Kilang Penghancur Bijih Besi Pengilang Label Persendirian Tempahan Minimum

Penerangan ringkas:

Targeted Iron Ore Crushing Plant Solutions for HighTonnage, LowCost Operations Are you facing persistent bottlenecks that limit your plant’s output and erode profit margins? Untuk pengurus loji dan kontraktor kejuruteraan, the primary crushing stage is often the source of critical operational challenges. Inconsistent feed size causing crusher choke? Excessive liner wear driving unsustainable parts replacement…


Perincian produk

Tag produk

Targeted Iron Ore Crushing Plant Solutions for HighTonnage, LowCost Operations

Are you facing persistent bottlenecks that limit your plant's output and erode profit margins? Untuk pengurus loji dan kontraktor kejuruteraan, the primary crushing stage is often the source of critical operational challenges. Inconsistent feed size causing crusher choke? Excessive liner wear driving unsustainable parts replacement costs? Unplanned downtime for maintenance crippling your production schedule? The costs are quantifiable: every hour of unexpected downtime in a 2,000 tph operation can mean over 8,000 tons of lost throughput and sixfigure revenue impacts. How do you achieve reliable, highvolume reduction of abrasive magnetite or hematite while controlling your total cost of ownership?

Gambaran Keseluruhan Produk: HeavyDuty Primary Iron Ore Crushing Station

Our engineered solution is a complete, skidmounted or modular primary crushing plant designed explicitly for the rigorous demands of iron ore processing. This turnkey system is built to accept direct dump from haul trucks or excavators and deliver a consistently sized product to your downstream conveying and beneficiation circuits.Kilang Penghancur Bijih Besi Pengilang Label Persendirian Tempahan Minimum

Aliran Kerja Operasi:
1. Suapan & PraSkrining: Runofmine ore is deposited into a rugged vibrating grizzly feeder, which bypasses sub100mm fines to reduce primary crusher load.
2. Pengurangan utama: Oversize material is crushed in a heavyduty jaw crusher or gyratory crusher (configuration dependent on feed size and capacity requirements).
3. Pengangkutan Produk: Crushed product is discharged onto a main conveyor belt, sized for your specific tonnage and incline requirements.
4. System Control: The entire process is managed from an integrated control cabin with PLCbased automation for optimal feed regulation and safety.

Skop Permohonan & Batasan:
Skop: Ideal for greenfield installations or expansion projects requiring 500 – 3,000+ kapasiti tph. Suited for primary crushing of abrasive iron ores (Fe content 3065%).
Batasan: Not designed as a standalone fine crushing or grinding circuit. Maximum input lump size is determined by crusher model selection; typically handles up to 1,500mm feed.

Ciri Teras: Engineered for Iron Ore

Reka Bentuk Penghancur Tugas Berat | Asas Teknikal: Highchromium cast iron liners & reinforced chamber geometry | Faedah Operasi: Extended wear life in highly abrasive crushing environments | Kesan ROI: Mengurangkan kekerapan penukaran pelapik sehingga 40%, lowering parts cost and labor hours.

Integrated PreScreening Grizzly | Asas Teknikal: Adjustable grizzly bars on a high Gforce feeder deck | Faedah Operasi: Removes fines prior to crushing, increasing effective throughput and reducing crusher power consumption | Kesan ROI: Data lapangan menunjukkan a 1525% increase in effective crusher capacity by eliminating fine material processing.

Centralized PLC Automation | Asas Teknikal: Programmable Logic Controller with load and level sensors | Faedah Operasi: Your operators maintain optimal crusher cavity levels, preventing choke or empty running conditions automatically | Kesan ROI: Minimizes power waste and mechanical stress, contributing to an estimated 812% reduction in energy costs per ton.

Modular Structural Frame | Asas Teknikal: Fabricated steel frame with integral lifting points and alignment pins | Faedah Operasi: Enables faster site installation and future relocation with minimal civil works required | Kesan ROI: Cuts installation time by up to 30%, accelerating project commissioning and cash flow.

Dedicated Maintenance Access | Asas Teknikal: Strategically placed platforms, tangga, and hydraulic assist systems for major components | Faedah Operasi: Safe, efficient access for liner changes and routine servicing tasks | Kesan ROI: Reduces planned maintenance window duration by approximately 25%, peningkatan waktu operasi tahunan.

Kelebihan Kompetitif

| Metrik Prestasi | Piawaian Industri (Purata) | Our Iron Ore Crushing Plant Solution | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Kehidupan Pakai Pelapik (Bijih Pelelas) | ~600,000 tons per set | ~850,000 tons per set (verified) | +41% |
| Mechanical Availability Target | 92% 94% (primary stage)| >96% (contractually guaranteed) |> +4 pts |
| Tons per Hour per Installed kW| Berbeza secara meluas; lower efficiency on fines| Optimized via prescreen; higher efficiency| Hingga +20% |
| Pemasangan & Masa Pentauliahan| 812 minggu (fixed foundation)|57 minggu (reka bentuk modular)| 35% |

Spesifikasi Teknikal

Julat Kapasiti: Boleh dikonfigurasikan daripada 500 ke atas 3,000 Ton metrik sejam (MTPH).
Keperluan kuasa: Motor pemacu utama dari 150 kW kepada 400 kw; total plant connected load defined by configuration.
Spesifikasi Bahan: Crusher liners use ASTM A532 Class III Type A highchrome iron; structural steel is ASTM A36 with abrasionresistant plating in highwear zones.
Dimensi Fizikal (Contoh Konfigurasi): Modular footprint approximately 22m L x 8m W x 9m H. Exact dimensions are projectspecific.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +50°C. Dust suppression system included as standard.

