Ce Marked Sand Gravel Mining Makers

Penerangan ringkas:

1. PEMBUKAAN PAINPOINT DRIVEN Meningkatkan kos operasi dan masa henti yang tidak menentu menghakis margin pengeluaran agregat anda? For plant managers overseeing sand and gravel extraction, key challenges persist: inconsistent feed material degrading final product specification, excessive wear on components from abrasive particulates leading to unplanned maintenance stops, and inefficient water or dust management creating environmental compliance…


Perincian produk

Tag produk

1. PEMBUKAAN PAINPOINT DRIVEN

Kos operasi yang meningkat dan masa henti yang tidak menentu menghakis margin pengeluaran agregat anda? For plant managers overseeing sand and gravel extraction, key challenges persist: inconsistent feed material degrading final product specification, excessive wear on components from abrasive particulates leading to unplanned maintenance stops, and inefficient water or dust management creating environmental compliance risks. Each hour of unscheduled downtime can cost thousands in lost production and contract penalties. How do you increase throughput while controlling the total cost of ownership? Is your current processing line flexible enough to handle variable deposit geology without sacrificing yield? Penyelesaiannya memerlukan peralatan yang direka bentuk bukan hanya untuk kapasiti, but for durability, ketepatan, and operational stability in the most demanding pit and quarry conditions.

2. GAMBARAN KESELURUHAN PRODUK

This product line comprises CE Marked stationary and mobile sand gravel mining makers—comprehensive processing plants designed for the primary crushing, pemeriksaan, membasuh, and stockpiling of aggregate materials. Aliran kerja operasi direka bentuk untuk berterusan, keluaran volum tinggi: (1) Feed material is uniformly introduced via vibrating grizzly feeders to a robust primary crusher. (2) Crushed aggregate is then conveyed to a multideck screening unit for precise classification into specified grades. (3) Where required, sand fractions are routed through integrated cyclones or screw classifiers for washing and dewatering to meet strict cleanliness standards. (4) Sized and washed product is conveyed to designated stockpiles. (5) Integrated control systems monitor the entire process. These systems are suited for greenfield sites, existing plant upgrades, or temporary contract mining projects. Limitations include a requirement for competent site planning for stationary plants and defined feed size parameters as per model specification.

3. CIRI TERAS

Reka Bentuk Loji Modular | Asas Teknikal: Pra-kejuruteraan, bolttogether substruktur dengan antara muka piawai | Faedah Operasi: Rapid onsite assembly and future reconfiguration or expansion with minimal fabrication work | Kesan ROI: Mengurangkan masa pemasangan sehingga 30%, lowering project capital deployment and accelerating timetorevenue.

Pakej Pelapik Tahan Lelasan | Asas Teknikal: Highchrome white iron or AR steel liners in critical wear zones based on impact/abrasion analysis | Faedah Operasi: Extends service life of hoppers, jatuh, and crusher cavities in highsilica content applications | Kesan ROI: Documented reduction in liner replacement costs by 1525% annually versus standard materials.

Tahap 4 Final / Stage V Compliant Power Unit | Asas Teknikal: Advanced diesel engines or electric motor drives with integrated emission control systems | Faedah Operasi: Ensures full compliance for operation within the EU and other regulated regions without performance loss | Kesan ROI: Eliminates risk of project delays or fines due to noncompliant equipment.

Sistem Kawalan Proses Pintar | Asas Teknikal: Centralized PLC with touchscreen HMI providing realtime monitoring of tonnage, Cabutan kuasa, and screen loads | Faedah Operasi: Allows operators to optimize feed rates and identify bottlenecks instantly, maintaining peak efficiency | Kesan ROI: Data lapangan menunjukkan a 510% improvement in overall throughput efficiency through consistent load management.

Integrated Water Management Circuit | Asas Teknikal: Closedloop water recycling system with settling ponds or thickener integration | Faedah Operasi: Dramatically reduces freshwater consumption and minimizes slurry runoff for simplified site water permitting | Kesan ROI: Can cut water procurement and treatment costs by over 60%, faktor kritikal di kawasan kekurangan air.

4. KELEBIHAN KOMPETITIF

| Metrik Prestasi | Piawaian Industri | CE Marked Sand Gravel Mining Maker Solution | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Masa Min Antara Kegagalan (Bahagian Pakai Kritikal) | ~8001,200 Hours | 1,500+ Jam (with abrasion package) | +25% ke +40% |
| Masa Pentauliahan Di Tapak (MidSize Plant) | 46 minggu | 34 minggu (reka bentuk modular) | 25% ke 33% |
| Fuel Consumption per Tonne Processed (Loji Mudah Alih)| Garis dasar 100%| Optimized hydraulics & engine management reduces consumption to ~92%| 8% |
| Pemulihan Denda & hasil (Sand Washing Applications)| ~8590% Recovery| Highefficiency cyclones achieve 9295% Pemulihan| +5% ke +7% Yield Increase |

