Contoh Syarikat Perdagangan Perlombongan Emas Kilang Setem

Penerangan ringkas:

1. PAINPOINT DRIVEN OPENING Are you managing a gold processing operation where throughput and recovery rates are under constant pressure? The limitations of traditional crushing and grinding methods directly impact your bottom line. Pertimbangkan cabaran operasi biasa ini: Throughput Rendah & Masa Henti yang Tinggi: Pemakanan manual, inconsistent ore sizing, and frequent maintenance stops on primary crushers…


Perincian produk

Tag produk

1. PEMBUKAAN PAINPOINT DRIVEN

Are you managing a gold processing operation where throughput and recovery rates are under constant pressure? The limitations of traditional crushing and grinding methods directly impact your bottom line. Pertimbangkan cabaran operasi biasa ini:

Throughput Rendah & Masa Henti yang Tinggi: Pemakanan manual, inconsistent ore sizing, and frequent maintenance stops on primary crushers create bottlenecks, limiting tonsperhour capacity and increasing labor costs.
Pembebasan Emas yang tidak cekap: Inadequate initial particle size reduction forces your grinding circuit to work harder, consuming excessive energy and still risking poor liberation of gold from host rock.
Kos Operasi yang Tinggi: Reliance on multiple pieces of equipment for primary crushing, secondary breaking, and feeding results in elevated power consumption, spare parts inventories, and operator overhead.
Had Kebolehskalaan: tetap, nonmodular systems hinder your ability to efficiently adjust processing capacity in response to changing ore grades or mine plans.

Is there a reliable, heavyduty solution that can serve as the robust first step in your comminution circuit, consistently delivering optimally sized feed to improve overall plant performance?

2. GAMBARAN KESELURUHAN PRODUK: HeavyDuty Stamp Mill for Primary Gold Ore Crushing

Our heavyduty stamp mill is engineered as the foundational primary crushing unit for hard rock gold mining operations. Ia direka bentuk untuk menerima runofmine (ROM) ore and reduce it to a consistent, manageable size suitable for secondary processing in ball mills or hammer mills.

Aliran Kerja Operasi:
1. Memuatkan: ROM ore is fed into the integrated feed hopper, designed to manage large, irregular rocks with minimal bridging.
2. Menghancurkan: Mechanically driven heavy stamps (camshaft or leveroperated) are lifted and dropped onto the ore bed contained within a durable mortar box.
3. Saiz & Pelepasan: Crushed material passes through a grated screen at the base of the mortar box. Oversize material remains for further crushing cycles, while correctly sized material discharges for conveyance to the next stage.
4. Integrasi Sistem: The unit functions as the primary node in a circuit, with discharge ideally conveyed to a sorting area or directly into secondary grinding.

Skop Permohonan & Batasan:
Sesuai Untuk: Processing quartz veins, hard rock lode deposits, and sulfide ores where gold is locked within the matrix. Suited for both stationary plant installations and largerscale artisanal operations.
Batasan: Tidak direka bentuk sebagai penyelesaian pengisaran halus. Efficiency decreases with overly clayrich or wet feed material without prior screening. Requires a stable foundation due to dynamic loads.

3. CIRI TERAS

Reka Bentuk Bingkai Modular | Asas Teknikal: Fabricated hightensile steel Ibeam construction with bolted sections | Faedah Operasi: Enables transport to remote sites and allows for future reconfiguration or expansion of the crushing battery | Kesan ROI: Mengurangkan masa pemasangan sehingga 40% versus weldedinplace units and protects longterm asset flexibility.

Kasut Setem Aloi yang Dikeraskan & Mortar Liners | Asas Teknikal: Airhardened manganese steel or proprietary chromium carbide alloys | Faedah Operasi: Provides exceptional wear resistance against abrasive quartz material, extending component life between replacements | Kesan ROI: Data lapangan menunjukkan a 6080% improvement in wear life over standard cast iron parts, directly lowering cost per ton for consumables.

PrecisionCut Camshaft & HeavyDuty Bearings | Asas Teknikal: Forged steel camshaft with inductionhardened lobes mounted on oversized roller bearings | Faedah Operasi: Ensures consistent stamp lift height and drop force with minimal vibration transfer to the frame | Kesan ROI: Maximizes energy transfer to the rock crush zone and reduces unscheduled bearing failure downtime by an average of 35%.

Sistem Parut Pelepasan Boleh Laras | Asas Teknikal: Interchangeable grate plates with varying aperture sizes (biasanya 1/2" ke 2") | Faedah Operasi: Allows operators to control final product size based on ore characteristics and downstream mill requirements | Kesan ROI: Optimizes overall circuit efficiency; achieving correct primary crush size can improve downstream grinding mill throughput by 1525%.

Contoh Syarikat Perdagangan Perlombongan Emas Kilang Setem

Sistem Pelinciran Grease Berpusat | Asas Teknikal: Manifold with lines feeding all major bearing points from a single station | Faedah Operasi: Membolehkan selamat, rapid routine maintenance without disassembly, ensuring critical points are never missed | Kesan ROI: Standardizes preventive maintenance (Pm) procedures, reduces lubrication time by 70%, and extends component service life.

Manifold Penindasan Habuk Bersepadu | Asas Teknikal: Preplumbed water line ports around the mortar box for nozzle attachment | Faedah Operasi: Significantly reduces silica dust generation at the point of impact, improving site air quality and operator safety | Kesan ROI: Mitigates health compliance risks and reduces cleanup labor costs associated with dust accumulation.

