Stone Quarry Crushing Plant Assembly Plant Catalog
1. PEMBUKAAN PAINPOINT DRIVEN
Kos operasi yang meningkat dan masa henti yang tidak menentu menghakis keuntungan kuari anda? Managing a stone quarry crushing plant presents distinct, cabaran yang mahal. Inconsistent feed material leads to frequent crusher blockages and damaging surges, resulting in hours of unplanned maintenance. Energy consumption per ton of processed aggregate remains a primary, uncontrollable expense. The constant wear on crusher liners, skrin, and conveyors demands excessive parts inventory and labor for replacement. Tambahan pula, achieving precise, consistent product gradation for multiple specifications often requires manual adjustments and recrushing cycles, wasting capacity.
How can you stabilize your entire crushing circuit to maximize throughput? What solutions exist to directly reduce costperton by extending component life and optimizing energy use? Is there a systematic approach to minimize human intervention while improving final product yield? The answer lies not in a single machine, but in the intelligent engineering of a complete Stone Quarry Crushing Plant Assembly.
2. GAMBARAN KESELURUHAN PRODUK
A Stone Quarry Crushing Plant Assembly is a coordinated stationary or semimobile system engineered to reduce blasted rock (runofquarry) ke dalam saiz agregat yang ditentukan (mis., kursus asas, cip, habuk). Ia mengintegrasikan penghancuran utama, menghancurkan sekunder/tertiari, pemeriksaan, menyampaikan, and material handling subsystems into a single operational workflow.
Aliran Kerja Operasi:
1. Pengurangan utama: Dump trucks feed runofquarry rock into a primary jaw crusher or gyratory crusher for initial size reduction.
2. Menyusun & Recirculation: Crushed material is conveyed to primary screening units; oversize material is directed to secondary cone or impact crushers.
3. Penghancuran Menengah/Tertiari: Subsequent crushers further refine the material to the required size specifications.
4. Saringan Akhir & Stok: Correctly sized aggregates are sorted by vibrating screens and conveyed to designated stockpiles for loadout.
Skop Permohonan: Ideal untuk pengeluaran volum tinggi agregat pembinaan (batu kapur, granit, batu perangkap) from dedicated quarry sites.
Batasan: Not designed for highly abrasive or extremely hard materials (mis., taconite) without specialized liner configurations; site requires substantial space and stable foundation; significant capital investment necessitates high utilization for optimal return.
3. CIRI TERAS
Sistem Kawalan Lanjutan | Asas Teknikal: Automasi berasaskan PLC dengan algoritma pengurusan beban | Faedah Operasi: Monitors motor amps and crusher pressure to regulate feeder speed automatically | Kesan ROI: Prevents crusher overloads and chokefeeding, reducing wear part stress by up to 22% and optimizing power draw.

Reka Bentuk Skid Modular | Asas Teknikal: Rangka keluli struktur yang telah dipasang sebelumnya dengan laluan pejalan kaki bersepadu | Faedah Operasi: Reduces onsite civil works and assembly time by approximately 40% | Kesan ROI: Lowers installation costs and accelerates timetorevenue following purchase.
Centralized Greasing & Sistem Pelincir | Asas Teknikal: Automated manifold distributing grease to all critical bearing points | Faedah Operasi: Ensures consistent lubrication intervals without operator intervention | Kesan ROI: Memanjangkan hayat perkhidmatan galas dengan purata 35%, mengurangkan kos alat ganti dan masa henti yang berkaitan.
HighStrength Conveyor Trussing | Asas Teknikal: Reka bentuk kekuda yang dioptimumkan CAD menggunakan keluli tegangan tinggi | Faedah Operasi: Supports maximum load with minimal deflection over long spans | Kesan ROI: Reduces structural fatigue failures by over 60%, lowering longterm maintenance expenditures.
Titik Integrasi Penindasan Habuk | Asas Teknikal: Preinstalled piping manifolds at transfer points with solenoid valves | Faedah Operasi: Allows for easy connection to water supply for targeted dust control | Kesan ROI: Mitigates fugitive dust emissions for regulatory compliance without costly retrofits.
Crusher Access Platforms | Asas Teknikal: 360degree grated platforms with safety handrails integrated into structure | Faedah Operasi: Menyediakan selamat, easy access for liner inspections and routine maintenance tasks | Kesan ROI: Improves worker safety compliance efficiency during scheduled maintenance windows.
Penyumpan Grizzly Bergetar Tugas Berat (Pilihan) | Asas Teknikal: Robust deck with replaceable grizzly bars mounted on highGforce exciters| Faedah Operasi: Removes fines ahead of the primary crusher while absorbing dump truck impact loads| ROI Impact Increases primary crusher throughput efficiency by up to 18% on sticky or claybound materials.
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Piawaian Industri | Our Stone Quarry Crushing Plant Assembly | Kelebihan (% Penambahbaikan) |
|||||
| Keseluruhan Ketersediaan Loji | 8588% | 9294% | +6% |
| Penggunaan Tenaga setiap Tan | Garis dasar | Optimized via system design & pengurusan beban |15% |
| Masa Tukar Pelapik (Utama) 812 jam 68 jam (with integrated platforms & perkakas) |33% |
| Pemasangan & Garis Masa Pentauliahan 1620 minggu 1014 minggu (reka bentuk gelincir modular) |30% |
| Kawalan Hasil Denda +/ 5% specification variance +/ 2% specification variance Accuracy improved by +60% |
5. SPESIFIKASI TEKNIKAL
Julat Kapasiti: Boleh dikonfigurasikan daripada 200 TPH kepada 1,200+ Keluaran produk akhir TPH.
Keperluan Kuasa Utama: Bergantung pada konfigurasi; julat tipikal daripada 500 kVA kepada 2 MVA total connected load.
Bahan Struktur: Primary frames fabricated from ASTM A36 steel; wear surfaces utilize AR400 abrasionresistant steel liners.
Typical Physical Footprint (untuk a 500 loji TPH): Approximately 80m (L) x 35m (W), excluding stockpile areas.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +45°C; electrical components rated for IP65 protection against dust and moisture ingress.
Saiz Bahan Suapan: Accepts runofquarry rock up to \(48"\) (\(1200mm\)) in diameter based on primary crusher selection.
Saiz Produk Akhir: Capable of producing from \(1 \frac{1}{2}"\) (\(40mm\)) down to 200 mesh (\(75\mu m\)) pasir yang dihasilkan.
6. SENARIO APLIKASI
Projek Pembesaran Kuari Granit
Cabaran: A southeastern US granite quarry needed to increase production by 50% but had limited space for plant expansion within their existing property boundary.
Penyelesaian: Implementation of a compact threestage crushing plant assembly featuring a large jaw crusher as the primary unit followed by two cone crushers in closed circuit with multideck screens—all arranged in a vertical layout on modular skids.
Keputusan: Capaian sasaran sasaran sebanyak \(650\) TPH within the existing footprint; modular installation reduced commissioning time by \(5\) weeks versus traditional build; plant availability consistently measured at \(93\%\) sepanjang tahun pertama.
Pengeluar Agregat Batu Kapur
Cabaran: High silica content in limestone was causing excessive wear on conveyor belts and chute linings at transfer points at an operation in Texas.
Penyelesaian: A tailored crushing plant assembly was specified with ceramiclined chutes at all critical transfer points alongside heavyduty belt scrapers. The system included an automated central lubrication system specifically designed for highdust environments.
Keputusan: Transfer point liner replacement frequency decreased from quarterly to annually; conveyor belt life extended by an estimated \(40\%\); reduced manual greasing labor resulted in an estimated annual savings of \(\$28,\!000\).
7. PERTIMBANGAN KOMERSIL
Our stone quarry crushing plants are offered in three primary tiers:
1. Tahap Konfigurasi Standard: Includes core equipment (primary/secondary crushers/screens/conveyors), kawalan PLC asas, structural steel support frames—ideal for standard materials like limestone/marble—starting range \(\$2.\!5M \$5M\) bergantung kepada kapasiti.
2.
3.Peringkat Prestasi Dipertingkat: Adds features like automated load management systems centralized lube systems heavyduty feeders premium abrasionresistant liners—recommended for abrasive/hard rock applications like granite/trap rock—starting range \(\$4M \$8M\) depending on capacity/features selected
Ciri pilihan termasuk:
Dust suppression/filtration systems
Pakej penjanaan kuasa atas kapal
Advanced process monitoring software
Rock breaker booms
Service packages are available separately including:
Extended warranty coverage
Annual inspection/maintenance contracts
Remote monitoring/diagnostics services
Financing options include:
Traditional equipment leasing through thirdparty partners
Longterm rentaltoown agreements
Projectspecific financing structures
Soalan Lazim
Q1 How do I determine if my site needs a stationary or semimobile plant assembly?
A Stationary plants are optimal when reserves support longterm operation (\(>10 years\)) at one location Semimobile assemblies mounted on wheeled trailers offer flexibility when multiple faces within one large site need servicing Our engineers can conduct site analysis based on your mine plan
S2 Apakah masa utama biasa dari penempatan pesanan sehingga pentauliahan?
A For standard configurations lead times typically range between \(26\)\(36\) weeks This includes engineering fabrication factory testing disassembly shipping reassembly onsite commissioning Custom configurations may require additional time
Q3 Can this plant assembly integrate with my existing older equipment?
A Yes integration is often possible Our control systems can be designed as master controllers incorporating legacy equipment We will conduct thorough assessment of your current machinery’s compatibility including capacity matching electrical requirements physical interfaces before proposing solution
Q4 What kind of operator training is provided?
A We provide comprehensive onsite training covering normal operation startup/shutdown procedures routine maintenance troubleshooting basic control system adjustments Training manuals digital reference guides included Documentation provided covers all major subsystems
S5 Adakah alat ganti tersedia secara global?
A We maintain regional parts distribution centers stocked with common wear parts consumables Critical components are stocked centrally ensuring availability Lead times nonstock items clearly communicated upon order All parts drawings schematics digitized easy reference


