Risalah Mesin Penghancur Batu China
1. PEMBUKAAN PAINPOINT DRIVEN
Kos operasi yang meningkat dan masa henti yang tidak menentu menghakis margin pengeluaran agregat anda? Untuk pengurus loji dan kontraktor kejuruteraan, cabaran teras dalam penghancuran primer selalunya termasuk:
Kos Bahagian Pakai Tinggi: Frequent replacement of manganese jaws or liners under highabrasion conditions creates significant, recurring expenditure.
Masa Henti Tidak Berjadual: Mechanical failures or blockages halt the entire downstream process, menelan belanja beribu-ribu sejam dalam pengeluaran yang hilang.
Penggredan Output Tidak Selaras: Fluctuations in feed material can lead to poor particle size distribution, impacting secondary crusher efficiency and final product quality.
Penggunaan Tenaga Berlebihan: Older or inefficient drive systems draw substantial power without corresponding throughput, directly affecting your costperton metric.
Foundation & Installation Complexity: Berat, rigid structures require extensive civil works, increasing initial project time and capital outlay.
How do you select a primary crusher that directly addresses these pain points with proven engineering, not just promises? The solution requires a machine built for durability, operational simplicity, and measurable return on investment.
2. GAMBARAN KESELURUHAN PRODUK
The {{kata kunci}} adalah tugas berat, singletoggle jaw crusher engineered for the primary crushing of hard, abrasive materials such as granite, basalt, dan bijih besi. It is the first critical stage in mineral processing and aggregate production plants.
Aliran Kerja Operasi:
1. Pengambilan Suapan: Bahan suapan besar (hingga 85% of the feed opening height) dimuatkan ke dalam penyuap grizzly yang bergetar (pilihan) or directly into the crusher’s robust chamber.
2. Tindakan Menghancurkan: The elliptical motion of the singletoggle jaw exerts high pressure on the feed material, breaking it against the fixed jaw plate via compressive force.
3. Pelepasan: Crushed material exits through the closedside setting (CSS), with size precisely determined by the hydraulic CSS adjustment system.
4. Aliran bahan: The discharged product is conveyed to the next stage of screening or secondary crushing.
Skop Permohonan: Ideal for stationary quarry plants, Operasi perlombongan, and largescale construction aggregate production. Best suited for materials with a compressive strength up to 400 MPa.
Batasan: Not designed for recycling mixed demolition waste without prescreening. Requires a consistent feed size distribution to optimize performance and wear life.
3. CIRI TERAS
Ruang Penghancuran Dalam & Kinematik yang dioptimumkan | Asas Teknikal: Increased nip angle and longer crushing stroke | Faedah Operasi: Higher volume reduction per cycle and improved throughput capacity | Kesan ROI: Higher tons processed per operating hour lowers fixed cost allocation
HeavyDuty Welded Frame | Asas Teknikal: Highstrength steel plates with stressrelieved welding | Faedah Operasi: Unmatched structural integrity under maximum load, resisting fatigue over decades | Kesan ROI: Eliminates risk of frame failure, melindungi nilai aset jangka panjang
Sistem Pelarasan Togol Hidraulik | Asas Teknikal: Replaceable hydraulic cylinder for tensioning and adjustment | Faedah Operasi: Enables quick, safe CSS changes from a remote location; provides overload protection by releasing upon uncrushable entry | Kesan ROI: Mengurangkan masa henti pelarasan sehingga 70% versus manual shim systems

Premium Manganese Jaw Plates | Asas Teknikal: Isotropic alloy with optimized tooth profile design | Faedah Operasi: Extended service life under severe abrasion; reversible for dual utilization | Kesan ROI: Reduces costperton for wear parts by up to 30% berdasarkan data lapangan
Sistem Gris Automatik Berpusat | Asas Teknikal: Programmable pump delivering precise grease volume to key bearings | Faedah Operasi: Memastikan pelinciran galas yang optimum tanpa campur tangan manual, menghalang kegagalan dryrun | Kesan ROI: Mitigates risk of catastrophic bearing seizure, a leading cause of extended downtime
LowFriction Spherical Roller Bearings | Asas Teknikal: Largediameter bearings designed for high radial and axial loads | Faedah Operasi: Reduced internal friction lowers operational temperature and energy draw | Kesan ROI: Didokumenkan 515% reduction in power consumption compared to standard designs
Reka Bentuk Komponen Modular | Asas Teknikal: Strategic segmentation of wear and mechanical parts| Faedah Operasi: Simplifies maintenance access; enables replacement of individual sections instead of entire assemblies| Kesan ROI: Lowers spare parts inventory costs and reduces mean time to repair (MTTR)
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Piawaian Industri | {{kata kunci}} Penyelesaian | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Pakai Kehidupan (Batu Abrasive) | ~450,000 tan setiap set (garis dasar)| Up to ~600,000 tons per set| +33% hayat perkhidmatan yang dilanjutkan |
| Masa Pelarasan CSS (Mekanikal kepada CSS)| 6090 minit (shimbased)
5. SPESIFIKASI TEKNIKAL
Julat Model & Kapasiti: Available in sizes from JC5460 to JC8192; throughput daripada 500 MTPH kepada 2,200 MTPH depending on feed material and CSS.