4. KELEBIHAN KOMPETITIF

| Metrik Prestasi | Piawaian Industri (Kilang Setem Asas) | Our HeavyDuty Stamp Mill Solution | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Ketersediaan Uptime| ~80%, frequent stops for lubrication/ adjustment| >92%, via centralized lube & robust bearing design| +15% masa operasi |
| Pakai Part Life (Kasut)| 500 800 waktu operasi| 1,200 1,500 waktu operasi| +60% minimum |
| Tan sejam (Tph)| Pembolehubah; often limited by feed design| Consistent throughput via optimized hopper geometry & cam profile| +2030% throughput stability |
| Kecekapan tenaga (kWj/tan)| Higher due to friction losses & getaran| Lower via direct drive alignment & efficient kinetic transfer| 18% average power consumption per ton crushed |
| Pemasangan / Masa Perpindahan| Weeks for foundation setting/assembly| Days due to modular bolttogether design| 65% site commissioning time |

5. SPESIFIKASI TEKNIKALContoh Syarikat Perdagangan Perlombongan Emas Kilang Setem

Kapasiti Julat Model: 110 Tan per jam (Tph), depending on ore hardness and target discharge size.
Keperluan kuasa: Configured for electric motor or diesel drive options.
Pemacu motor elektrik: 3075 Hp (2256 kw), 3fasa.
Diesel Drive Option: Direct coupling to industrial diesel engines.
Spesifikasi Bahan:
Pembinaan Rangka: Keluli Struktur ASTM A36.
Pakai Komponen (Shoes/Liners): Keluli mangan (1114% Mn) or Chromium Carbide Overlay Plate.
Camshaft & Pengangkat: AISI palsu 4140 Keluli, dipanaskan.
Dimensi Fizikal (tipikal 5 Unit TPH):
Jejak (L x W): Approximately 4m x 2.5m.
Ketinggian: ~3m including hopper.
Anggaran Berat: 8,500 kg.
Julat Operasi Persekitaran: Direka untuk operasi dalam suhu ambien dari 20°C hingga +50°C. All bearings feature sealed housings rated IP65 for dust and moisture protection.

6. SENARIO APLIKASI

MediumScale Lode Mine Expansion

Cabaran:
A West African gold operation expanding its plant capacity was constrained by its manual jaw crusher setup,
which caused erratic feed to the new ball mill circuit,
leading to constant operator intervention
and suboptimal grinding performance.

Penyelesaian:
Implementation of two parallel heavyduty stamp mills as dedicated primary crushers,
configured with a specific discharge grate size
to produce ideal ball mill feed.

Keputusan:
Primary crushing throughput stabilized at
5 TPH per unit,
providing consistent,
optimally sized feed
to the new grinding circuit,
which achieved its target recovery rate within two weeks of commissioning,
and overall plant throughput increased by
40%.

Cooperative Artisanal Mining Sector Upgrade

Cabaran:
A South American mining cooperative using individual,
smallscale hammer mills faced high equipment failure rates
and poor recovery due
to inefficient initial particle size reduction from large ROM ore.

Penyelesaian:
Centralized processing center installation featuring
a heavyduty stamp mill as
the shared primary crushing hub,
feeding multiple secondary grinding lines.

Keputusan:
Koperasi melaporkan a
60%
reduction in hammer mill wear part costs due
to betterprepared feed,
a collective increase in gold yield estimated at
20%
due
to improved liberation,
and enhanced working conditions from reduced dust
and noise at individual worksites.

7. PERTIMBANGAN KOMERSIL

Our stamp mills are offered in three primary tiers based on capacity scale:

1.
Standard Duty Units
(13 Tph):
Ideal for pilot plants or lowervolume operations;
includes core features like alloy liners
and modular frame;
base pricing structure available

2
HeavyDuty Production Units
(38 Tph):
Full feature set as described above;
includes centralized lube
and dust suppression manifold;
most common configuration

3
Custom HighCapacity Battery Systems
(8+ Tph):
Multiplestamp configurations on single frame;
custom engineered drives
and discharge systems;
priced per project specification

Ciri Pilihan:
VFD motor controls for speed adjustment,
onboard belt conveyor systems for discharge handling,
advanced vibration monitoring sensors,
alat ganti kit permulaan

Pakej Perkhidmatan:
Pilih daripada Waranti Asas (
12 bahagian bulan),
Extended Service Plans (
up t o36 months),
or Onsite Training &
Commissioning Support packages

Pilihan Pembiayaan:
Commercial leasing structures are available through partners,
enabling Capex preservation;
also eligible f ortradein programs f orexisting comminution equipment

8.Soalan Lazim

Q:What is t hemaximum input rock size your stamp mill can accept?
A:The feed hopper is designed t oaccommodate ROM ore with amaximum dimension of approximately350mm (
14 inci).
Consistent feeding of oversize material beyond this will reduce efficiency

Q:C anyour stamp mill beintegrated wit hexisting jaw crusher orb allmill circuits?
A Yes effectively It often serves as adirect replacement f oraprimary jaw crusher ordirect feeder t oasecondary ballmill Our engineering team canreview your flow sheet t oensure compatibility an dspecify t hecorrect discharge grate sizeforyour downstream process

Q:What are t hecritical daily maintenance requirements?
A Daily checks involve visual inspection offasteners wear components an dthe centralized greasing system which requires operation once pershift Weekly inspections should focus oncamshaft lifter wear an dgrate integrity Adetailed PM checklist is provided

Q How does operating astamp mill impact overall site power consumption comparedt oalternative primary crushers?
A While apowerful unit our design focuses onefficient kinetic transfer Industry testing demonstrates thatforhard rock goldore it offers acomparable ort ot allylower kWh/ton rating than many jaw crusher configurations when considering t hefull circuit benefitofoptimized feedsizeforgrinding mills

Q What is t hetypical lead time f oraheavy duty production unit?
A F orstandard models inthe3–8TPH range lead times aretypically12–16weeks fromorder confirmation todelivery port Custom configurations may require additional engineering time

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda