Chinese Gold Mining Equipment Fabricator
1. PEMBUKAAN PAINPOINT DRIVEN
Adakah anda menghadapi kesesakan berterusan dalam litar pemulihan emas anda yang secara langsung memberi kesan kepada keuntungan anda? Common operational challenges with gold mining equipment include inconsistent feed rates leading to process instability, premature wear of critical components in abrasive slurry environments causing unplanned downtime, and inefficient separation resulting in measurable gold losses to tailings. These issues translate into quantifiable costs: hours of lost production during component changeouts, ongoing expenditure on replacement parts, and the permanent loss of recoverable value. How do you stabilize your operation to achieve predictable throughput, extend the service life of highwear items, and maximize recovery rates from every ton of ore processed? The solution lies in specifying equipment engineered specifically for the demanding lifecycle of a gold mining operation.
2. GAMBARAN KESELURUHAN PRODUK
Barisan produk ini merangkumi tugas berat, modular peralatan perlombongan emas designed for the concentration, perpisahan, and recovery of gold from alluvial and hard rock sources. The operational workflow is engineered for integration into existing plants or new installations:
1. Penyediaan Makanan: Scalping or scrubbing modules remove oversized material and clays to ensure optimal downstream processing.
2. Kepekatan Graviti: Dense media separation or centrifugal concentrators isolate highspecificgravity gold particles from gangue material.
3. Perpisahan & Koleksi: Specialized sluices, jig, or shaking tables provide final concentration into a clean heavy mineral fraction.
4. Keselamatan & Pengendalian: Integrated locking mechanisms and streamlined collection points secure the valuable concentrate.
Application scope includes primary ore processing, scavenging from milled product, and tailings reprocessing. Key limitations involve feed particle size compatibility; optimal recovery is achieved within specified size ranges, and extremely fine (<10 mikron) liberated gold may require supplementary chemical processes.
3. CIRI TERAS
Reka Bentuk Bingkai Modular | Asas Teknikal: Bolttogether, hightensile steel construction with standardized interfaces | Faedah Operasi: Enables rapid onsite assembly without specialized welding crews and permits easy future circuit reconfiguration | Kesan ROI: Mengurangkan masa pemasangan sehingga 40%, mengurangkan kos buruh dan mempercepatkan masa untuk pengeluaran.
Sistem Pelapik Tahan Lelasan | Asas Teknikal: Interchangeable liners made from proprietary chromium carbide steel or polyurethane composites | Faedah Operasi: Protects structural components from wear, maintaining critical tolerances for separation efficiency over extended periods | Kesan ROI: Extends liner service life by 23x compared to standard AR steel, mengurangkan kekerapan penukaran bahagian dan kos inventori.
Pemacu Frekuensi Pembolehubah (VFD) Kawalan | Asas Teknikal: Precision electric motor control allowing realtime adjustment of vibration frequency, stroke length, or table speed | Faedah Operasi: Operators can finetune equipment response to varying feed grades and particle sizes without stopping the process | Kesan ROI: Optimizes recovery yield across different ore batches; data medan menunjukkan tipikal 38% improvement in overall recovery efficiency.
LowWater Consumption Circuitry | Asas Teknikal: Recirculating water system design with integrated settling weirs and sumps | Faedah Operasi: Minimizes fresh water makeup requirements and reduces the volume of slurry for tailings management | Kesan ROI: Mengurangkan perolehan air dan kos pam sehingga 60%, a critical advantage in waterscarce regions.
SecurityFocused Access Design | Asas Teknikal: Lockable inspection hatches and concentrate collection points with tamperevident seals | Faedah Operasi: Provides controlled access to valuable concentrates throughout the shift cycle, enhancing security protocols | Kesan ROI: Mitigates risk of valuable material loss, ensuring accountedfor production.
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Piawaian Industri | Gold Mining Equipment Solution | Kelebihan (% penambahbaikan) |
| : | : | : | : |
| Masa Min Antara Kegagalan (Critical Liners) | 750 1,000 jam | 2,200 2,800 jam | +147% |
| Masa Perhimpunan Di Tapak (for a standard module) | 80120 waktu kerja | 4565 waktu kerja | 43% |
| Penggunaan Air setiap Tan Diproses (Recirculating Systems) ~30 m³/tonne ~12 m³/tonne |60% |
| Recovery Efficiency on 100 mesh alluvial feed (in controlled tests) ~92% capture ~9698% capture |+46% mutlak |
5. SPESIFIKASI TEKNIKAL
Kapasiti/Penilaian: Daya pemprosesan bergantung model daripada 50 TPH for pilot/test plants to 400 TPH for largescale alluvial operations.
