Perkhidmatan Reka Bentuk Kilang OEM Slag Crusher Plant
1. PEMBUKAAN PAINPOINT DRIVEN
Menguruskan sanga adalah kesesakan yang berterusan dengan kos yang ketara. Adakah anda menghadapi cabaran operasi ini?
Throughput Tidak Boleh Dipercayai: Inconsistent crusher performance creates pileup at the furnace or converter, delaying upstream processes and forcing costly production pauses.
Excessive Downtime: Kegagalan mekanikal yang kerap, tukar bahagian pakai, and unplanned maintenance halt your entire material recovery line, costing thousands per hour in lost processing time.
Kos Operasi yang Tinggi: Premature wear on crusher jaws, pelapik, and rotors from abrasive slag leads to soaring spare part inventories and labor expenses.
Penggredan Produk Tidak Konsisten: Poorly sized output material complicates downstream magnetic separation or screening, reducing metal recovery rates and the market value of your aggregate byproduct.
Angkasa & Sakit Kepala Integrasi: A plant that isn’t designed for your site’s footprint or material flow creates inefficiencies in handling, increases dust, and limits future expansion.
Persoalan utama ialah: how do you transform this costly byproduct stream into a reliable, profitable operation with minimal intervention? Jawapannya bukan hanya terletak pada mesin, but in a system engineered from the ground up for your specific duty.
2. GAMBARAN KESELURUHAN PRODUK
A Slag Crusher Plant is a turnkey system designed for the primary, sekunder, and sometimes tertiary crushing of metallurgical slag (relau letupan, relau keluli). Ia berubah menjadi besar, irregular slag feed into a controlled, sized aggregate for efficient metal recovery and saleable construction material.
Aliran Kerja Operasi:
1. Suapan & PraSkrining: Runofurnace slag disalurkan melalui pemuat atau penghantar. An initial grizzly or scalper screen removes fine fractions to bypass the primary crusher.
2. Pengurangan saiz utama: A heavyduty jaw crusher or impact breaker reduces large slabs (often up to 1000mm) kepada saiz yang boleh diurus (biasanya di bawah 200mm).
3. Pemisahan Logam & Menghancurkan sekunder: The crushed material passes over an overhead magnetic separator to extract liberated ferrous metal. Remaining material is conveyed to a secondary cone or impact crusher for final sizing.
4. Saringan Akhir & Stok: A vibrating screen classifies the output into precise product fractions (mis., 05mm, 520mm, 2040mm) for market or further processing.
Skop Permohonan: Direka untuk loji keluli bersepadu, peleburan, faundri, and standalone slag processing yards handling ferrous slags.
Batasan: Not suitable for primary mining of virgin rock; feed must be within designated maximum size and hardness (typically Mohs 78 for slag). Nonferrous slag processing may require different separation technology.
3. CIRI TERAS
Penghancur Utama Tugas Berat | Asas Teknikal: Bingkai bertetulang & kinematics optimized for high shock loads from slabby slag | Faedah Operasi: Sustained throughput with minimal frame stress or fatigue cracking | Kesan ROI: Extended structural lifespan reduces risk of catastrophic failure and associated capital replacement costs.
Pengasingan Magnet Bersepadu | Asas Teknikal: Overband selfcleaning magnets positioned at optimal discharge points | Faedah Operasi: Continuous extraction of pure metallic fraction directly during crushing stages | Kesan ROI: Maximizes metal yield recovery—often by 38%—directly improving revenue from scrap sales.
AbrasionResistant Material Flow | Asas Teknikal: Hardoxlined hoppers, AR steel plate chutes, and ceramiclined wear zones at impact points | Faedah Operasi: Dramatically reduced maintenance intervals for flowpath components | Kesan ROI: Lowers annual wear part expenditure by up to 40% and reduces liner change downtime.
Sistem Kawalan PLC Berpusat | Asas Teknikal: Automated sequencing with load management and fault diagnostics | Faedah Operasi: Enables operation by a single controller with clear visibility over all plant functions | Kesan ROI: Optimizes power consumption per ton crushed and reduces labor requirements for monitoring.
Modular Skid/Module Design | Asas Teknikal: Preassembled structural modules with integrated walkways and maintenance access | Faedah Operasi: Significantly faster onsite installation and commissioning (minggu vs. bulan) | Kesan ROI: Reduces civil works cost by up to 30% and accelerates timetorevenue from project start.
Integrasi Sistem Penindasan Habuk| Asas Teknikal: Nozzle arrays at transfer points matched to fanpowered extraction where required| Faedah Operasi: Maintains site environmental compliance and protects worker health| Kesan ROI: Avoids regulatory fines and reduces longterm equipment wear caused by abrasive dust ingress.
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Industry Standard Slag Plant | Our OEM Slag Crusher Plant Solution | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Adanya / Masa aktif| ~85%, kerap berhenti tanpa dirancang| >92%, melalui reka bentuk yang mantap & predictive maintenance access| +8% masa operasi |
| Tons Per Hour Consistency| Fluctuates ±15% with feed variation| Maintains within ±5% via optimized feed regulation & crusher controls| +10% throughput stability |
| Kos Pakai setiap Tan Diproses| Berdasarkan keluli mangan standard| Reduced through targeted use of premium alloys & ceramic liners| 25% ke 40% |
| Kadar Pemulihan Logam| Passive separation postcrushing| Active extraction at multiple crushing stages| +3% ke +8% peningkatan hasil |
| Pemasangan & Masa Pentauliahan~1624 weeks onsite~1014 weeks with modular design|30% ke 40% penyebaran lebih cepat |
5. SPESIFIKASI TEKNIKAL
Julat Kapasiti: Boleh dikonfigurasikan daripada 50 TPH berakhir 300 TPH of bulk slag.
Saiz Suapan Maksimum: Up to 1000mm x 1200mm slab form.
Keperluan kuasa: Plant total connected load typically between 250kW – 800kW depending on configuration; designed for 415V/3Phase/50Hz or customer specification.
Spesifikasi Bahan: Primary crusher frames in hightensile steel; liners in Mn18Cr2 or equivalent; wear plates in Hardox 400/500; chutework in abrasionresistant (AR) steel plate.
Dimensi Fizikal (Reka Letak Biasa): Modular design adaptable to site; typical footprint length ranges from 40m to 70m including stockpile conveyors.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +45°C; dust emission control achieves <10 mg/Nm³ pada titik penjanaan dengan sistem bersepadu.
6. SENARIO APLIKASI
Integrated Steel Plant – Blast Furnace Slag Granulation Feedstock
Challenge A major steel producer needed consistent sub30mm aggregate for their granulation plant but faced constant jamming in their old doubletoggle jaw crusher from sticky slag masses.
Solution Implementation of a custom Slag Crusher Plant featuring a deepchamber primary impactor with hydraulic assist for clearing blockages.
Results Throughput stabilized at constant180 TPH; blockages eliminated through automated reversal cycles; granulation plant efficiency improved due to consistent feed size.
Independent Slag Processing Contractor – Multiple Source Materials
Challenge A processor handling diverse slags from various mills experienced high secondary cone crusher mantle wear costs due to uncrushable tramp metal passing initial separation.
Solution A threestage plant was designed with two stages of magnetic separation—precrush scalping plus postprimarycrush extraction—and an automated metal trap before the cone crusher.
Results Tramp metal incidents reduced by over95%; cone crusher liner life extended by60%; final aggregate quality improved significantly for highervalue applications.
MiniMill – EAF Slag Processing
Challenge Limited site space prevented a traditional linear crushing circuit layout neededfor their expanding Electric Arc Furnace output.
Solution A compact vertical layout Slag Crusher Plant using skidmounted primaryand secondary units stackedwith radial stacker conveyors was engineered.
Results The plant fit into50% less floor area than conventional designs while meeting150 TPH requirement; modular design allowed future relocation as site layout evolved.
7. PERTIMBANGAN KOMERSIL
Our approach provides clarity on investment:
Peringkat Harga Peralatan:
Konfigurasi Pangkalan (Penghancuran utama + Basic Separation): For operations focused solely on size reduction prior to external processing.
Konfigurasi Standard (TwoStage Crushing + Full Magnetic Recovery): Our most common solution offering balanced CAPEX/OPEXfor full metal recoveryand aggregate production
Konfigurasi Premium (MultiStage Crushing+ Advanced Screening+ Full Automation): For highvolume producers requiring maximum product flexibilityand minimal manpower
Ciri Pilihan termasuk:
Onboard diesel generator setsfor remote sites
Advanced water spray systemsfor dust control
Metal fragmentizer systemsfor densemedical ball purification
Complete electrical house(EHouse)for simplified wiring
Service Packages rangefrom annual inspection planswith guaranteedwear part kits tooffsite monitoring supportand fulloperationandmaintenance contracts
Financing Options can be discussed including leasetoown structuresor productionlinked repayment models aligning investment costswith operational cash flow
Soalan Lazim
What are the key factors determining whether I need a jawor impactcrusheas my primary unit?
The choice hinges primarilyon feed characteristics Jawcrushers excelon very slabby densefeed where compression strengthis critical Impactcrushers offer better reduction ratiosand handle moderately slabby material well oftenat lower initial cost We analyzeyour specificslag samplesand feed sizeto recommendthe optimaltype
How doesan OEM factorydesignedplant differfrom piecing together individualcrushers myself?
An OEMdesignedSlag CrushePlant ensuresall componentsare matchedfor capacity wear protectionand flow eliminatingbottlenecks It includesintegrated safety access platforms dust control wiring anda singlecontrol system This holisticapproach delivershigher reliability lower operatingcost per tonand singlesource accountability
Can this plantbe integratedwith our existingconveyorsandscreening equipment?
Yes integrationis standard practice We conducta full review ofyourexisting infrastructureto designinterfacing modules that connectto your current system maximizingyourearlier investmentwhile upgradingthe corecrushing andrecovery process
What isthe typicalimplementation timelinefrom orderto commissioning?
Fora standardconfiguration leadtimeis approximately18–22 weeks Followingorder confirmation Detailed engineeringrequires4–6 weeks shopfabricationtakes10–12 weeks onsiteinstallationand commissioningtypicallyrequires2–4 weeks Modular designs significantlyreduceonsite labor time
What kindof aftersalessupportcan we expect?
Support includesdetailedoperational trainingforyour team comprehensive manuals spare parts recommendationswith stocking programsand remote diagnostic support Service engineersare availablefor scheduledmaintenanceor technicalassistance Field data showsplanned maintenancecontractscan reduceunplanned downtimeby over70%
Are there financingoptions availableforthe completeplant?
Yes we workwith severalindustrial equipmentfinancing partners Options includecapitallease operatingleaseor loan agreements Structurescan oftenbe tailoredto matchprojectedcash flowsfrom themetal recoveryand aggregatesales generatedbythe plant
How doyou ensurethe plantmeetsour local environmentalregulations fordust& bunyi bising?
Our designsincorporate internationallyrecognizedcontrol standards Wet suppression systemsare sizedbasedon throughput Noise attenuationmeasures includeacoustic enclosuresfor key drives We provideall necessarytechnicaldocumentationto supportyour permitapplications