Pembukaan suapan: Ranges from 1400mm x 1200mm (55" x 47") up to 2000mm x 1600mm (79" x 63").
Keperluan kuasa: Motor penghancur utama dari 150 kw (200 Hp) hingga 375 kw (500 Hp). Complete system includes feeder and conveyor drives.
Spesifikasi Bahan: Main frame constructed from STPL70 hightensile steel; jaw plates in Mn18Cr2 or Mn22Cr2 premium manganese steel.
Dimensi Fizikal & Berat: Approximate weights from 65,000 kg ke 180,000 kg; detailed foundation drawings are provided for each model.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +45°C (4°F hingga +113°F). Dust sealing kits are available for arid environments.
6. SENARIO APLIKASI
Operasi Kuari Granit
Challenge A quarry in Southeast Asia faced excessive downtime due to premature jaw plate wear on their existing primary crusher processing highly abrasive granite. Manual CSS adjustments were timeconsuming and hazardous.
Solution Implementation of a JC6486 {{kata kunci}} with premium Mn22Cr2 jaw plates and a fully automated greasing system.
Results Wear part life increased by approximately 40%. Combined with hydraulic CSS adjustment total plant availability improved by an estimated 18%, yielding an increase in annual production volume sufficient for an ROI on the equipment within 14 bulan.
Loji Pemprosesan Bijih Besi
Challenge An iron ore mine required higher primary throughput but was constrained by grid power availability at their remote site. Their legacy crusher was an energyintensive unit causing peak load penalties.
Solution A JC5475 {{kata kunci}} was selected specifically for its lowfriction bearing design and optimized kinematics for hard rock crushing.
Results Plant engineers recorded a sustained reduction in specific energy consumption of approximately 11%. This allowed the increased throughput target to be met without exceeding existing power infrastructure limits avoiding a costly substation upgrade.
7. PERTIMBANGAN KOMERSIL
The {{kata kunci}} is offered in three primary configuration tiers:
1. Base Machine Tier Includes core crusher with standard manganese jaws manual greasing points basic guarding
2 Performance Tier Most common selection Adds hydraulic toggle adjustment centralized autogreasing dust sealing package upgraded motor starters
3 Plant Integration Tier Includes Performance Tier features plus integrated motor control panel PLCbased monitoring sensors preinstalled chutes
Optional Features Grizzly feeder module modular discharge conveyor belt scale integration advanced condition monitoring telemetry packages extended warranty plans
Service Packages Comprehensive offerings include scheduled preventive maintenance programs onsite technical training flyin field service support guaranteed spare parts delivery timelines
Financing Options Flexible commercial structures are available including straight capital purchase finance lease agreements or productionbased rental contracts tailored to project cash flow requirements
8 Soalan Lazim
Q What is the lead time for delivery of a {{kata kunci}}
A Standard model lead times range from [IndustryStandard Timeframe] exworks Custom configurations may require additional engineering time Detailed schedules are provided upon project confirmation
Q Can this crusher replace our existing primary unit without major foundation modifications
A Our engineering team provides a full foundation compatibility analysis While our modular design aims for adaptability some applications may require civil work modifications due differing load dynamics We supply all necessary interface drawings early in the process
Q How does your company support installation commissioning
A We offer supervised installation where our engineers oversee critical phases such as alignment commissioning We also provide comprehensive operator maintenance manuals digital training modules ensuring your team achieves optimal operation quickly
Q What is your policy regarding spare parts availability
A We maintain strategic global warehouse stockholds Critical wear mechanical components are guaranteed available shipment within [IndustryStandard Timeframe] under our service agreements reducing your operational risk profile significantly compared sourcing generic parts locally which may compromise performance warranty coverage will be voided if nongenuine parts are used that cause damage this protects your investment longterm reliability metrics documented across multiple sites show consistent adherence these standards leading higher overall equipment effectiveness OEE scores customers utilizing genuine parts packages experience fewer unplanned stoppages translating lower total cost ownership TCO over typical fiveyear period independent audits confirm these findings regularly published industry case studies detail specific outcomes various geological conditions worldwide providing transparent evidencebased performance data potential buyers can review prior making procurement decision always consult directly with our technical sales team regarding specific application requirements they will provide tailored recommendation based historical data similar installations


