Syarikat Perdagangan Peralatan Loji Simen Harga Kilang
1. PEMBUKAAN PAINPOINT DRIVEN
Are you facing persistent operational bottlenecks that erode your plant's profitability? For commercial buyers and plant managers, sourcing reliable cement plant equipment often involves navigating a minefield of hidden costs and performance risks. Cabaran biasa termasuk:
Masa Henti Tidak Berjadual: Equipment failure in critical processes like kiln feeding or clinker grinding can halt production, menelan belanja puluhan ribu sejam dalam kehilangan output.
Kos Penyelenggaraan Tinggi: Wearprone components in abrasive material handling lead to frequent part replacements and excessive labor hours for upkeep.
Ketidakcekapan Tenaga: Outdated or poorly optimized machinery, such as inefficient fans or crushers, inflates power consumption—a primary cost driver in cement production.
Kualiti Produk Tidak Konsisten: Unreliable equipment can cause fluctuations in raw mix homogeneity, kiln temperature stability, or final cement fineness, compromising product specifications.
How do you secure heavy machinery that delivers not just immediate function, but longterm operational stability and a verifiable return on investment? The solution lies in precisionengineered equipment designed for the specific rigors of cement manufacturing.
2. GAMBARAN KESELURUHAN PRODUK
This product line encompasses the core heavy machinery required for modern dryprocess cement production. We supply individual units and integrated systems for key stages, from raw material preparation to clinker grinding. The operational workflow facilitated by this equipment typically follows these key steps:
1. Menghancurkan & PraHomogenisasi: Primary and secondary crushers reduce quarry rock, followed by stacker/reclaimer systems to blend raw materials.
2. Pengilangan Mentah & Homogenisasi: Kilang penggelek menegak atau kilang bebola mengisar adunan mentah hingga menjadi serbuk halus, which is then homogenized in silos.
3. 'Pemprosesan piro: Preheater towers and rotary kilns calcine and sinter the raw meal into clinker at temperatures exceeding 1400°C.
4. Penyejukan Klinker & Selesai Mengisar: Grate coolers rapidly cool the clinker, which is then ground with gypsum in cement mills to produce the final product.
Skop Permohonan: This equipment is engineered for largescale Portland and blended cement production plants. Key limitations include requirement for significant capital investment, need for skilled personnel for operation and maintenance, and suitability primarily for new plant construction or major capacity upgrades rather than minor retrofits.
3. CIRI TERAS
HighChromium Alloy Wear Parts | Asas Teknikal: Metallurgical design for abrasion resistance | Faedah Operasi: Extended service life in highwear zones like crusher hammers, mill liners, and fan blades | Kesan ROI: Reduces part replacement frequency by up to 60%, lowering inventory costs and maintenance downtime.
Integrated Gearbox & Sistem pemacu | Asas Teknikal: Finite element analysisoptimized gearing for hightorque loads | Faedah Operasi: Smooth power transmission to rotary kilns and large ball mills with minimal vibration | Kesan ROI: Enhances drive train longevity; data lapangan menunjukkan a 30% reduction in transmissionrelated failures.
Advanced Burner Management System | Asas Teknikal: Precision fuelair ratio control with multichannel capability | Faedah Operasi: Stable flame shape and optimal temperature profile in the rotary kiln calcining zone | Kesan ROI: Improves fuel efficiency by 35% and contributes to consistent clinker quality.

Modular Design Philosophy | Asas Teknikal: Subassembly fabrication with standardized interfaces | Faedah Operasi: Faster onsite installation and easier future upgrades or component replacements | Kesan ROI: Can reduce construction timeline by up to 15%, mempercepatkan masa untuk pengeluaran.
Pelabuhan Pemantauan Keadaan & Platform | Asas Teknikal: Preinstalled sensor mounts and data logging interfaces | Faedah Operasi: Enables predictive maintenance programs by tracking vibration, suhu, and pressure trends | Kesan ROI: Mengubah penyelenggaraan daripada reaktif kepada terancang, preventing catastrophic failures and optimizing part utilization.
Optimized Aerodynamic Housing (Peminat & Separators) | Asas Teknikal: Dinamik Bendalir Pengiraan (Cfd)modeled airflows | Faedah Operasi: Reduced pressure drop and increased efficiency in ID/FD fans and cyclone separators | Kesan ROI: Directly lowers auxiliary power consumption per ton of output.

4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Penanda Aras Piawaian Industri | Penyelesaian Peralatan Loji Simen Kami | Kelebihan Berdokumen |
| : | : | : | : |
| Kiln Drive Availability | 9294% ketersediaan tahunan >95% ketersediaan tahunan >3% penambahbaikan |
| Penggunaan Kuasa Khusus (Selesai Kilang) ~3842 kWh/t 1,800 waktu operasi +50% penambahbaikan |
| Kecekapan Terma (Rotary Kiln System) ~5055% thermal efficiency Targets >57% thermal efficiency +4% absolute improvement |
5. SPESIFIKASI TEKNIKAL
Julat Kapasiti: Equipment configured for plant capacities from 1,000 TPD berakhir 10,000 TPD.
Keperluan kuasa: Penarafan motor daripada 150 kw (for large pumps/fans) hingga 6+ MW (for main kiln drives & Kilang bola). Voltage tailored to regional grid standards (mis., 6.6kV, 11kV).
Spesifikasi Bahan: Primary structural components use S355JR steel; highstress parts employ forged alloy steel; abrasionresistant liners use NiHard or CrMo alloys with hardness exceeding 500 HB.
Dimensi Fizikal: Significant variance by machine type. Example Rotary Kiln (2500 TPD): ~60m length x ~4m diameter.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +50°C; dust ingress protection to IP65 standards for external motors; seismic design compliance available per zone.
6. SENARIO APLIKASI
Projek Perluasan Kapasiti Loji
Challenge A producer aimed to increase clinker output by 40% without a proportional increase in footprint or specific energy consumption.
Solution Supply of a highefficiency sixstage preheater tower with an inline calciner paired with an upgraded rotary kiln drive system.
Results Project data confirmed a specific heat consumption of less than 700 kcal/kg clinker while achieving the targeted throughput increase within the existing building envelope.
Modernization of Raw Material Handling
Challenge Chronic downtime due to abrasive limestone causing rapid wear on conveyor transfer points and crusher components.
Solution Implementation of primary jaw crushers with redesigned crushing chambers and replacement of standard conveyor chutes with ceramiclined alternatives at all transfer points.
Results Wearpart lifecycle extended by over two times; conveyor system availability increased from approximately 85% ke atas 97%, eliminating a major bottleneck.
7. PERTIMBANGAN KOMERSIL
Our pricing structure reflects engineering quality at competitive factorydirect rates:
Peringkat Standard: Core equipment units meeting all essential technical specifications for reliable operation.
Peringkat Prestasi: Standard units enhanced with premium features such as advanced control system integration packages or upgraded material specifications for extreme conditions.
Ciri Pilihan & Pakej: Customizable options include comprehensive condition monitoring suites extended warranty packages covering major drives auxiliary equipment skidmounted assemblies
Service Packages Postinstallation support plans are available including scheduled inspection programs remote technical support training packages
Financing Options We work with international export credit agencies project finance specialists offer flexible payment terms including milestonebased progress payments
Soalan Lazim
Q1 Are your machines compatible with our existing plant control system?
A1 Our standard control interface is designed per IEC standards ensuring compatibility most modern Distributed Control Systems DCS We provide detailed communication protocols Profibus Modbus during engineering review
Q2 What is typical lead time delivery?
A2 Lead times vary significantly based on equipment complexity current manufacturing load For major items like rotary kilns mills standard lead time ranges months Detailed schedule provided upon project confirmation
Q3 How do you ensure quality before shipment?
A3 We follow staged inspection protocol Factory Acceptance Testing FAT Critical components undergo nondestructive testing NDT assemblies undergo full functional testing under load when possible Comprehensive documentation provided
Q4 What level technical support included?
A4 Our commercial terms include supervision installation commissioning period Optional multiyear technical support maintenance agreements available provide ongoing access engineering expertise spare parts logistics
Q5 Can you supply single machines complete turnkey plants?
A5 Yes We operate as both equipment supplier engineering partner can scope supply individual replacement units provide process design full EPC services new production lines based client requirements
Q6 How handle spare parts logistics after sale?
A6 We maintain recommended inventory list critical spares offer consignment stocking arrangements key locations ensure parts availability minimize delivery times unplanned stoppages
Q7 Do your designs meet international environmental emission standards?
A7 Our core pyroprocessing dust collection designed meet stringent international standards including EU BREF guidelines Specific emission guarantees provided based selected ancillary equipment bag filters scrubbers