Senario Aplikasi

LargeScale Open Pit Mine Expansion

Cabaran: A major magnetite operation needed to increase primary crushed tonnage by 60% without expanding the existing truck dump pocket footprint. The existing system suffered from frequent bridging and required excessive dozer support.
Penyelesaian: Implementation of a modular iron ore crushing plant featuring an ultrawide jaw crusher with an aggressive stroke profile and an integrated apron feeder for positive feed control.
Keputusan: Achieved a sustained throughput of 2,800 tph. Bridging incidents were eliminated due to improved hopper geometry and feeder design. The expansion was completed within the planned shutdown period.

MidSize Hematite Processing Plant Upgrade

Cabaran: An older primary jaw crusher was causing bottlenecking due to excessive maintenance needs and unacceptably high product flakiness affecting secondary cone crusher performance.
Penyelesaian: Replacement with a new primary crushing plant configured with a deepchamber jaw crusher optimized for slabby hematite ore and an adjustable grizzly feeder.
Keputusan: Plant availability at the primary stage increased from 88% ke 96.5%. The improved product shape allowed the secondary circuit to operate at 12% higher efficiency. Total cost per ton crushed fell by an estimated 18%.

Pertimbangan KomersialKilang Penghancur Bijih Besi Pengilang Label Persendirian Tempahan Minimum

We structure commercial terms to align with project financing cycles and operational budgets.

Peringkat Harga Peralatan:
Konfigurasi Pangkalan: Includes primary crusher, penyuap, discharge conveyor, laluan pejalan kaki, tangga, and basic PLC controls.
Konfigurasi Dioptimumkan (Most Common): Base plus integrated dust suppression system, hydraulic adjustment assists for the crusher, advanced motor starters, and premium wear liners.
Full Modular Turnkey: Complete system including electrical house(s), advanced automation with remote monitoring prep,and all interconnecting conveyors on modular frames.

Ciri Pilihan & Naik taraf: Onboard weighing systems,camera monitoring packages,belt rip detection systems,and special corrosion protection coatings for coastal environments.

Pakej Perkhidmatan: Available service agreements range from scheduled inspection programs to full liner changeout servicesand guaranteed parts supplywith fixed annual cost models.

Pilihan Pembiayaan: We work with accredited partners to offer equipment leasing solutions,turnkey project financing,and rentaltoown structures tailoredto capital expenditure plans.

Soalan Lazim

1. How do I determine if this plant is compatible with my existing conveying infrastructure?
Our engineering team requires key parameters including required discharge height,target tonnage,and belt width/power of your existing receiving conveyor.We design the discharge chuteand interface conveyor accordinglyto ensure seamless integration into your flow sheet.

2. What impact will this have on my overall plant’s energy consumption?
The inclusion of prescreening reduces the volume of material entering the crusher itself,typically loweringthe specific energy consumption(kWj/tan)of the primary stageby1520%.Field data confirms net energy savingsat the system level despite added feeder motors.

3. What are typical lead times from order placementto commissioning?
For standard configurationsin our product line,fabrication lead times range between18and26 weeks.Site preparationguidanceis provided immediately upon order.A dedicated project manager oversees all milestones through deliveryand supervised commissioning.

4. What commercial terms are offeredfor spare parts?
We offer tiered pricingfor spare parts.Clients who opt fora service agreement receivepreferred pricing—typically1520% below list price—and guaranteed48hour shippingfor critical wear itemsfrom regional stock points.This stabilizes longterm operating costs.

5. Is operator training includedwiththe purchase?
Yes.A comprehensive training programfor your operationsand maintenance crews is includedas part ofthe commissioning process.This covers normal operation,troubleshooting procedures,and safe lockout/tagout practices specificto the installed equipment.Documentationis providedin both digitaland hard copy formats

6.What site preparationis requiredfor themodular plants?
A level compacted gravel pador minimal concrete foundationis typically sufficientdue tot heplant’s selfsupporting modular frame.Detailed civil drawingswithload specificationsare providedatthe detailed design stagefollowingorder placement.This significantly reducescivil engineeringcosts comparedto traditional fixed plants

7.How doesyour solutionhandle variationsin ore hardness(e.g.,banded iron formation vs.softer itabirite)?
Crushersare selectedbasedon your specificore characteristicsincluding compressive strengthand abrasiveness.Hydraulic adjustment systemsallow operators torecalibrateclosed side setting(CSS)in minutesto adaptproduct sizefor varying conditionsmaintaining throughput targets without mechanical intervention

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda