Loji Penghancur Bijih Besi Cina R&D
1. PEMBUKAAN PAINPOINT DRIVEN
Kos operasi yang semakin meningkat dan masa henti yang tidak menentu menghakis margin pemprosesan bijih besi anda? Plant managers and engineering contractors face persistent challenges in primary crushing stages that directly impact downstream efficiency and profitability. Titik kesakitan biasa termasuk:
Pemakaian Berlebihan & Kos penyelenggaraan: Abrasive iron ore rapidly degrades crusher liners, leading to frequent shutdowns for replacement, high spare parts expenditure, and lost production.
Unplanned Downtime from Tramp Metal: Hidden scrap metal or uncrushable material in feed causes catastrophic damage to crusher internals, resulting in days of unscheduled downtime and sixfigure repair bills.
Inconsistent Feed Size & Capacity Bottlenecks: Poorly sized feed from the mine or an inefficient primary crusher creates choke points, limiting throughput and preventing the plant from reaching its designed capacity.
Penggunaan Tenaga Tinggi setiap Tan: Older crushing technology often operates at low mechanical efficiency, making energy one of the largest variable costs with poor ROI on power spend.
Pelepasan Habuk & Pematuhan keselamatan: Inadequate containment at primary crushing points creates hazardous work environments, triggers regulatory noncompliance risks, and represents valuable product loss.
Is your current primary crushing solution a reliable asset or a constant source of cost and delay? The right engineered Chinese Iron Ore Crushing Plant addresses these challenges directly.
2. GAMBARAN KESELURUHAN PRODUK
This solution is a heavyduty, stationary primary crushing station engineered specifically for the volumetric reduction of runofmine (ROM) bijih besi. It is centered on a robust gyratory or jaw crusher designed for maximum reliability and throughput in highabrasion applications.
Aliran Kerja Operasi:
1. ROM iron ore is dumped into a reinforced hopper by haul trucks.
2. A vibrating grizzly feeder (VGFF VGF) removes fine material (100mm) via a bypass chute while evenly feeding oversize material to the primary crusher.
3. The core primary crusher reduces the ore to a nominal product size of 150250mm through compressive force.
4. Crushed material is discharged onto a main conveyor system for transport to secondary crushing or stockpiling.
Skop Permohonan: Ideal for greenfield mine development or brownfield plant expansion requiring highcapacity (2,000 10,000+ Tph), continuousduty primary reduction of magnetite, hematit, or other ironbearing ores.
Batasan: Not suitable for portable or semimobile applications without significant structural modification. Requires stable foundational concrete works and planned feed control for optimal performance.
3. CIRI TERAS
Reka Bentuk Penghancur Tugas Berat | Asas Teknikal: Highchromium alloy cast iron liners & reinforced mainframe | Faedah Operasi: Extended service life in highly abrasive conditions; withstands peak loading from large feed blocks | Kesan ROI: Mengurangkan kekerapan penukaran pelapik dengan 3050%, lowering parts inventory cost and maintenance labor hours.
Integrated Tramp Iron Protection | Asas Teknikal: Hydraulic overload relief system with automatic reset | Faedah Operasi: Prevents major damage by allowing the crusher to open its setting to pass uncrushable material, then automatically return to original setting | Kesan ROI: Eliminates costly unplanned downtime events and associated component damage, protecting millions in capital equipment.
Intelligent Feed Control System | Asas Teknikal: Variablefrequency drive (VFD) on feeder coupled with crusher amp monitoring | Faedah Operasi: Automatically regulates feed rate to maintain optimal cavity level and prevent choking or running empty | Kesan ROI: Maximizes throughput capacity by 515% while reducing specific energy consumption (kWj/tan).
Penyepaduan Penindasan Debu Lanjutan | Asas Teknikal: Sealed transfer points with strategically placed fog cannons using minimal water | Faedah Operasi: Contains dust at source, improving site visibility and air quality for operators | Kesan ROI: Ensures regulatory compliance, mengurangkan kos pembersihan, and minimizes product loss as airborne fines.
Modular Walkway & Maintenance Design | Asas Teknikal: Prefabricated access platforms, hydraulicassisted liner change systems | Faedah Operasi: Menyediakan selamat, efficient access for inspection and routine maintenance tasks | Kesan ROI: Mengurangkan masa henti penyelenggaraan yang dirancang sehingga 40% and significantly improves worker safety metrics.
Centralized Greasing & Pemantauan Keadaan | Asas Teknikal: Automated lubrication system with PLC control and vibration/temperature sensor ports | Faedah Operasi: Ensures critical bearings receive precise lubrication; membolehkan penjadualan penyelenggaraan ramalan | Kesan ROI: Extends bearing life by over 20% and prevents unexpected failures through datadriven insights.
