Ce Marked Iron Ore Crushing Plant Cheap

Penerangan ringkas:

1. PAINPOINT DRIVEN OPENING Are your iron ore processing margins being eroded by persistent operational bottlenecks? Plant managers and procurement specialists face significant challenges in primary crushing stages that directly impact the entire downstream circuit. Titik kesakitan biasa termasuk: Excessive Downtime: Unplanned stoppages for liner changes and maintenance on underspecification crushers, costing hundreds of production…


Perincian produk

Tag produk

1. PEMBUKAAN PAINPOINT DRIVEN

Are your iron ore processing margins being eroded by persistent operational bottlenecks? Plant managers and procurement specialists face significant challenges in primary crushing stages that directly impact the entire downstream circuit. Titik kesakitan biasa termasuk:
Excessive Downtime: Unplanned stoppages for liner changes and maintenance on underspecification crushers, menelan kos beratus-ratus jam pengeluaran setiap tahun.
Kos Pakai Tinggi: Rapid abrasion of crushing components in the face of hard, abrasive magnetite or hematite ores, leading to unsustainable consumables expenditure.
Inconsistent Throughput: Feed size fluctuations and material bridging causing chokefed or starved crushers, preventing consistent tonnage targets.
Regulatory Compliance Risk: Operating nonCE marked equipment exposes your project to legal liability, insurance complications, and potential site shutdowns in regulated markets.

How do you secure a robust primary crushing solution that ensures reliable throughput, controls operational costs, and meets stringent EU safety directives—all within a constrained capital budget?

2. GAMBARAN KESELURUHAN PRODUK

Our solution is a CE Marked Stationary Primary Crushing Plant engineered specifically for hard rock iron ore applications. This turnkey module is designed for the initial size reduction of runofmine (ROM) iron ore to a consistent product for downstream conveying and processing.

Aliran Kerja Operasi:
1. ROM ore is fed via dump truck or loader into a rugged vibrating grizzly feeder.
2. The feeder removes sub100mm fines via a grizzly section and evenly introduces oversize material to the primary jaw crusher.
3. The crusher reduces the ore to a nominal 150200mm product, which is discharged onto a main plant conveyor.

Skop Permohonan: Ideal for greenfield installations or replacement of aging primary crushers in mediumtolarge scale iron ore operations processing magnetite, hematit, or goethite ores.

Batasan: This plant configuration is designed for primary crushing duty only. For full circuit needs, secondary/tertiary crushing and screening modules are required. Maximum feed size and capacity are bound by model specifications.Ce Marked Iron Ore Crushing Plant Cheap

3. CIRI TERAS

Penghancur Rahang Tugas Berat | Asas Teknikal: Reinforced manganese steel jaws with optimized nip angle geometry | Faedah Operasi: Sustained high reduction ratios (biasanya 6:1 ke 8:1) on abrasive ore with minimal wear flat development | Kesan ROI: Extended liner life reduces consumable costs by an estimated 1525% berbanding reka bentuk standard.

Penyumpan Grizzly Bersepadu | Asas Teknikal: Dek keluli berkekuatan tinggi dengan bar berwarna kelabu boleh laras | Faedah Operasi: Prescreening increases effective crusher capacity by removing fines, reduces crusher cavity wear, and prevents plugging | Kesan ROI: Improves overall plant throughput efficiency and protects the crusher from unnecessary abrasion.

Keselamatan Diperakui CE & Sistem kawalan | Asas Teknikal: Full compliance with EU Machinery Directive 2006/42/EC, featuring guarded drive units, emergency stop circuits, and lockout/tagout points | Faedah Operasi: Provides a verifiable safety framework, protects personnel, and ensures market access in regulated regions | Kesan ROI: Mitigates project risk from noncompliance penalties and simplifies insurance procurement.

Reka Bentuk SkidMounted Modular | Asas Teknikal: Preassembled structural steel skid with integrated walkways and maintenance platforms | Faedah Operasi: Significantly reduces civil works and onsite assembly time—plant can be operational within weeks of delivery | Kesan ROI: Lowers total installed cost by up to 30% compared to traditional fieldbuilt foundations and structures.

Ce Marked Iron Ore Crushing Plant Cheap

Pelincir Berpusat & Sistem hidraulik | Asas Teknikal: Singlepoint greasing lines for key bearings and integrated hydraulic system for adjustment & pembersihan | Faedah Operasi: Simplifies routine maintenance schedules; enables quick setting adjustment and tramp iron release without downtime | Kesan ROI: Reduces planned maintenance time by approximately 20%, meningkatkan waktu operasi tahunan yang tersedia.

4. KELEBIHAN KOMPETITIF

| Metrik Prestasi | Piawaian Industri (Typical NonCE Plant) | Penyelesaian Loji Penghancur Bijih Besi Bertanda CE kami | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Kehidupan Pelapik (Bijih Pelelas)| ~450,000 MT throughput per set| ~600,000 MT throughput per set| +33% |
| Masa Min Antara Kegagalan (MTBF)| ~800 jam| ~1,200 jam| +50% |
| Pemasangan & Masa Pentauliahan| 812 minggu| 35 minggu| ~60% lebih pantas |
| Penggunaan Tenaga setiap Tan| Garis dasar (100%)| Kira -kira 9295% daripada garis dasar| 58% pengurangan |
| Regulatory Market Access| Requires extensive retrofit & documentation| Full CE compliance from delivery| Eliminates retrofit cost & delay |

5. SPESIFIKASI TEKNIKAL

Julat Kapasiti: 400 1,200 tan sejam (Tph), dependent on feed size distribution and ore characteristics.
Jenis Penghancur Utama: Penghancur rahang togol tunggal.
Pembukaan suapan: Up to 1,500mm x 1,200mm.
Saiz suapan maksimum: Up to 1,050mm edge length.
Julat Tetapan Pelepasan: 150 250mm CSS (Tetapan sampingan tertutup).
Keperluan kuasa: Jumlah kuasa terpasang lebih kurang 300 450 kw (crusher motor + Motor Feeder + bantuan).
Spesifikasi Bahan: Crusher jaws in premiumgrade Manganese Steel (14%18%); structural steel grade S355JR; wear plates on feed hopper.
Dimensi Fizikal (Skid): Lebih kurang. Panjang: 16m x Lebar: 5m x Tinggi: 6m (berbeza mengikut model).
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +45°C; standard sambungan sistem penindasan habuk.

6. SENARIO APLIKASI

MidSized Magnetite Operation Expansion

Cabaran: A Nordic mine needed to expand primary capacity but faced high local labor costs for extended onsite construction. Regulatory requirements mandated full CE compliance.
Penyelesaian: Installation of a preassembled skidmounted CE marked iron ore crushing plant with integrated dust suppression.
Keputusan: The plant was commissioned in under four weeks postdelivery. It achieved permitted throughput immediately while reducing projected installation costs by approximately €150k.

Pemodenan Loji Pemprosesan Hematit

Challenge An aging processing facility suffered from constant unplanned downtime in its primary section due to crusher failures and excessive liner wear on hard hematite ore.
Solution Replacement of the legacy primary setup with our heavyduty jaw crusher plant featuring centralized lube systems and reinforced liners.
Results Field data shows liner life improved from an average of ~380k tonnes to over 550k tonnes. Annual planned maintenance events were reduced from five to three directly increasing annual available operating time

Pertimbangan Komersial

Equipment Pricing Tiers are structured around throughput capacity core drive power
Peringkat I (900 Tph): Highcapacity configuration with premium components

Optional Features include advanced condition monitoring sensors onboard weighing systems automated grease systems specific wear package upgrades for highly abrasive ores

Service Packages range from basic commissioning support up through comprehensive multiyear scheduled maintenance plans including liner changeout services performed by factorytrained technicians

Financing Options are available including leasing structures that preserve capital expenditure lines or progressbased payment plans aligned with project milestones

Soalan Lazim

Q Is this plant compatible with my existing secondary circuit conveyors
A Yes The discharge height conveyor interface points can be adapted during engineering Standard discharge heights are provided but modifications are possible prior to build

Q What is the expected impact on my overall plant availability
A Based on historical performance data this design improves primary section availability typically achieving >94 due primarily to increased component life reduced unscheduled stops

Q Does CE marking cover the entire electrical system
A Yes Full CE certification encompasses all mechanical electrical control aspects ensuring conformity with relevant EU directives essential for projects requiring European certification

Q Are wear parts readily available globally
A We maintain strategic parts inventories in key mining regions Lead times for critical wear parts like jaw liners average less than days supported by our global logistics network

Q What commercial terms are standard
A Standard terms involve progress payments against engineering milestones factory acceptance testing FAT shipment Final payment is due upon completion of successful site commissioning