Pengedar Kilang Bola Bertauliah
1. PEMBUKAAN PAINPOINT DRIVEN
Are you facing persistent challenges in your grinding circuit that directly impact throughput, belanjawan penyelenggaraan, and product consistency? Common operational hurdles include excessive liner wear leading to frequent, costly shutdowns for replacement. Uncontrolled particle size distribution can compromise downstream recovery rates and final product quality. Rising energy consumption per ton of processed material squeezes operating margins. Vibration and gear issues often signal underlying mechanical failures, resulting in unplanned downtime and lost production.
How can you achieve a more reliable grind with predictable maintenance intervals? Is it possible to improve energy efficiency while maintaining or increasing throughput? The solution lies in selecting a ball mill engineered not just for operation, tetapi untuk jumlah kos pemilikan dan kestabilan proses.
2. GAMBARAN KESELURUHAN PRODUK
This product description details our range of certified industrial ball mills for wet and dry grinding applications in mineral processing, Pengeluaran simen, dan mineral perindustrian. The operational workflow is centered on a robust rotating cylinder containing grinding media (bola). Key steps include: 1) Bahan suapan diperkenalkan melalui trunnion atau salur masuk persisian. 2) The cylinder rotates, lifting and cascading the grinding media to impart impact and attrition forces on the material. 3) Ground product is discharged via peripheral slots, a grate, or through the opposite trunnion.
These ball mills are applied for fine grinding ores, arang batu, pigmen, dan bahan keras lain. They are less suited for ultrafine grinding below 20 microns where specialized equipment like stirred media mills may be more efficient, or for processing highly abrasive materials without specific liner design considerations.
3. CIRI TERAS
Sistem Pelapik Modular | Asas Teknikal: Highchrome alloy steel segments with mechanical locking | Faedah Operasi: Mengurangkan masa pertukaran pelapik sehingga 40% compared to welded plates. Allows for targeted wear part inventory. | Kesan ROI: Lower labor costs during maintenance shutdowns and reduced production loss.
Precision Gear Drive Alignment | Asas Teknikal: Laseraligned girth gear and pinion set during assembly with proprietary mounting protocol | Faedah Operasi: Minimizes vibration and abnormal gear wear, extending drive train service life by an estimated 30%. | Kesan ROI: Avoids costly gear replacements and associated downtime; reduces ongoing lubrication consumption.
Geometri Bilik Dioptimumkan | Asas Teknikal: Dinamik Bendalir Pengiraan (Cfd) modeling of material flow and grinding media kinetics | Faedah Operasi: Promotes efficient cascading action, reducing overgrinding and improving particle size distribution consistency. | Kesan ROI: Higher quality feed for downstream processes (mis., pengapungan) can improve recovery rates; mengurangkan penggunaan tenaga tertentu (kWj/tan).
Pad Pemantauan Keadaan Bersepadu | Asas Teknikal: Embedded sensor mounts at bearing and gear locations compatible with standard vibration/temperature systems | Faedah Operasi: Enables predictive maintenance by facilitating realtime health data collection without adhoc installations. | Kesan ROI: Mengubah penyelenggaraan daripada reaktif kepada terancang, mencegah kegagalan bencana dan memanjangkan masa min antara pembaikan (MTBR).
DualWave Shell Liners | Asas Teknikal: Liner profile designed to optimize ball charge trajectory at varying mill speeds | Faedah Operasi: Enhances grinding efficiency across a wider range of operational speeds and feed sizes. | Kesan ROI: Provides operational flexibility to adjust to varying ore hardness without sacrificing grinding performance.
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Piawaian Industri | Penyelesaian Kilang Bola Bertauliah | Kelebihan (% penambahbaikan) |
| : | : | : | : |
| Hayat Perkhidmatan Pelapik (Bijih Pelelas) | ~46 months | 810 bulan | +6070% |
| Penggunaan Tenaga Khusus| ~1518 kWh/ton| 1315 kWj/tan| 13% ke 17% |
| Masa Min Antara Kegagalan (Drive Train)| ~12,000 jam| 16,000+ jam| +33% |
| Masa Henti Penyelenggaraan Terancang (tahunan)| 810 hari| 57 hari| 30% ke 40% |
Varies based on material grindability index.
5. SPESIFIKASI TEKNIKAL
Julat Kapasiti: From pilotscale 0.5m x 1m models to productionscale mills exceeding 5m diameter x 10m length.
