Stone Crusher Plant Suppliers Competitive Price
1. PEMBUKAAN PAINPOINT DRIVEN
Kos operasi yang meningkat dan masa henti yang tidak menentu menghakis margin pengeluaran agregat anda? Untuk pengurus loji dan kontraktor kejuruteraan, cabaran teras dalam penghancuran primer selalunya tertumpu pada tiga bidang kritikal:
Masa Henti Tidak Berjadual: Kegagalan galas, unexpected wear part changes, and mechanical breakdowns halt your entire downstream process. Every hour of lost production can represent thousands in lost revenue and idle labor costs.
Inconsistent Throughput & Bentuk produk: Kekerasan dan saiz bahan suapan yang berubah-ubah boleh menyebabkan penyusuan tercekik atau peronggaan, leading to suboptimal tonnage and poor particle shape that affects secondary crushing efficiency and final product value.
SkyHigh Maintenance Complexity & Kos: Traditional designs require extensive manual adjustment, frequent lubrication interventions, and lengthy procedures for wear part replacement, demanding significant skilled labor hours.
How do you select a primary stone crusher plant that delivers not just raw power, but predictable performance, simplified maintenance, and a demonstrable return on investment? The solution requires a focus on engineered reliability and operational intelligence.
2. GAMBARAN KESELURUHAN PRODUK: PRIMARY JAW CRUSHER STATION
This product description details our heavyduty mobile primary jaw crusher plant, engineered for the first stage of rock reduction in quarrying, perlombongan, dan aplikasi kitar semula perobohan. The plant is designed as a selfcontained crushing station for processing hard abrasive materials like granite, basalt, dan konkrit kitar semula.
Aliran Kerja Operasi:
1. Suapan: Dump trucks or wheel loaders deposit runofquarry material (sehingga saiz suapan yang ditentukan) into the vibrating grizzly feeder (VGFF VGF).
2. PraSkrin & Menghancurkan: The VGF removes fines from the feed stream via a bypass chute while directing oversize material evenly into the robust jaw crusher cavity.
3. Pengurangan utama: The jaw crusher utilizes compressive force to break large rocks into smaller fragments (typically 150mm 200mm).
4. Pelepasan: Crushed material is discharged onto the main product conveyor for transport to the next stage or a stockpile.
Skop Permohonan & Batasan:
Skop: Ideal untuk penghancuran utama batu keras (Kekuatan Mampatan > 250 MPa), batu kuari yang diletupkan, construction demolition waste, dan kerikil sungai.
Batasan: Tidak sesuai untuk melekit, bahan kaya tanah liat tanpa prapemprosesan. Maximum feed size is fixed by crusher inlet dimensions; oversize rock requires preblasting or breaking.
3. CIRI TERAS
Reka Bentuk Rahang Ruang Dalam | Asas Teknikal: Optimized nip angle and longer crushing zone | Faedah Operasi: Meningkatkan kapasiti sehingga 10% versus standard chambers and produces a more consistent product gradation with less slabby output. | Kesan ROI: Higher throughput per fuel/power unit consumed improves costperton metrics.
Togol Hidraulik & Sistem Pelarasan | Asas Teknikal: Menggantikan plat togol mekanikal tradisional dengan silinder hidraulik dwilaktasi. | Faedah Operasi: Enables remote clearing of chamber blockages in minutes instead of hours and allows quick CSS adjustment under load for product size changes. | Kesan ROI: Reduces downtime from tramp metal events by over 80% and minimizes noncrushing time during product changeovers.
Integrated HeavyDuty Grizzly Feeder | Asas Teknikal: Stepped grizzly bars with high stroke amplitude. | Faedah Operasi: Effectively scalps fines to reduce crusher cavity packing while handling severe impact from direct truck dumping. | Kesan ROI: Improves overall plant efficiency by up to 15% by optimizing crusher load and protecting belts from fines spillage.
PLCBased Plant Control System | Asas Teknikal: Centralized control panel with CANBUS communication monitoring key parameters (Cabutan kuasa, tekanan, suhu). | Faedah Operasi: Provides operators with realtime diagnostics, historical trend data for predictive maintenance, and automated startup/shutdown sequences. | Kesan ROI: Lowers risk of catastrophic failure through early warning alerts and standardizes operation to reduce human error.
Unified Greasing System & Platform Perkhidmatan | Asas Teknikal: Centralized lube points routed to groundlevel access with automated timerbased greasing options. | Faedah Operasi: Cuts routine service time by half by eliminating the need to access multiple highpoint bearings individually during daily checks. | Kesan ROI: Reduces scheduled maintenance labor costs and enhances technician safety.
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Piawaian Industri | Penyelesaian Penghancur Rahang Utama Kami | Kelebihan (% penambahbaikan) |
| : | : | : | : |
| Pakai Part Life (Mn18/22 Jaws) | ~120,000 MTon (Granit Lelas) | ~150,000 MTon (Granit Lelas) | +25% Dipanjangkan Umur |
| Chamber Clearance Time (Blockage)| Manual / mekanikal; 24 hours average| Togol Hidraulik; <15 minutes typical| 90% Downtime Reduction |
| Average Power Consumption per Tonne| Rujukan Garis Dasar| Hingga 8% lower due to optimized kinematics & reka bentuk ruang| 8% Kecekapan tenaga|
| Daily WalkAround Inspection Time| ~45 minutes (multiple access points)| ~25 minutes (centralized systems & platform)| 44% Labor Time |
5. SPESIFIKASI TEKNIKAL
Model Penghancur: JC145 HeavyDuty Jaw Crusher
Pembukaan suapan: 1400mm x 1100mm
Saiz suapan maksimum: 1000mm panjang tepi
Tetapan sampingan tertutup (CSS) Julat: 150mm 250mm (boleh laras secara hidraulik)
Julat Kapasiti: Hingga 750 MTPH, bergantung kepada bahan suapan dan CSS.
Power Plant Options: Tahap 4 Final / Stage V dieselelectric hybrid or direct electric drive (400V/50Hz atau boleh disesuaikan).
Jumlah Kuasa yang Dipasang: ~440 kW
Penghantar Utama: Lebar tali pinggang 1400mm; discharge height adjustable up to 5m.
Pembinaan Rangka: Hightensile steel plate with reinforced stress zones; abrasionresistant liners at impact points.
Julat Suhu Operasi: 25°C to +45°C with standard fluid packages.
Capacity based on crushed granite with bulk density 1.6 t/m³.
6. SENARIO APLIKASI
Kuari Batu Keras – Pengeluaran Agregat Granit
Cabaran: A granite quarry faced excessive downtime from uncrushable material causing shearpin failures on their old jaw crusher. Replacement procedures took a full shift each occurrence.
Penyelesaian: Implementation of our mobile primary jaw crusher plant featuring the hydraulic toggle system for automatic uncrushable material release.
Keputusan: Elimination of shearpin related stoppages. Chamber clearing events now resolved in under 20 minutes versus 8+ hours previously, increasing annual available production time by an estimated ~300 hours.
Large Infrastructure Project – OnSite Basalt Processing
Cabaran: A major highway project required consistent highvolume production of base materials across multiple work fronts within a tight schedule.
Penyelesaian: Deployment of two identical primary jaw crusher plants with PLC control systems for consistent operation by different crews.
Keputusan: Mencapai daya pengeluaran yang berterusan sebanyak >700 MTPH per plant with matched product gradation from both sites due to precise hydraulic CSS control. Project completed aggregate production phase two weeks ahead of schedule.
7. PERTIMBANGAN KOMERSIL
Our primary jaw crusher plants are offered in clear pricing tiers based on configuration:
1. Peringkat Tumbuhan Asas: Includes core jaw crusher station with basic grizzly feeder, main conveyor, dieselelectric power pack, dan platform laluan pejalan kaki.
2. Peringkat Prestasi (Paling Biasa): Adds hydraulic CSS adjustment & blockage clearing system, integrated metal detector on feeder belt PLC control system with advanced diagnostics.
3. Peringkat Premium: Includes all Performance features plus extended service packages remote telematics gateway automated central greasing system upgraded heavyduty wear liners throughout
Optional features include dust suppression systems magnetic cross belt separator various side conveyor configurations
We offer comprehensive service packages ranging from annual inspection plans to fullsite operationandmaintenance contracts Financing options including equipment leasing rentaltoown agreements are available through our partners
Soalan Lazim
Q1 Is this stone crusher plant compatible with my existing secondary cone crushers screen decks?
Our plants are designed as modular units Standard discharge heights conveyor widths can be configured match most common downstream equipment layouts We provide detailed interface specifications facilitate integration
Q2 What is the expected impact on my operational labor requirements?
Field data shows these plants reduce daily inspection time simplify routine tasks However we recommend initial training focused on utilizing PLC data predictive maintenance rather than reactive repairs potentially reallocating labor resources
Q3 How does pricing compare traditional stationary primary crushing setup?
Initial capital outlay may be comparable highly engineered stationary foundations conveyors However total installed cost often lower due reduced civil works mobility offers significant value projects requiring relocation
Q4 What are standard commercial terms delivery lead times?
Standard terms involve progress payment against manufacturing milestones Lead times typically range from weeks depending model complexity current order backlog confirmed upon project specification
Q5 What level site preparation required before installation?
A stable compacted level working platform sufficient bearing capacity support total plant weight required Unlike stationary plants extensive concrete foundations not necessary reducing site preparation time cost
Q6 Can you provide performance guarantees?
Yes we offer guaranteed capacity wear part life metrics based specific agreedupon feed material laboratory analysis These form part commercial agreement ensure performance meets your production targets