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Garis Dasar Piawaian Industri | Penyelesaian Tumbuhan Penghancur Bijih Besi ini | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Kehidupan Pelapik (Bijih Pelelas) | Berdasarkan keluli mangan standard | Proprietary alloy matrix & reka bentuk ruang| +3550% |
| Ketersediaan Operasi (Planned) | ~92% (termasuk perubahan pelapik) |>96% (with fastchange systems)| +4+ mata peratusan |
| Penggunaan Tenaga Khusus| Varies by design; garis dasar = 100%| Kinematik yang dioptimumkan & VFD control| Pengurangan daripada 812% |
| Tramp Metal Incident Recovery Time| 2472 hours for inspection/repair|90% |
| Ketekalan Throughput (vs. Reka bentuk)| ±15% fluctuation common|< ±5% fluctuation with smart feed control| Significantly more stable output |
5. SPESIFIKASI TEKNIKAL
Julat Kapasiti: Boleh dikonfigurasikan daripada 2,000 ke atas 12,000 Ton metrik sejam (Tph), depending on model selection and ore characteristics.
Primary Crusher Types Available: Heavyduty gyratory crushers (54”75” feed opening) or large jaw crushers.
Keperluan kuasa: Motor pemacu utama dari 300 kW sehingga 800 kw. Total installed plant power varies with ancillary equipment.
Spesifikasi Bahan: Mainframe construction from welded steel plate; liners in highchrome alloy iron; wear surfaces lined with replaceable AR400 steel plates.
Dimensi Fizikal (lebih kurang, Gyratorybased plant): Footprint ~25m L x 15m W x 20m H (excluding feed hopper ramp).
Julat Operasi Persekitaran: Designed for ambient temperatures from 30°C to +45°C; penutup elektrik kalis habuk; IP65 rating on critical components.
6. SENARIO APLIKASI
Large OpenPit Magnetite Mine Expansion
Cabaran: An existing operation needed to double primary crushing capacity but had limited space for expansion within the pit perimeter. Downtime during tiein was also a critical concern.
Penyelesaian: Implementation of a preassembled modular Chinese Iron Ore Crushing Plant on a new bench adjacent to the existing setup. The plant was factorytested before shipment.
Keputusan: The modular approach reduced onsite construction time by 60%. The new plant achieved design throughput of 6,500 TPH within one week of commissioning, with zero impact on existing production during installation.
Pemodenan Loji Pemprosesan Hematit
Cabaran:Aging primary jaw crushers suffered from excessive vibration, frequent bearing failures,and an inability to handle increasingly hard ore lenses,causing constant bottlenecks.
Solution Replacement with a modern gyratorybased Chinese Iron Ore Crushing Plant featuring advanced base frame designand automated lubrication.The installation included upgraded rock breaker stations at the feed tip
Results Unplanned breakdowns at primary stage were eliminated Throughput increased by22 due to superior reduction ratioand consistent feeding Annual maintenance costs decreased by an estimated35
7.PERTIMBANGAN KOMERSIL
Equipment pricing is tiered based on capacityand selected core crusher technology:
Peringkat1(20004000Tph):Based on large jawcrusher technology
Peringkat2(40008000Tph):Based on midrangegyratorycrushers most commonfor major projects
Peringkat3(8000TPH+):Customengineeredgyratorysystems
Ciri Pilihan Termasuk:
On skidmounted lubrication systems
Advanced predictive monitoring packages wireless sensor networks
Extendedwear packagesfor critical chutesand conveyors
Turnkey installation supervisionand commissioning services
Pakej Perkhidmatan Tersedia:
Standard warranty covering partsand laborfor12months
Extended performance agreementscovering total costper toncrushed
Annual inspectionand condition assessmentreports
Financing Options Project financing can be structured through partner institutions including leaseto own arrangementsor milestonebased payment plans alignedwith project development schedules
8.Soalan Lazim
Q What levelof preparationis requiredat my sitebefore installation?
A A level compacted platformwith engineered concrete foundationsis required Detailed civil drawingsare provided earlyin the project cyclefor site preparationto proceedin parallelwith equipment manufacturing
Q How does thisplant ensure compatibilitywith my existing secondarycrushingandscreening circuit?
A Our engineering teamwill reviewyour downstream equipment specificationsand product size requirementsThe discharge openingand conveyor interfaceof theprimary plantare designedto matchyour existing flow sheetensuringa smooth integration
Q Whatisthe expected timelinefrom orderto commissioning?
A For standard configurationslead timesrange from8to14months dependingon scaleand complexityThis includes manufacturing factory testing disassemblyfor shipping ocean freightand re assembly onsite Timelinesare defined clearlyin the project scheduleupon order confirmation
Q Are spare parts readily availablegiven the geographic locationof manufacture?
A Yes Critical wear parts are stockedin regional warehouseson multiple continents Furthermorea digital inventoryof your plant’s specific partswith detailed drawingsis providedto facilitate local machiningif ever requiredin an emergency
Q Can thisplant be automatedto tieintoa centralcontrol room?
A AbsolutelyThe crushingplantis controlledbyits ownPLCwhichis fullycapableof interfacingwith your broaderplant DCSor SCADA systemusing standard industrial protocols(eg Profibus Ethernet/IP)Remote monitoringand controlare standard features