Keperluan kuasa: Pilihan motor dari 100 kW hingga lebih 10 MW; designed for synchronous or asynchronous motors with compatible gearbox ratios.
Spesifikasi Bahan: Cangkang yang dibina daripada plat keluli karbon tegangan tinggi; trunnion adalah keluli palsu; standard liners are highchrome cast iron (NiHard), with ceramic composite options available.
Dimensi Fizikal: Customengineered setiap projek; semua reka bentuk mengambil kira beban asas, service clearances, dan akses kren atas kepala.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +50°C; bearing lubrication systems include heating/cooling circuits as required.
6. SENARIO APLIKASI
Pengembangan Penumpu Kuprum | Cabaran: An existing plant needed to increase throughput by 25% but had space constraints limiting new mill footprint. The existing ball mill was a bottleneck with high vibration issues. Penyelesaian: Replacement with a certified ball mill of identical footprint but featuring optimized chamber geometry and a precisionaligned gear drive. Keputusan: A 28% increase in throughput was achieved within the same footprint. Vibration levels dropped by 70%, allowing continuous operation at higher load. Penggunaan tenaga khusus dipertingkatkan oleh 11%.
Pengeluar Mineral Perindustrian | Cabaran: Excessive liner wear (5month life) from highly abrasive material caused frequent production stoppages and high consumable costs. Product fineness was inconsistent. Penyelesaian: Implementation of a certified ball mill with dualwave shell liners made from a proprietary abrasionresistant alloy composite. Keputusan: Hayat perkhidmatan pelapik dilanjutkan kepada lebih 9 bulan. Particle size distribution standard deviation tightened by 22%, improving product grade consistency for customers.
7. PERTIMBANGAN KOMERSIL
Equipment pricing is tiered based on mill size, kuasa memandu, dan spesifikasi bahan (Kewajipan Standard / Tugas Berat / Severe Abrasion Package). Ciri pilihan termasuk pakej instrumentasi lanjutan (pengesan bunyi kilang, pemantau suhu galas), sistem pelinciran automatik, and custom discharge configurations.
Service packages range from basic commissioning support to comprehensive multiyear maintenance agreements including scheduled inspections, OEM parts supply at fixed rates, and remote monitoring assistance.
Pilihan pembiayaan boleh didapati melalui institusi rakan kongsi, including equipment leasing structures that preserve capital or plant upgrade loans tailored to mining sector cash flow cycles.
8.Soalan Lazim
S1: Adakah kilang bola anda serasi dengan litar pengelasan sedia ada kami (siklon/hidrosiklon)?
A1: ya. Our engineering team will review your existing circuit parameters—including pump specs, cyclone cluster size, and desired circulating load—to ensure the new mill is correctly sized and configured for seamless integration into your current process flowsheet.
S2: Apakah kesan yang dijangkakan pada keseluruhan cabutan kuasa loji kami?
A2: While the mill motor itself is a significant load field data shows the efficiency gains in grinding often lead to a net reduction in specific energy consumption (kWj setiap tan). A detailed prepurchase power analysis will be provided based on your feed material characteristics.
S3: How long does installation typically take?
A3: For a direct replacement of an equivalentsized unit with prepared foundations installation typically requires between two to four weeks including mechanical erection alignment commissioning This timeframe can vary based on sitespecific conditions
S4 Apakah inventori alat ganti yang anda cadangkan kami mengadakan di tapak?
A4 We provide a critical spares list tailored to your planned maintenance schedule Initially this typically includes a set of shell liners select bearing seals girth gear bolts This minimizes risk while optimizing your working capital tied up in inventory
S5 Adakah anda menawarkan jaminan prestasi?
A5 Yes We provide guaranteed performance metrics based on agreedupon test conditions These typically cover throughput capacity final product particle size P80and specific energy consumption Guarantees are formalized in the commercial contract
Q6 Can the mill be automated for variable speed control?
A6 All our mills are compatible with variable frequency drives VFDs This allows operators to adjust mill speed as ore characteristics change optimizing grinding media trajectoryand efficiency which is particularly beneficial for SAG mill discharge processing
Q7 What is the lead time from order placementto delivery?
A7 Lead times vary by complexityand current manufacturing capacity For standard designs lead times generally range from six tonine monthsfor complete assemblies including fabrication assemblyand testing Expedited options may be availablefor critical projects