Keperluan kuasa: Pemacu motor elektrik terdiri daripada 7.5 kW kepada 110 kW setiap modul; plant voltage standards (415V/3/50Hz or 480V/3/60Hz) accommodated.
Spesifikasi Bahan: Struktur utama: Gred ASTM A572 50 keluli. Pakai permukaan: AR400500 steel or proprietary cast chromium carbide alloy. Contact surfaces for corrosion resistance: SS316 or HDPE.
Dimensi Fizikal: Modular units designed for standard shipping container widths; typical module footprint ranges from 4m x 6m to 8m x 12m.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +50°C; dustproof (IP65) komponen elektrik; optional packages available for highhumidity or marine environments.
6. SENARIO APLIKASI
Operasi Placer Alluvial di Afrika Barat
Cabaran: A largescale placer mine experienced significant gold losses in fine (80 mesh) fractions using traditional sluices, alongside high maintenance downtime due to abrasive sand wear on equipment.
Penyelesaian: Implementation of a multistage circuit featuring lowwater consumption scrubbers followed by a series of highG centrifugal concentrators as the core gold mining equipment.
Keputusan: Plant recovery efficiency increased from an estimated 88% ke 95%. Liner replacement intervals extended from every 6 minggu ke setiap 4 bulan. Total water consumption was reduced by over half.
Projek Pemprosesan Semula Tailing Hard Rock
Cabaran: A historical tailings storage facility contained an estimated economic grade of locked fine gold but presented a lowmargin operation requiring exceptionally low operating costs.
Penyelesaian: Deployment of a compact, modular gravity separation plant focused on highthroughput classification and efficient concentration via enhanced shaking tables with VFD control.
Keputusan:The plant achieved a consistent recovery rate of over 85%of liberated gold at a processing cost under $12 setiap tan yang diproses,prompting expansiontoasecondtailings site within18 months.
7.PERTIMBANGAN KOMERSIL
Harga peralatan berperingkat berdasarkan kapasiti dan kerumitan:
• Standard Module Series(50150 Tph):Offers core featuresfor defined applications.Capexfocused entry point
• HighCapacity Series(150400 Tph):Includes advanced VFD controls automated monitoring sensorsand premium liner materials
• Custom Engineered Solutions:Tailored designsfor specific orebodiesor space constrained siteswith pricingon application
Optional featuresinclude remote monitoring telemetry packages automated grease systemsand washdown systemsfor dust control
Service packagesare availablefrom basic commissioningand operator trainingto comprehensive annual maintenance contracts with guaranteed spare parts availability
Financing optionscan be structured through partner institutions including equipment leasing programsor milestonebased payment plansfor project deployments
8.Soalan Lazim
Q:What levelof feed preparationis requiredbefore your gravity concentration equipment?
A:Ideal feed should be screenedto themanufacturer’s specified top sizewith clays broken apartFor hard rock circuits grindingto at least minus20 meshis recommendedfor effective liberationOur team can adviseon necessary upstream preparation
Q How does thisequipment integratewith our existing cyanidationor flotation circuit?
A Our gravity concentration unitsare commonly installedas aprimary recovery method aheadof leach circuitsto capture coarse freegold reducing leaching timeand consumptionThey can alsobe usedas ascavenger after millingto pull out remaining freegold before chemical processes
Q Whatisthe typical delivery lead timeforastandard configuration?
A Forstandard series modelslead timesrange between14and20 weeksfrom order confirmation dependingon current production cyclesCustom solutionsrequire additional engineeringtimewhich willbe detailedin aproposal
Q Are performance guaranteesprovided?
A Yesperformance criteria suchas minimum recovery rateswithin aparticlesize rangeor maximum power consumptionare establishedduringthe sales processbasedon representative ore samplesThese form partofthe commercial agreement
Q What trainingis providedfor our operations team?
A Comprehensive trainingis included covering safe operation routine maintenance troubleshooting proceduresand liner changeout protocolsTraining occurs during commissioningat your sitewith manualsand video resources provided
Q Do you offer spare parts kits?
A We recommendand offerinitial critical spare parts kits tailoredtoyour expected12 monthsof operationThis minimizesdowntime whileyou establish local inventoryKits typically includewear liners screen panels specialized sealsand drive belts