5. SPESIFIKASI TEKNIKAL

Julat Kapasiti: Model boleh didapati daripada 150 tan sejam (Tph) ke atas 600 TPH peak output.
Keperluan kuasa: Configurable with electric drive (400V/50Hz or customerspecified) or dieselhydraulic power packs with Tier 4 Final / Stage V engines.
Spesifikasi Bahan: Primary structural components fabricated from S355 grade steel; critical wear components available in Hardox®, AR400/500, or highchrome cast iron.
Dimensi Fizikal: Mobile plants designed for transport width compliance (<3m). Stationary plant footprints are customized but designed for compact layout.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +45°C. Dust suppression systems maintain particulate emissions below local regulatory thresholds.

6. SENARIO APLIKASI

Aggregate Producer – Glacial Deposit Site |
Cabaran: Highly variable feed material containing clay lenses causing frequent screen blinding and outofspec sand products.
Penyelesaian: Implementation of a CE marked sand gravel mining maker featuring an aggressive log washer module integrated before the screening deck.
Keputusan: Clay contamination was reduced from >8% ke bawah 2%, eliminating daily screen cleaning downtime. Product met EN 12620 standards consistently, membenarkan titik harga premium.

Civil Engineering Contractor – Temporary Riverbed Extraction |
Cabaran: Need for a highyield processing setup on a remote 18month infrastructure project with strict environmental discharge limits.
Penyelesaian: Deployment of a mobile tracked sand gravel mining maker with a fully closedcircuit water recycling system.
Keputusan: Kilang itu beroperasi di dalam 48 hours of arrival on site. Zero wastewater discharge simplified permitting; the project achieved all aggregate production targets onsite, eliminating costly imported material.

7. PERTIMBANGAN KOMERSIL

Peralatan ditawarkan dalam tiga peringkat utama:
1. Konfigurasi Standard: Base model plant covering core crushing and screening functions.
2. Wash Plant Configuration: Includes sizing screens, sand screw(s), taufan, dan pam buburan.
3. Konfigurasi Kapasiti Tinggi Tersuai: Engineered solutions with larger crushers, dek saringan tambahan,and advanced automation.

Optional features include magnet separators,telescopic stockpiling conveyors,kit pengkapsulan habuk,and remote telemetry packages.Service packages range from basic commissioning support to comprehensive annual maintenance contracts with guaranteed parts availability.Financing options include operating leases,perjanjian sewa beli yang disesuaikan,dan pembiayaan berasaskan projek melalui rakan kongsi bertauliah.

8. Soalan Lazim

S1: What does the CE Mark specifically guarantee about this equipment?
A1: The CE Mark confirms the machinery meets all applicable EU health,keselamatan,and environmental protection directives.It verifies compliance with the Machinery Directive(2006/42/SPR),Electromagnetic Compatibility Directive(2014/30/EU),and often the Pressure Equipment Directive(2014/68/EU),ensuring it can be legally placed on the market within the European Economic Area.Ce Marked Sand Gravel Mining Makers

S2: How does this plant handle particularly hard or abrasive rock types like granite or quartzite?
A2: For such applications,a specific "Hard Rock" configuration is recommended.This includes jaw crushers with optimized kinematics,a heavierduty cone crusher liner profile,increased wear liner thickness at transfer points,and upgraded screen mesh fastening systems.All specifications are reviewed during project engineering.

S3: What is the typical lead time from order to delivery?
A3: For standard configured models,the lead time is typically between 1216 weeks.Customengineered solutions require detailed specification review,but our modular approach often allows delivery within1822 weeks.Delivery schedules are confirmed upon order finalization.Ce Marked Sand Gravel Mining Makers

S4: Can we integrate this new plant with our existing legacy conveyors and screens?
A4: Yes.The control system can be specified as a master unit designed to interface with peripheral equipment.Plant layout engineering will account for integration points regarding height,infeed,and discharge compatibility during the design phase.

S5:Apakah latihan yang disediakan untuk pasukan operasi kami?
A5:A comprehensive training program is included.It covers safe startup/shutdown procedures,daily maintenance checks,basic troubleshooting via the HMI,and liner changeout protocols.Training occurs both at commissioning on your siteand through provided digital manuals.

S6:What are the key factors that determine whether we need an electric or dieselpowered unit?
A6:The decision primarily hinges on site infrastructure,mobility requirements,and longterm operating cost.Electric drives offer significantly lower perhour operating costs where grid power is available.Dieselhydraulic units provide complete mobility but have higher fuel costs;they are essentialfor sites without established power supply.

S7:Apakah perlindungan waranti yang disediakan?
A7:The standard warranty covers defects in materialsand workmanship fora period of12 monthsfrom commissioningor18 monthsfrom shipment.The warranty includes parts but not labor.For critical components like crusher main frames,a separate structural warranty applies.Extended warranty packages are available

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda