Gold Ore Crushing Equipment Contract Manufacturer Prices
1. PEMBUKAAN PAINPOINT DRIVEN
Are unpredictable maintenance cycles and component wear causing excessive downtime in your primary crushing circuit? Is the abrasive nature of hard rock gold ore leading to premature liner failure and rising perton processing costs? Are you managing bottlenecks where your crusher cannot keep pace with upstream loading, mengehadkan keseluruhan pengeluaran loji? These operational challenges directly impact your bottom line through lost production hours, high replacement part expenditures, and constrained recovery rates.
The right primary crushing equipment is a capital investment that dictates downstream efficiency. How do you select a machine that balances high availability with manageable operating costs? What specifications ensure consistent feed size reduction for optimal SAG or ball mill performance? This analysis addresses the critical factors in selecting durable, cekap peralatan penghancur bijih emas.
2. GAMBARAN KESELURUHAN PRODUK
This product line focuses on stationary and semistationary primary jaw crushers engineered for hard rock gold ore processing. Designed as the first stage in comminution, mesin ini menerima runofmine (ROM) feed directly from haul trucks or feeders.
Aliran Kerja Operasi:
1. bijih ROM (up to specified top size) is deposited into the vibrating grizzly feeder (VGFF VGF) integrated with the skid or hopper.
2. The VGF removes subfines and directs oversize material into the crusher’s chamber.
3. The robust jaw assembly executes a compressive crushing action, reducing ore to a predetermined product size.
4. Crushed material discharges onto a main conveyor for transport to secondary crushing or stockpiling.
5. Hydraulic adjustment systems allow for quick CSS (Tetapan sampingan tertutup) changes to compensate for feed variability.
Skop Permohonan: Ideal untuk memproses keras, abrasive gold ores such as quartz veins and sulphidebearing rock in greenfield installations or plant upgrade projects. Suited for operations with planned annual throughputs from 150,000 ke atas 1,500,000 tan.
Batasan: Tidak direka sebagai penyelesaian kendiri; requires integration with feeding and conveying systems. For ore with high clay or moisture content causing packing, prescreening/scalping is recommended.
3. CIRI TERAS
Pembinaan Rangka Tugas Berat | Asas Teknikal: Analisis Unsur Terhingga (FEA) pengagihan tekanan yang optimum | Faedah Operasi: Eliminates frame fatigue and cracking under cyclical loading from hard rock | Kesan ROI: Dilanjutkan hayat struktur seterusnya 20 tahun, protecting core capital asset
Rahang Keluli Mangan Mati & Pinggan Pipi | Asas Teknikal: Komposisi keluli aloi pengerasan kerja | Faedah Operasi: Pelapik membangunkan lapisan permukaan yang mengeras semasa operasi, increasing wear life in abrasive conditions | Kesan ROI: Mengurangkan kekerapan penggantian pelapik dengan anggaran 3050%, menurunkan inventori bahagian dan kos buruh
Togol Hidraulik & Sistem Pelarasan | Asas Teknikal: Silinder hidraulik dualaks menggantikan plat togol mekanikal | Faedah Operasi: Enables remote adjustment of CSS for product size control and provides automated clearing of chamber blockages | Kesan ROI: Mengurangkan masa henti untuk pelarasan rutin melebihi 70% and prevents major downtime events from tramp metal
Aci Sipi Tugas Berat Diameter Besar | Asas Teknikal: Dipalsukan daripada keluli aloi integriti tinggi, supported by spherical roller bearings | Faedah Operasi: Sustains high inertia and crushing force without deflection, ensuring consistent throughput even under full load | Kesan ROI: Maintains design capacity targets, preventing upstream haul truck queuing and optimizing overall plant flow
Pangkalan Motor Bersepadu & Pengawal Pandu Tali Pinggang | Asas Teknikal: Unified fabrication allowing precise Vbelt alignment with full safety encapsulation | Faedah Operasi: Minimizes vibration transfer, extends belt and bearing life, and ensures operator safety compliance | Kesan ROI: Reduces unscheduled drive maintenance events and mitigates site safety incident risk
Titik Greasing Berpusat & Pelabuhan Pemantauan Keadaan | Asas Teknikal: Lube lines routed to key bearing points with ports for sensor installation | Faedah Operasi: Enables systematic preventive maintenance and realtime monitoring of bearing temperature and vibration | Kesan ROI: Facilitates conditionbased maintenance planning, preventing catastrophic bearing failures

4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Piawaian Industri (Purata) | Penyelesaian Peralatan Penghancur Bijih Emas Ini | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Ketersediaan Mekanikal (Hard Rock) | 8892% | 9496%+ | +4% (Fewer unplanned stops) |
| Kehidupan Pakai Pelapik (Bijih Pelelas) | Garis dasar (100%)| 130150%| +3050% (Extended campaigns) |
| Throughput Consistency at Max Feed Size| +/ 10% fluctuation| +/ 5% fluctuation| +50% keluaran yang lebih stabil |
| Penggunaan Tenaga setiap Tan Hancur| Garis dasar (100%)| ~95%| 5% (Higher mechanical efficiency) |
| Masa Purata Antara Baik pulih Utama| ~12,000 jam| ~16,000 jam| +33% operational lifespan |
5. SPESIFIKASI TEKNIKAL
Kapasiti Julat Model: 200 1,200 tan sejam (Tph), depending on feed gradation and material density.
Pembukaan suapan: Dari 900mm x 600mm hingga 1500mm x 1200mm.
Keperluan kuasa: Motor penghancur utama dari 75 kW kepada 200 kw; total installed power including VGF drive from 90 kW kepada 240 kw. Voltage tailored to site requirements (mis., 415V/3/50Hz or 690V/3/60Hz).
Spesifikasi Bahan: Rangka keluli rekaan berkekuatan tinggi (ASTM A36); Rahang Keluli Mangan Austenitik mati & plat pipi (ASTM A128 Gred B3/B4); Aci sipi keluli aloi palsu.
Dimensi Fizikal: Skidmounted footprint ranges from approximately 8m(L) x 2.5m(W) x 3m(H) to 12m(L) x 3m(W) x 4m(H).
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +45°C; pengedap habuk dinilai untuk perlindungan IP66; optional packages available for highaltitude or marine environments.
6. SENARIO APLIKASI
Hard Rock Greenfield Project in West Africa
Cabaran: A new mine required a primary crusher capable of processing highly abrasive granitic gold ore with minimal onsite technical support infrastructure. Reliability was paramount.
Penyelesaian: Installation of a heavyduty jaw crusher with advanced wear liners and a fully automated grease lubrication system.
Keputusan: Achieved mechanical availability of 95.2% pada tahun pertama beroperasi. Hayat pelapik melebihi unjuran oleh 22%, reducing planned shutdown frequency.
Plant Upgrade in an Established Australian Operation
Cabaran: An aging primary crusher was the bottleneck limiting increased plant throughput following an expansion of pit operations.
Penyelesaian: Replacement with a highercapacity jaw crusher featuring a larger feed opening and more aggressive crushing kinematics.
Keputusan: Daya tampung meningkat sebanyak 18%, eliminating the bottleneck. The hydraulic toggle system reduced annual blockagerelated downtime by approximately 40 jam.
7. PERTIMBANGAN KOMERSIL
Peringkat Harga: Capital cost is determined by model size/capacity (+/ $250K $1M+ USD), tahap penyesuaian, and ancillary equipment included on the skid.
Ciri Pilihan & Pakej:
Advanced automation package (PLC control with touchscreen HMI)
Penyepaduan sistem penindasan habuk
Specialized wear liner profiles for specific ore characteristics
Heavyduty walkways, platform, dan menjaga
Kit permulaan alat ganti
Pakej Perkhidmatan:
1. Waranti Asas: Standard parts/labor warranty covering initial defects.
2.
3.Pelan Sokongan Lanjutan: Termasuk pemeriksaan berjadual, discounted spare parts rates,
and priority technical support via phone/video.
4.FullService Maintenance Agreement: Comprehensive coverage including all planned preventive maintenance,
wear part replacement based on monitored conditions,
dan masa tindak balas yang terjamin.
Financing options include traditional capital lease agreements,
pajakan operasi,
and projectspecific financing structures tailored to mine development timelines.
8\. Soalan Lazim
S1:
Are these crushers compatible with existing vibrating grizzly feeders
dan penghantar?
A1:
ya,
dimensional drawings
and interface points are provided early in the process.
Our engineering team can adapt discharge heights
and skid configurations to integrate with most existing plant layouts,
ensuring minimal civil works are required.
S2:
Apakah kesan yang dijangkakan pada keseluruhan cabutan kuasa loji saya?
A2:
Field data shows our drive train efficiency results in power consumption at or slightly below industry average for equivalent throughput.
Exact figures depend on ore competency;
we provide detailed motor performance curves based on your specific ore testing data.
S3:
How does the pricing structure account for optional features?
A3:
We provide transparent base equipment pricing
with clear lineitem costs for all optional packages.
This allows you to evaluate the return on investment
for each feature based on your operational priorities
and budget constraints.
S4:
What are typical lead times from order placement to delivery?
A4:
Untuk model standard,
masa memimpin berkisar dari 2032 minggu,
influenced by current global manufacturing capacity
and shipping logistics to your site location.
Pilihan terpantas mungkin tersedia.
S5:
Adakah latihan pengendali disertakan?
A5:
ya,
comprehensive training covering safe operation,
prosedur penyelenggaraan rutin,
and basic troubleshooting is included as part of commissioning services at your site.
S6:
Can you supply wear parts after commissioning?
A6:
We maintain an extensive global supply chain network
for genuine OEM wear parts.
Inventory levels at regional hubs are managed based on predictive analytics of customer usage patterns
to maximize part availability when needed


