Kilang OEM Ball Mill Premium

Penerangan ringkas:

1. PAINPOINT DRIVEN OPENING Are you facing persistent operational bottlenecks that undermine your plant’s profitability? Untuk pengurus loji dan kontraktor kejuruteraan, the grinding circuit is often the source of significant challenges. Frequent liner wear leading to unplanned downtime, inconsistent grind size affecting downstream recovery, and excessive energy consumption per ton of processed material directly erode…


Perincian produk

Tag produk

1. PEMBUKAAN PAINPOINT DRIVEN

Are you facing persistent operational bottlenecks that undermine your plant’s profitability? Untuk pengurus loji dan kontraktor kejuruteraan, the grinding circuit is often the source of significant challenges. Frequent liner wear leading to unplanned downtime, inconsistent grind size affecting downstream recovery, and excessive energy consumption per ton of processed material directly erode your bottom line. Are you calculating the true cost of maintenance cycles that halt production for days? Is variability in your final product quality causing losses in concentrate grade or leaching efficiency? Ini bukan sahaja isu peralatan; they are direct threats to operational ROI. The selection of a premium ball mill is a critical capital decision that addresses these core challenges.

2. GAMBARAN KESELURUHAN PRODUK

This product is a premiumgrade, kapasiti tinggi kilang bola direka bentuk untuk berterusan, pengisaran tugas berat dalam pemprosesan mineral dan operasi pengilangan industri. Its design focuses on transforming raw, crushed feed into a finely ground product suitable for subsequent separation or chemical processing.

Aliran Kerja Operasi:
1. Pengenalan suapan: bijih yang dihancurkan (biasanya <25mm) dihantar ke dalam kilang melalui pelongsor suapan.
2. Tindakan Pengisaran: The rotation of the mill causes the grinding media (bola keluli) untuk melata dan memberi kesan kepada bijih, reducing particle size through impact and attrition.
3. Particle Discharge: Ground material exits through a discharge grate, which retains grinding media while allowing slurry or dry powder to pass for further processing.

Skop Permohonan: Ideal for wet or dry grinding in base metals (Tembaga, memimpin, zink), logam berharga (emas, silver), Mineral Perindustrian, dan pengisaran klinker simen.
Had Utama: Not designed for primary crushing of large rock; optimal feed size must be adhered to. Performance is highly dependent on correct media selection and mill loading for the specific ore characteristics.

3. CIRI TERAS

Sistem Pelapik Termaju | Asas Teknikal: Keluli aloi krom tinggi & engineered profile design | Faedah Operasi: Reduces wear rates by up to 40% berbanding keluli mangan standard, memanjangkan selang perkhidmatan | Kesan ROI: Lowers liner replacement costs and increases annual available production time by an estimated 15%

Precision Gear Drive & Perhimpunan Galas | Asas Teknikal: Helical gearing with computerized alignment protocols | Faedah Operasi: Ensures smooth transmission of power with >98% mechanical efficiency, reducing vibration and risk of catastrophic failure | Kesan ROI: Decreases energy loss and eliminates unscheduled downtime related to drive train issues

Sistem Pelinciran Pintar | Asas Teknikal: Automatik, circulating oil system with temperature and pressure monitoring | Faedah Operasi: Provides guaranteed lubrication to trunnion bearings under all load conditions, preventing overheating and seizure | Kesan ROI: Menghapuskan kegagalan berkaitan galas, a leading cause of major mill stoppages

Optimized Discharge Grate Design | Asas Teknikal: Computermodeled aperture geometry and reinforced structure | Faedah Operasi: Maximizes throughput by preventing plugging while ensuring full media retention for consistent grinding power | Kesan ROI: Maintains design capacity and product size distribution without manual intervention

Kilang OEM Ball Mill Premium

Structural Integrity Assurance | Asas Teknikal: Analisis Unsur Terhingga (FEA) on shell and weld points under dynamic loads | Faedah Operasi: Withstands cyclical stresses over a 20+ year design life without fatigue cracking or deformation | Kesan ROI: Protects capital investment and avoids costly structural repairs

Pelabuhan Pemantauan Keadaan Bersepadu | Asas Teknikal: Preinstalled sensor mounts for vibration, suhu, dan pelepasan akustik | Faedah Operasi: Enables predictive maintenance strategies by providing direct data on mill health and liner wear status | Kesan ROI: Transforms maintenance from calendarbased to conditionbased, optimizing part utilization

4. KELEBIHAN KOMPETITIF

| Metrik Prestasi | Penanda Aras Piawaian Industri | Premium Ball Mill Solution | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Hayat Perkhidmatan Pelapik (Bijih Pelelas) | ~68 Bulan | 1012 berbulan-bulan | +40% |
| Penggunaan tenaga (kWj/t) Garis dasar = 100%| 100% (Garis dasar) | 9295% (Dependent on application) |5% ke 8% |
| Masa Min Antara Kegagalan (MTBF) Komponen Utama| ~8,000 Jam| >12,000 Jam| +50% |
| Ketekalan Saiz Kisar (± P80 Variation)| High Variation| Tight Control (±3%)| Significant Improvement |
| Ketersediaan Tahunan (Tidak Termasuk Perhentian Terancang)| ~9294%| >96%| +24 Mata Peratusan |

5. SPESIFIKASI TEKNIKAL

Julat Kapasiti: Dari skala perintis (50 kw) to full production models up to 10 MW.
Keperluan kuasa: Configured for 6kV/11kV mediumvoltage motors; complete drive package including soft starter or VFD options.
Spesifikasi Bahan:
Shell & kepala: ASTM A36 Carbon Steel
Pelapik & Media Options: HighChrome Steel (>18% Cr), Aloi NiHard
Girth Gear & Pinion: Keluli aloi palsu
Galas Trunnion: Hydrodynamic Babbitted bearings
Dimensi Fizikal: Customengineered setiap projek; standard diameters from 1.5m to over 5m; panjang mengikut keperluan.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +50°C; suitable for dusty environments with proper sealing.

6. SENARIO APLIKASI

Projek Pembesaran Penumpu Tembaga

Challenge A major South American operation needed to debottleneck its flotation circuit hindered by an outdated ball mill producing inconsistent grind size (P80), impacting copper recovery rates.
Solution Installation of two largediameter premium ball mills with advanced control systems in closed circuit with cyclones.
Results Achieved a stable P80 grind of 150 mikron (±3%), contributing directly to a quantified increase in copper recovery of 1.7%. Mill availability reached 96.8% pada tahun pertama.Kilang OEM Ball Mill Premium

Industrial Minerals Producer – Throughput Increase

Challenge A silica processing plant required higher throughput but was constrained by space limitations preventing installation of additional mills.
Solution Replacement of two standard ball mills with one highefficiency premium ball mill featuring the optimized liner system.
Keputusan Throughput meningkat sebanyak 22% within the same footprint while specific energy consumption dropped by 7%. Extended liner life reduced annual maintenance downtime by nine days.

7. PERTIMBANGAN KOMERSIL

Peringkat Harga: Structured around mill diameter/power rating:
Peringkat I (4m dia.): Fully bespoke megamill projects including comprehensive simulation services.
Ciri Pilihan: Pemacu Kilang Tanpa Gear (GMD) sistem, advanced process control integration packages,
specialized rubber liner packages for corrosion resistance,
sistem kamera inmill,
full instrumentation suites.
Pakej Perkhidmatan: Offered as annual contracts covering:
1. Predictive Maintenance Support
2. Pelapik & Media ChangeOut Services
3. Onsite Technical Optimization Audits
4. Priority Access to OEM Spare Parts
Pilihan Pembiayaan: Available through partner institutions include capital leasing,
project financing linked to performance guarantees,
and longterm service agreements bundled into CAPEX.

8.Soalan Lazim

Q1 Is this premium ball mill compatible with our existing classification circuit?
A Yes.The discharge system can be engineered to interface with existing hydrocyclones or screens.Detailed P&ID review during presale engineering ensures compatibility.

Q2 What is the expected impact on our overall plant energy draw?
A Field data shows net energy savings per ton processed due higher mechanical efficiency.Optional VFD drives allow soft starting reducing peak demand charges.Precise figures require process review.

Q3 How does your pricing compare standard equipment?
A Initial capital investment typically higher reflecting superior materials engineering.This premium offset demonstrably lower operating costs reduced downtime leading faster payback period typically <24 months abrasive applications.

Q4 What performance guarantees are provided?
A We guarantee mechanical performance specifications such as bearing temperature gear alignment structural integrity.Grinding performance guarantees e.g., throughput fineness are based validated pilot testwork simulation specific ore type.

Q5 What is lead time delivery installation?
A Lead times vary capacity complexity.Tier II mills typically require months fabrication.Site installation commissioning managed our project engineers within agreed schedule minimize disruption your operations.

Q6 Do you provide operator training?
A Comprehensive training provided covers safe operation routine maintenance procedures troubleshooting guides ensure your team achieves designed performance quickly.

Q7 Can you supply matching ancillary equipment like feeders pumps?
A As fullscope OEM we can provide integrated package including feed conveyors slurry pumps lubrication systems ensuring singlepoint responsibility system compatibility

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda