Katalog Pengeluar Peralatan Loji Simen

Penerangan ringkas:

1. PAINPOINT DRIVEN OPENING Managing the final stage of clinker cooling presents persistent operational challenges that directly impact plant profitability. Inefficient cooling leads to hightemperature clinker entering the conveyor system, accelerating belt wear and creating safety hazards for personnel. Excessive fan power consumption drives up operational costs, while inconsistent quenching results in poor cement quality…


Perincian produk

Tag produk

1. PEMBUKAAN PAINPOINT DRIVEN

Managing the final stage of clinker cooling presents persistent operational challenges that directly impact plant profitability. Inefficient cooling leads to hightemperature clinker entering the conveyor system, accelerating belt wear and creating safety hazards for personnel. Excessive fan power consumption drives up operational costs, while inconsistent quenching results in poor cement quality and potential mill inefficiencies. Unplanned maintenance due to refractory damage or mechanical failure in the cooler causes costly kiln downtime.

Adakah anda menghadapi peningkatan kos tenaga bagi setiap tan klinker? Is your maintenance team constantly addressing downstream equipment damage from hot clinker? Are you achieving optimal cement quality and mill performance from your cooled clinker? A highperformance penyejuk parut is engineered to address these exact issues.

2. GAMBARAN KESELURUHAN PRODUK

The penyejuk parut salingan is a critical heat recovery and quenching machine installed at the kiln discharge. Its primary function is to rapidly reduce clinker temperature from approximately 1200°C to below 100°C for safe handling and grinding, while recovering thermal energy for process optimization.

Aliran Kerja Operasi:
1. Pengedaran: Hot clinker from the kiln is evenly distributed across the full width of the stationary inlet grate.
2. Pengangkutan & Pelindapkejutan: Reciprocating grates move the clinker bed toward the discharge end while controlled volumes of ambient air are forced upward through the bed.
3. Pemulihan Haba: Hightemperature exhaust air (lebih kurang. 300400°C) is directed to the kiln or precalciner as secondary/tertiary air.
4. Menyejukkan & Pelepasan: Further cooling with ambient air occurs in subsequent compartments before clinker is discharged at a stable, low temperature.
5. Pengendalian Habuk: Fines are collected via drag chain conveyors beneath the grate.

Skop Permohonan & Batasan:
Peralatan ini direka untuk loji simen proses kering dengan tanur berputar. Optimal performance requires consistent clinker granulometry and controlled kiln feed chemistry. It is not suitable for wetprocess plants or for cooling materials with significantly different thermal or physical properties than cement clinker.

3. CIRI TERAS

Grate Plate Design | Asas Teknikal: Highchrome, alloyed castings with optimized venting geometry | Faedah Operasi: Rintangan luar biasa terhadap kejutan haba dan lelasan, ensuring stable airflow distribution and extended service life | Kesan ROI: Mengurangkan kos alat ganti sehingga 30% and minimizes downtime for plate changes

Modular Compartmentalization | Asas Teknikal: Independently controlled air chambers with dedicated fans and dampers | Faedah Operasi: Allows precise air volume adjustment across each cooling zone for optimal heat transfer based on realtime bed conditions | Kesan ROI: Meningkatkan kecekapan pemulihan haba dengan 510%, directly reducing kiln fuel consumption

Advanced Drive System | Asas Teknikal: Hydraulic or electromechanical drives with frequency control and load monitoring | Faedah Operasi: Memberi licin, adjustable grate movement, prevents bed disturbance ("snowplowing"), and protects against overloads | Kesan ROI: Enhances operational stability, mengurangkan kegagalan tekanan mekanikal, dan mengurangkan penggunaan kuasa tertentu

Retractable Air Tightness Seals | Asas Teknikal: Springloaded sealing strips that automatically adjust to wear on moving grates | Faedah Operasi: Maintains highpressure sealing between moving and stationary parts, minimizing air leakage | Kesan ROI: Improves fan efficiency, reducing electrical power waste by an estimated 815%

Antara Muka Kawalan Proses Bersepadu | Asas Teknikal: Protokol komunikasi piawai (mis., OPC UA) linking cooler sensors to plant DCS | Faedah Operasi: Enables centralized monitoring of temperatures, tekanan, and drive loads for predictive maintenance scheduling | Kesan ROI: Facilitates proactive interventions, preventing unplanned stoppages that can cost over $50k per day in lost production

4. KELEBIHAN KOMPETITIF

| Metrik Prestasi | Piawaian Industri | Penyelesaian Penyejuk Parut Kami | Kelebihan (% penambahbaikan) |
| : | : | : | : |
| Suhu Keluaran Klinker | ~120°C + Ambien | < 100°C + Ambien | Hingga 25% lebih rendah |
| Kecekapan Pemulihan Haba (Suhu Udara Sekunder.)| ~900 1000°C| 1050 1150°C| ~1015% higher |
| Penggunaan Kuasa Khusus (kWj/tclinker) | 6.5 8.5 kWj/t| 5.0 6.0 kWj/t| ~2025% pengurangan |
| Hayat Perkhidmatan Plat Parut (in abrasive zones) | 1218 bulan| 2430 bulan| ~80100% longer |
| Ketersediaan Operasi (tidak termasuk perhentian yang dirancang) | 96% |>4 mata peratusan |Katalog Pengeluar Peralatan Loji Simen

5. SPESIFIKASI TEKNIKAL

Julat Kapasiti: Boleh dikonfigurasikan daripada 1,500 ke 12,000 tan sehari (TPD) daripada klinker.
Keperluan kuasa: Jumlah kuasa kipas yang dipasang berbeza mengikut kapasiti; mis., a 5,000 Unit TPD memerlukan lebih kurang 8001000 kW jumlah beban bersambung.
Spesifikasi Bahan: Grate plates cast from GX40CrNiSi275 or equivalent highchrome alloy; side liners in wearresistant steel; housing in carbon steel with internal refractory lining in highheat zones.
Dimensi Fizikal: Length scales with capacity; a standard module width is ~2.8m. A midrange unit may be ~25m L x ~6m W x ~8m H.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +45°C; dust concentration in cooling air up to <50 g/Nm³.

6. SENARIO APLIKASI

Cabaran Peningkatan Kapasiti Loji

A plant aimed to increase kiln output by 20% but was constrained by an existing cooler causing bottlenecks and high temperatures.

Modernization of Legacy Cooler

An older planetary cooler suffered from frequent breakdowns, pemulihan haba yang lemah (<850°C secondary air), and inconsistent final clinker temperature.

Keputusan

The new modular grate cooler installation matched increased throughput while lowering final clinker temperature by over °40C compared to previous peaks.

Keputusan

The retrofit included new grate modules, highefficiency fans, and upgraded controls within the existing footprint.

Keputusan

Secondary air temperature increased consistently above °1000C improving specific fuel consumption by .9%. Kos penyelenggaraan menurun %60 tahun ke tahun.

7 PERTIMBANGAN KOMERSIL

Pricing for a complete penyejuk parut system is projectspecific based on required capacity customization site conditions ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors ancillaries like dust collectors .Katalog Pengeluar Peralatan Loji Simen

Peringkat Harga: Budgetary ranges are typically categorized by capacity Small ( TPD ) .

Ciri Pilihan: Upgraded instrumentation packages advanced refractory designs special alloys for highly corrosive feedstocks redundant drive systems .

Pakej Perkhidmatan: Threetiered offerings are available:
1 Basic commissioning spares .
2 Comprehensive annual inspection vibration analysis wear part monitoring .
3 Fullservice contract including performance guarantees preventive maintenance parts supply .

Pilihan Pembiayaan: Equipment financing operating leases projectbased leasing structures are available subject to credit approval often structured over a year term aligned with projected savings .

8 Soalan Lazim

What level of modification is required to integrate this cooler with our existing kiln discharge?
Integration engineering includes detailed interface design for the kiln hood transition area foundation modifications if necessary ductwork routing Our team conducts full site surveys prior proposal

How does this equipment handle variations in clinker size or "sungai merah" syarat?
The compartmentalized airflow system allows operators increase pressure specific zones counteract red channeling The robust grate design withstands thermal cycling while maintaining bed distribution

Can we expect an immediate reduction electrical consumption after installation?
Field data shows immediate reduction specific fan power due higher efficiency fans reduced leakage Longterm savings accumulate through lower maintenance reduced downstream equipment wear

What typical warranty period what does cover?
Standard warranty covers manufacturing defects materials workmanship key components years Wear parts plates seals have separate prorated warranty terms Extended warranties available purchase

How long does installation commissioning typically take major replacement project?
For greenfield project schedule integrated into overall plant construction brownfield replacement typical outage window weeks including demolition new foundation work erection commissioning Critical path planning minimizes total kiln downtime

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda