Diskaun Syarikat Peralatan Loji Simen
1. PEMBUKAAN PAINPOINT DRIVEN
Adakah anda menguruskan kesesakan berterusan dalam barisan pengeluaran simen anda yang secara langsung memberi kesan kepada daya pengeluaran dan keuntungan? Untuk pengurus loji dan kontraktor kejuruteraan, the challenges associated with clinker cooling often manifest as costly, recurring issues. Adakah anda mengalami:
Penggunaan Tenaga Berlebihan: Inefficient coolers waste recovered heat, forcing kilns and preheaters to compensate, significantly increasing fuel costs.
Unpredictable Clinker Quality: Inconsistent cooling rates lead to variable clinker reactivity, compromising final cement strength and causing product variability.
High Maintenance Downtime: Traditional grate systems with mechanical complexity require frequent stoppages for grate plate replacement and drive system repairs.
Environmental Control Difficulties: Poor air distribution results in higherthannecessary secondary air temperatures or excessive dust emissions, challenging compliance.
Limited Capacity Flexibility: Aging cooler technology cannot adapt to changes in kiln output or clinker characteristics without sacrificing efficiency.
How do you select a clinker cooler that delivers operational stability, maximizes heat recovery, and provides a measurable return on investment?
2. GAMBARAN KESELURUHAN PRODUK
The {{kata kunci}} is a highefficiency, reciprocating grate cooler engineered for the final stage of clinker production. It is designed to rapidly quench and stabilize cement clinker exiting the rotary kiln while optimizing thermal energy recovery. The operational workflow is defined by controlled, sequential steps:
1. Controlled Quenching: Hot clinker (up to 1400°C) is evenly distributed across the grate for an initial rapid temperature reduction.
2. Stratified Airflow: Highpressure fans deliver cooling air perpendicularly through the moving clinker bed in specific zones, ensuring efficient heat transfer.
3. Conditioned Transport: Reciprocating grates convey the material while continuously turning and mixing it for uniform exposure to cooling air.
4. Heat Recirculation: Hightemperature air from the hot zone is directed back to the kiln as secondary combustion air, improving kiln efficiency.
5. Final Cooling & Pelepasan: Clinker is cooled to a safe handling temperature (typically below 100°C) before discharge to the conveyor system.
Skop Permohonan & Batasan: This equipment is core to all integrated cement plants with rotary kilns. Optimal performance requires consistent clinker granulometry; performance may be suboptimal with excessive fines or extreme variations in particle size distribution without specific grate adaptations.
3. CIRI TERAS
Modular Grate Plate System | Asas Teknikal: Advanced cast alloy design with optimized orifice geometry | Faedah Operasi: Reduces mechanical stress points and wear, memanjangkan hayat perkhidmatan sehingga 40% compared to standard plates | Kesan ROI: Lowers spare parts inventory costs and reduces planned maintenance downtime by approximately 15%.
Adaptive Hydraulic Drive | Asas Teknikal: Kawalan injap berkadar dengan gelung maklum balas tekanan | Faedah Operasi: Provides infinitely variable stroke speed and frequency to match exact kiln output and clinker conditions | Kesan ROI: Improves fuel efficiency through stable secondary air temperature, yielding documented savings of 24% on kiln fuel consumption.
Zoned Airflow Management | Asas Teknikal: Independently controlled fan groups with static pressure monitoring per compartment | Faedah Operasi: Enables precise cooling profiles for consistent final clinker temperature and quality | Kesan ROI: Minimizes power consumption of cooling fans and improves product uniformity.
Reinforced Sidewall Design | Asas Teknikal: Doubleskin construction with internal refractory lining and forced air cooling channels | Faedah Operasi: Eliminates thermal deformation and redriver formation, protecting structural integrity | Kesan ROI: Avoids unplanned shutdowns for sidewall repair and extends campaign life.
Integrated Process Control Interface | Asas Teknikal: Standardized communication protocols (mis., OPC UA) for PLC/DCS integration | Faedah Operasi: Allows operators to monitor key parameters like grate load, air pressures, and temperatures centrally | Kesan ROI: Facilitates predictive maintenance scheduling and optimizes overall plant thermal efficiency.
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Penanda Aras Piawaian Industri | {{kata kunci}} Solution Documented Performance | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Heat Recovery Efficiency (Secondary Air Temp.)| ~1000°C 1050°C at cooler outlet| Consistent 1150°C+ at cooler outlet| +10% ke +15% |
| Clinker Exit Temperature (Ambient + ΔT)| Biasanya <65°C above ambient| Secara konsisten 96% availability consistently demonstrated| >2 peningkatan mata peratusan |
5. SPESIFIKASI TEKNIKAL
Julat Kapasiti: Boleh dikonfigurasikan daripada 2,000 TPD berakhir 12,000 TPD of clinker.
Keperluan kuasa: Total connected fan motor power scaled per capacity; mis., for a 5,000 unit TPD: ~750900 kW total installed power.
Spesifikasi Bahan:
Grate Plates & Side Castings: Highchrome alloy cast iron (2530% Cr).
Grate Frame & Base Structure: Keluli karbon tugas berat (S355JR).
Lapisan Refraktori: Insulating castables in precast shapes for sidewalls.
Sistem Pengedap: Multilayer labyrinth seals with wearresistant alloys.
Dimensi Fizikal (Example for 5k TPD): Overall length ~28m; width ~6m; height from foundation ~8m.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +50°C; dustloaded air handling compliant with emission limits below <50 mg/Nm³ when coupled with standard dust collection.
6. SENARIO APLIKASI
Plant Capacity Upgrade Project
Challenge A midsized plant required a capacity increase from 3,200 TPD ke 4,200 TPD but was constrained by an outdated cooler causing bottlenecks and high maintenance costs every eight months.
Solution The existing cooler was replaced with a modular {{kata kunci}} designed for future expansion up to 5k TPD.
Results The retrofit achieved full design capacity within one month of commissioning. Secondary air temperature increased by over 120°C, contributing directly to a measured annual fuel saving of €280k ($300k). Maintenance intervals extended beyond two years.
Consistency Improvement Initiative
Challenge A producer faced inconsistent cement strength grades linked directly to variable final clinker temperatures ranging from 150°C due poor airflow control.
Solution Installation of a new {{kata kunci}} featuring advanced zoned airflow management controls was implemented during an annual shutdown.
Results Final cliker temperature stabilized at <65±10°C within three weeks of operation.The standard deviation of critical cement strength at day improved by over , reducing product quality claims significantly
7 PERTIMBANGAN KOMERSIL
Equipment pricing tiers are structured based on daily capacity requirements:
Tier Basic Configuration includes core cooler structure drive system basic instrumentation Tier Advanced Configuration adds full zonal airflow control advanced process instrumentation predictive maintenance sensor kits Tier Custom Configuration includes special materials exotic alloys fully redundant drive systems
Ciri Pilihan:
Highefficiency fans with VFDs
Comprehensive condition monitoring package
Spare parts starter kit including full set of grate plates
Pakej Perkhidmatan:
Standard warranty covering parts labor
Extended performance guarantee including availability metrics
Annual inspection maintenance contracts
Pilihan Pembiayaan:
Capital purchase direct sale
Leasing arrangements through partners
Performancebased contracting models where savings help offset payments
8 Soalan Lazim
What are the space requirements compared my existing grate cooler?
The footprint typically similar older designs but detailed layout review required confirm compatibility foundation loads ducting connections can be adapted minimize civil work
How does this equipment integrate my existing plant DCS?
It comes standard PLC communicates via industrystandard protocols OPC UA Modbus TCP Integration support provided ensure seamless data flow your control room
Apakah garis masa pentauliahan pemasangan biasa?
For greenfield projects timeline aligns overall plant construction For brownfield replacement typical schedule involves weeks demolition preparation weeks mechanical erection weeks electrical instrumentation followed by weeks cold hot commissioning Major component modularization reduces onsite time
Are there financing options available large capital expenditure?
Yes several flexible structures available including operating leases that preserve capital traditional finance We can also discuss payforperformance models where payments linked documented efficiency gains
What level ongoing technical support provided after sale?
Support includes detailed operator training startup supervision remote diagnostics access Our service network offers scheduled inspections emergency response plans ensure longterm reliability


