Eco-Friendly Gold Ore Crushing Equipment Manufacturing

Penerangan ringkas:

H1: Kecekapan Tinggi, LowImpact Gold Ore Crushing Systems for Modern Mining Operations 1. PAINPOINT DRIVEN OPENING Managing a gold processing plant requires balancing throughput with profitability and increasingly, tanggungjawab alam sekitar. Traditional crushing circuits often undermine these goals. Adakah anda menghadapi cabaran khusus ini? Penggunaan Tenaga Berlebihan: Primary and secondary crushers are among the largest power draws…


Perincian produk

Tag produk

H1: Kecekapan Tinggi, LowImpact Gold Ore Crushing Systems for Modern Mining Operations

1. PEMBUKAAN PAINPOINT DRIVEN

Managing a gold processing plant requires balancing throughput with profitability and increasingly, tanggungjawab alam sekitar. Traditional crushing circuits often undermine these goals. Adakah anda menghadapi cabaran khusus ini?

Penggunaan Tenaga Berlebihan: Primary and secondary crushers are among the largest power draws in your plant. Inefficient comminution directly escalates operational costs, with energy representing over 30% of total processing expenses.
Unplanned Downtime from Contamination: Tramp steel or uncrushable material entering the crushing chamber causes catastrophic damage, leading to days of lost production and expensive component replacement.
Dust and Noise Compliance Costs: Meeting stringent site and regulatory standards for particulate emissions and noise often requires costly auxiliary systems, adding complexity and capital expenditure.
SubOptimal Liberation & Pemulihan: Inconsistent particle size distribution from older crushing technology can compromise downstream grinding and leaching efficiency, leaving valuable micron gold locked in larger particles.

How can you achieve higher throughput with lower energy input while reducing your environmental footprint? The solution lies in purposeengineered peralatan penghancur bijih emas.

2. GAMBARAN KESELURUHAN PRODUK

Our solution is a range of modular, highperformance cone crushers and jaw crushers specifically configured for gold ore processing. This equipment is designed for the highabrasion, often highclay content ores typical of gold deposits.

Aliran Kerja Operasi:
1. Pengurangan saiz utama: A heavyduty jaw crusher or gyratory crusher accepts runofmine (ROM) bijih, reducing it to a nominal 150mm product.
2. Menghancurkan sekunder: A highcapacity cone crusher further reduces the ore to a consistent 25mm feed suitable for fine grinding.
3. Process Integration: The system integrates with vibrating screens in a closed circuit to ensure optimal size distribution, with oversize material automatically recirculated.

Skop Permohonan: Ideal for hard rock lode gold deposits (urat kuarza, bijih sulfida). Engineered for both stationary plant installations and semimobile configurations.
Batasan: Not designed as a standalone solution for alluvial/placer deposits where scrubbing and screening are primary processes. Maximum feed size is dependent on the selected primary crusher model.

3. CIRI TERAS

Reka Bentuk Dewan Lanjutan | Asas Teknikal: Kinematik yang dioptimumkan & profil rongga | Faedah Operasi: Produces a more cubical product with fewer fines and slivers, improving downstream grinding efficiency | Kesan ROI: Data lapangan menunjukkan a 58% reduction in specific energy consumption in the ball mill circuit.

Peraturan Tetapan Automatik (ASR) | Asas Teknikal: Hydropneumatic clamping & adjustment with realtime feedback | Faedah Operasi: Maintains consistent closedside setting (CSS) tanpa campur tangan manual, ensuring stable product gradation | Kesan ROI: Eliminates product variability, protecting recovery rates; reduces operator labor requirements by an estimated 15 jam setiap minggu.

Sistem Perlindungan Logam Tramp | Asas Teknikal: Dualacting hydraulic cylinders with pressure relief valves | Faedah Operasi: Instantaneous release and reset of the crushing chamber protects against damage from uncrushable material | Kesan ROI: Menghalang purata 48 hours of unscheduled downtime annually associated with chamber clearing and major repairs.

Pemanduan Terus & Pemacu Frekuensi Boleh Ubah (VFD) | Asas Teknikal: Hightorque motor coupled directly to the main shaft; optional VFD control | Faedah Operasi: Menghapuskan kehilangan penghantaran daripada Vbelts; VFD allows soft starts and speed optimization for different ore hardness | Kesan ROI: Direct drive improves mechanical efficiency by ~4%; VFD can reduce startup current draw by 60%, lowering demand charges.

Manifold Penindasan Habuk Bersepadu | Asas Teknikal: anjing laut labirin & targeted water spray nozzles at key transfer points | Faedah Operasi: Contains dust at source without saturating the ore | Kesan ROI: Reduces requirement for standalone baghouses or scrubbers, cutting auxiliary system CAPEX by up to 30%.

HighWear Component Metallurgy | Asas Teknikal: Austenitic manganese steel castings with patented microalloying | Faedah Operasi: Mantles, cekung, and jaw plates exhibit extended service life in highly abrasive silicarich ores | Kesan ROI: Ujian industri menunjukkan a 2035% increase in wear life over standard MN14 equivalents, mengurangkan kos inventori alat ganti.

4. KELEBIHAN KOMPETITIF

| Metrik Prestasi | Piawaian Industri (Purata) | Penyelesaian Penghancuran Bijih Emas Kami | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Penggunaan Tenaga Khusus (kWj/t) | 0.9 1.2 kWj/t (menghancurkan sekunder) | 0.75 0.85 kWj/t (menghancurkan sekunder)| Hingga 15% pengurangan |
| Masa Min Antara Kegagalan (MTBF) – Komponen Utama| ~1,800 operating hours| >2,500 waktu operasi| ~39% increase |
| Product Fines (10mm) Generation| Biasanya 1822% of output| Dikawal ke 1518% of output| Reduced by up to ~20% |
| Pelepasan Bunyi pada Jarak 10m| 95100 db(A)| <85 db(A)| Exceeds common regulatory thresholds |
| Crusher Setting Adjustment Time| 60 90 minit (manual)| <10 minit (ASR system)| ~85% penjimatan masa |

5. SPESIFIKASI TEKNIKAL

Kapasiti Julat Model: Secondary crushing capacity from 150 tph sampai habis 2,500 tph.
Keperluan kuasa: Penarafan motor daripada 150 kW kepada 600 kW seunit. Designed for dualvoltage operation (3.3kV /6.6kV).
Spesifikasi Bahan: Main frame constructed from highgrade steel plate (>350 MPa yield strength). Wear liners manufactured from proprietary T12/T14 austenitic manganese steel.
Dimensi Fizikal (Example Model GC450): Total installed footprint of approx. L8m x W4m x H5m.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 25°C hingga +50°C. Dust protection rating of IP65 on all critical drives and bearings.Eco-Friendly Gold Ore Crushing Equipment Manufacturing

6. SENARIO APLIKASI

MidTier Gold Mine, Afrika Barat

Cabaran: Frequent power fluctuations and high energy costs crippling plant profitability; excessive fines generation in crushing causing packing issues in heap leach pads.
Penyelesaian: Installation of two VFDequipped cone crushers with advanced chamber profiles for tertiary crushing duty.
Keputusan: Power draw stabilized with peak demand reduced by 22%. Fines generation decreased by 17%, improving heap permeability. Overall circuit energy use fell by an estimated $280,000 setiap tahun.

Refurbishment Project, Nevada USA

Cabaran: Aging jaw crusher causing chronic bottlenecks and excessive unplanned downtime; noise levels exceeding new permit requirements.
Penyelesaian: Replacement with a new modular jaw crusher featuring an integrated dust suppression manifold and sounddampening enclosures.
Keputusan: Daya pengeluaran loji meningkat sebanyak 18% at the primary stage. Noise levels measured at below the permitted 85 db(A). Downtime incidents related to primary crushing were eliminated.

7 PERTIMBANGAN KOMERSIL

Our gold ore crushing equipment is offered under three commercial tiers:

1. Pakej Peralatan Pangkalan: Termasuk penghancur teras(s), memandu motor, sistem pelinciran, dan instrumentasi asas.
2 Pakej Loji Dioptimumkan: Base equipment plus integrated dust suppression,VFD starters,and automated setting regulation(ASR).This package delivers maximum operational efficiency.
3 Full Circuit Solution: Optimized package plus design engineeringfor integrationwith existing screensand conveyors,dan penyeliaan pentauliahan.

Service packages range from basic warranty supportto comprehensive annual maintenance agreements(AMAs)that cover scheduled inspectionswear parts replacementat preagreed ratesand priority technical support.Eco-Friendly Gold Ore Crushing Equipment Manufacturing

Financing options include capital purchasedirect leasetoown agreementsand throughputbased availability contracts where payments are partially linkedto operational tonnage.

8 Soalan Lazim

Q What isthe lead timefor deliveryof acustomconfiguredgoldorecrushing unit?
A For standard modelslead timesare typically2024 weeksfrom orderconfirmation.For fully customizedcircuitsengineeringand fabricationmay extendthis periodwhich we outlinein projectspecific proposals.

Q How doesyourequipmenthandlehighclayores thattendto causechamber packing?
A Our conecrusherchambersare designedwith steeper head anglesand optimal eccentric throwsto promote material discharge.VFDcontrol also allows operators totemporarilyincreasehead speedto clear sticky material minimizing manual cleaning interventions.

Q Are yourcrushers compatiblewith existingplantaverage automation(PLC/DCS)sistem?
A Yes.All unitscome standardwith modern PLCcontrolcapableof communicatingvia Modbus TCP/IPor Profinetprotocolsfor seamlessintegrationinto yourcentral controlroom.

Q Whatisthe expectedwear partconsumptioncostper tonne crushed?
A Thisis highlyoredependent.For typical silicarichgold orewear costsfor our premiumlinersrange between$0 .18and $0 .35per tonnein secondarycrushingapplications.We providewear modelingas partof our presales technical review

Q Do youofferonsiteoperator training?
A Yes.Commissioningalwaysincludes comprehensivehandson trainingfor your operationsand maintenancecrewscovering safe operationroutine maintenance troubleshooting proceduresand wear partchangeout protocols

Q Whatwarrantyperiodis offered?
A We providea standard24monthwarrantyon themain frameand allmanufacturingdefects.Wear parts(mantlesconcavesjaws)are coveredunder aseparate6monthperformance warrantyagainstpremature failure due tomaterial defects

Q Can youprovideperformance guarantees?
A For definedore characteristicsfeed sizeand moisture contentwe provideguaranteeson throughputcapacityproductsize distributionand maximumpower consumptionbackedby performance test clausesin ourcontracts

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda