu | Asas Teknikal: Lekap sensor yang diprapasang untuk getaran, suhu, dan pelepasan akustik | Faedah Operasi: Enables realtime health monitoring of bearings and gear mesh, facilitating predictive maintenance | Kesan ROI: Meminimumkan kegagalan bencana; industry case studies correlate this with a 3050% reduction in unplanned milling downtime.

Sistem Pemacu Kecekapan Tinggi | Asas Teknikal: Dualpinion gearbox with loadsharing design & hightorque motor | Faedah Operasi: Provides smooth startup under full load conditions and consistent power delivery across operational cycles | Kesan ROI: Improves power factor and reduces peak demand charges; extends gear service life by 2030%.

Advanced Material Specification for Critical Components | Asas Teknikal: Forged trunnion shafts & alloy steel head ends | Faedah Operasi: Withstands cyclical loading stresses without deformation or fatigue cracking | Kesan ROI: Eliminates premature head end replacement, a major capital expense event, over the life of the plant.

Optimized Grinding Media Management System | Asas Teknikal: Automated ball addition port & wear rate modeling software support | Faedah Operasi: Maintains optimal charge volume and size distribution without manual intervention during operation | Kesan ROI: Stabilizes throughput and grind size; typical operations report a 510% decrease in media consumption rates.

4. KELEBIHAN KOMPETITIF

| Metrik Prestasi | Kilang Bola Standard Industri | Sustainable Ball Mill Solution | Kelebihan (% penambahbaikan) |
| : | : | : | : |
| Penggunaan Tenaga Khusus (kWj/t) | Garis dasar (100%) | Reduced via liner & drive optimization| 715% lebih rendah |
| Ketersediaan Tahunan (excluding planned stops) | 9294%| Increased via predictive monitoring features| +46 mata peratusan |
| Kehidupan Pelapik (waktu operasi) Berbeza mengikut aplikasi.| Garis dasar (100%)| Extended via superior material & reka bentuk| 1525% longer |
| Penggunaan Media (g/t)| Garis dasar (100%)| Reduced via controlled charge management| 510% lebih rendah |

5. SPESIFIKASI TEKNIKAL

Kapasiti/Penilaian: Available in models from 500 kW kepada 10+ Kuasa pemacu MW. Julat throughput daripada 10 TPH berakhir 500 TPH depending on feed size, kekerasan, and target grind.
Keperluan kuasa: Direka untuk bekalan voltan tinggi (3.3 kV 11 kV). Pakej pemacu lengkap termasuk motor, kotak gear, transformer/VSD compatibility.
Spesifikasi Bahan: Cangkang yang dibina daripada plat keluli lembut yang digulung; Trunnions adalah keluli palsu; Pelapik tersedia dalam keluli highchrome, Besi Nihard, or rubber depending on abrasion/corrosion application.
Dimensi Fizikal: Diameters from 2m to over 6m; Lengths from 3m to over 15m. Designs account for foundation loading and spatial constraints.
Julat Operasi Persekitaran: Kejuruteraan untuk suhu ambien dari 20°C hingga +50°C. Sealing systems protect against dust ingress and lubricant contamination.

6. SENARIO APLIKASI

[Copper Concentrator – Throughput Expansion] | Cabaran: An existing plant needed higher throughput but was limited by SAG mill capacity; the secondary ball mill circuit was a bottleneck.| Penyelesaian: Installation of one largediameter sustainable ball mill with highefficiency drives replaced two older units.| Keputusan: Kapasiti litar meningkat sebanyak 22%, specific energy fell by 9%, and the footprint was reduced by 35%, enabling the expansion within the existing building.

[Gold Processing – Operating Cost Reduction]| Cabaran: High grinding media wear rates and frequent liner changes in an abrasive ore body were driving unsustainable operating costs.| Penyelesaian: Implementation of sustainable ball mills with advanced liner geometry and tailored highchrome alloy liners.| Keputusan: Hayat pelapik dilanjutkan daripada 6 ke 8 bulan, media consumption dropped by 12%, yielding an annual OPEX saving confirmed at over $250k per mill.Spesifikasi Kilang Bola Mampan

7. PERTIMBANGAN KOMERSIL

Equipment pricing is tiered based on drive power rating and material specification levels (Kewajipan Standard / Tugas Berat / UltraAbrasive Duty). Key optional features include advanced instrumentation packages (millSCADA), specialized lubrication systems, and custom discharge configurations.
Pakej perkhidmatan yang komprehensif disediakan:
1. Sokongan Penyelenggaraan Terancang: Termasuk pemeriksaan berjadual, liner changeout kits.
2. Pakej Jaminan Prestasi: Includes process optimization services with guaranteed consumption metrics.
3. Kontrak Perkhidmatan Penuh: Covers all parts and labor for mechanical systems.
Financing options include capital purchase with milestone payments or longterm leasetoown agreements structured to align with project cash flow.

8. Soalan Lazim

1. Is this sustainable ball mill compatible with our existing classification cyclone cluster?
Yes.The discharge arrangement can be engineered to interface with standard cyclone feed headers.Pressure dropand pump box requirements are calculated during the basic engineering phase.

2.What is the expected impact on our plant’s overall power demand?
Whilethe unit itselfis designedfor maximum efficiency,the total connected load will increase if adding capacity.A detailed load analysis is part of our proposal,butthe highefficiency drive improves power factor which can mitigate demand charges.

3.Are there financing options that defer major capital outlay?
Yes.Several equipment financing structures are available including operating leases that treat payments as an operating expense or project financing tiedto production milestones.

4.How does your performance guarantee work?
We contractually guarantee key metrics like specific energy consumptionand throughput within defined bandsbased on your ore characteristics.Failureto meet these triggers predefined service credits or process optimization work at our cost.

5.Apakah masa utama penghantaran biasa?
For standard sizeslead times range from8to14monthsfrom order todelivery exworks,customized solutions may require longer.Detailed schedulingis provided upon project initiation.

6.Can your design accommodate future automation upgrades?
Absolutely.The condition monitoring portsand control system architectureare designedto integratewith Plantwide DCSor IoT platformsfor future automationand data analytics projects.

7.Do you provide installation supervisionand commissioning support?
Yes.We offer tiered site service packagesfrom advisory roles to full EPCMstyle managementof mechanical installation,tieins,and performance validation testing

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda