Ball Mill Processing Plant Factory Price

Penerangan ringkas:

1. PEMBUKAAN PAINPOINT DRIVEN Adakah anda menguruskan kesesakan litar pengisaran yang mengekang keseluruhan loji pemprosesan anda? Operational challenges with your ball mill system directly impact throughput, belanjawan penyelenggaraan, dan konsistensi produk. Titik kesakitan biasa termasuk: Penggunaan Tenaga Berlebihan: Pengisaran boleh mengambil kira lebih 50% of a plant’s total energy draw. Inefficient milling directly increases operational…


Perincian produk

Tag produk

1. PEMBUKAAN PAINPOINT DRIVEN

Adakah anda menguruskan kesesakan litar pengisaran yang mengekang keseluruhan loji pemprosesan anda? Operational challenges with your ball mill system directly impact throughput, belanjawan penyelenggaraan, dan konsistensi produk. Titik kesakitan biasa termasuk:

Penggunaan Tenaga Berlebihan: Pengisaran boleh mengambil kira lebih 50% of a plant's total energy draw. Inefficient milling directly increases operational costs.
Unplanned Downtime for Liner & Media Replacement: Kerap, lengthy stoppages for maintenance disrupt production schedules and increase labor costs.
Inconsistent Product Particle Size: Poor grind control leads to downstream recovery issues in flotation or leaching, reducing final product yield and quality.
Media Tinggi & Kos Pakai Pelapik: Rapid consumption of grinding media and liners represents a significant, recurring consumable expense.
Fleksibiliti Proses Terhad: Inflexible mills struggle to adapt to varying ore hardness or feed grades, forcing suboptimal processing.

Adakah operasi anda menghadapi metrik costperton yang semakin meningkat? Are you seeking a reliable ball mill solution engineered to maximize availability and grinding efficiency while controlling lifetime operating costs?

2. GAMBARAN KESELURUHAN PRODUK: INDUSTRIAL BALL MILL PROCESSING PLANT

Penerangan produk ini terperinci dengan lengkap, heavyduty Ball Mill Processing Plant engineered for continuous, hightonnage mineral reduction. The system is designed as the core of the grinding circuit for liberating valuable minerals from ore.

Aliran Kerja Operasi:
1. Suapan Terkawal: Crushed ore is conveyed at a regulated rate into the mill's feed trunnion.
2. Tindakan Pengisaran: The rotating mill chamber, partially filled with steel grinding balls, cascades and tumbles the charge, memberi kesan dan melecetkan zarah bijih.
3. Klasifikasi saiz & Pelepasan: Ground material exits via the discharge trunnion and is typically routed to a classifier (mis., hidrosiklon). Bahan bersaiz besar dikembalikan untuk dikisar semula, while the fine product proceeds to downstream processes.

Skop Permohonan: Ideal for secondary and tertiary grinding stages in metallic mineral processing (Tembaga, emas, besi), Mineral Perindustrian, dan pengeluaran simen. Suitable for both wet and dry grinding applications.

Batasan: Not designed for primary crushing of runofmine ore. Optimal performance requires consistent feed sizing control upstream. Very fine grinding (below ~20 microns) may require supplementary specialized equipment.

3. CIRI TERAS

Optimized Drive System | Asas Teknikal: DualPinion Synchronous Motor with Gearless or Girth Gear Drive | Faedah Operasi: Provides smooth startup under full load conditions and stable operation at optimal rotational speed, mengurangkan tekanan mekanikal | Kesan ROI: Data medan menunjukkan sehingga satu 8% improvement in power transmission efficiency compared to outdated singlepinion systems, lowering direct energy costs.
Reka Bentuk Pelapik Termaju | Asas Teknikal: Computermodeled profile using highchrome or alloy steel for specific ore characteristics | Faedah Operasi: Increases liner service life by promoting optimal charge motion and reducing metalonmetal wear | Kesan ROI: Documented case studies report liner life extensions of 2035%, decreasing part costs and downtime frequency.
Pelinciran Automatik & Pemantauan Keadaan | Asas Teknikal: Centralized grease/oil systems with flow sensors and integrated temperature/vibration monitoring points | Faedah Operasi: Your operators benefit from predictive maintenance alerts and eliminated manual lubrication points, meningkatkan keselamatan | Kesan ROI: Mengurangkan risiko kegagalan galas bencana; industry reports indicate a 1525% decrease in unscheduled driverelated stoppages.
Robust Trunnion & Perhimpunan Galas | Asas Teknikal: Largediameter trunnions mounted on hydrodynamic slide shoe bearings | Faedah Operasi: Supports high mill loads with minimal friction, capable of handling operational fluctuations | Kesan ROI: Meningkatkan ketersediaan mekanikal di atas 95%, directly supporting sustained plant throughput targets.
Process Control Interface | Asas Teknikal: PLCready with standard I/O for integration with plant DCS/SCADA systems | Faedah Operasi: Enables precise control over mill load, ketumpatan, and circulating load for consistent grind size | Kesan ROI: Improved grind consistency typically yields a 13% increase in downstream recovery rates for many ores.

4. KELEBIHAN KOMPETITIFBall Mill Processing Plant Factory Price

| Metrik Prestasi | Garis Dasar Piawaian Industri | This Ball Mill Solution Documented Performance | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Penggunaan Tenaga Khusus (kWj/t) | Garis dasar = 100% | Reka bentuk yang dioptimumkan & drive efficiency reduces consumption by ~7% on average| ~7% Improvement |
| Ketersediaan Mekanikal (tahunan) | ~9294% sasaran ketersediaan >95% ketersediaan operasi| >23% Penambahbaikan |
| Pengisaran Penggunaan Media (g/t) Garis dasar = 100% Advanced liner design & optimal charge motion reduces wear by ~1520%| ~1520% Improvement |
| Tempoh Tukar Pelapik (Jam) Standard duration varies by size Reduced downtime via optimized boltless or quickchange designs| Hingga 30% Lebih pantasBall Mill Processing Plant Factory Price

_Based on comparative testing against legacy mill designs in similar duty._
_Based on field service records across multiple installations over a 3year period._
_Dependent on ore abrasiveness; improvement based on controlled site trials._

5. SPESIFIKASI TEKNIKAL

Julat Kapasiti: Configurable from pilotscale (0.5m diameter x 1m length) to full production units exceeding 5m diameter x 10m+ length.
Keperluan kuasa: From ~100 kW to over 10 MW motor power supply; direka untuk voltan tinggi (3.3kV 11kV) industrial power networks.
Spesifikasi Bahan:
Shell & Ends: Dibuat daripada plat keluli karbon tegangan tinggi.
Pelapik: HighCr cast iron / NiHard / Manganese steel options based on application.
Media Pengisaran: Forged or cast highcarbon steel balls supplied; size recommendations provided.
Dimensi Fizikal: Kejuruteraan khusus mengikut kapasiti; all designs account for foundation loading, kelegaan penyelenggaraan, and material flow integration.
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +50°C; kandang kedap habuk tersedia; suitable for indoor or sheltered outdoor installation.

6. SENARIO APLIKASI

Projek Pembesaran Penumpu Tembaga

Challenge A major copper producer needed to debottleneck their grinding circuit to meet a 25% throughput increase target without expanding their building footprint.Solution Implementation of two largediameter overflow ball mills with highefficiency drives in closed circuit with existing classifiers.The new mills' higher efficiency allowed the required throughput at a lower than projected power draw per ton.The project achieved its throughput goal with specific energy consumption reduced by 9%. Plant availability increased due to the modern bearing design.

Pengeluar Mineral Perindustrian

Challenge An industrial minerals plant faced inconsistent product fineness due to variable feed hardness causing downstream quality rejections.Solution Installation of an advanced processcontrolled ball mill system integrated with realtime particle size analysis.The automated system adjusts mill speed and feed rate dynamically based on realtime feedback.Postinstallation data showed product fineness consistency improved by over 40%, drastically reducing offspec material.Media consumption also decreased by an estimated12%.

Retrofit Loji Pemprosesan Emas

Challenge High maintenance costs from frequent liner changes in an abrasive ore environment were cutting into profit margins.Solution Retrofit of existing ball mill shell with proprietary boltless liner system using ultrahigh chrome white iron.The new liner profile was engineered specifically for the site's ore abrasion index.The liner service life increased from approximately6 months to9 months resulting in one less full changeout per year.This translated into an annual saving of over250 hours of downtime plus direct liner cost savings

PERTIMBANGAN KOMERSIL

Equipment pricing is tiered based on mill size drive configurationand levelof automation

Base Configuration Tier Includes themill shell drive train main bearingsand baselubrication system suitablefor clients integratingthemill intoan existingcontrol environment

Premium Configuration Tier Adds full PLCbased local control panel advanced condition monitoring sensorsand premiumliner materials Offers turnkey process integration support

Optional Features Supplemental air clutch systems specialized discharge trommel screens noise reduction enclosuresand sparepartskitsare available

Service Packages Choosefrom:
Basic Warranty Covers partsand laborfor defectsfor12 months
Extended Support Plan Multiyear coverage including scheduled bearing inspectionsand vibration analysis
Full Maintenance Contract Comprehensive parts laborand planned outage supportfor definedperiod

Financing Options Flexible commercial terms are available including leasetoown structuresand milestonebased payment plans alignedwith project timelines These options help manage capital expenditure

Soalan Lazim

What upstream crusher product size is requiredfor optimalballmillfeed
For efficient operation we recommenda consistentfeed sizewith amaximum top sizeof25mm(1") though specificcircuits may vary Properfeed sizingis criticalto achievingrated capacity

How does thisballmill solutionhandle variationsinorehardness
The robustdrive train providesstable operationunder fluctuatingloads For significantore variability we recommendthe processcontrol interfaceoption which allows automatic adjustmentsto maintainproductsize

Whatisthe typicalinstallationand commissioningtimeline
Fora standardproductionmill deliveryis2436weeks postorder Mechanical installationrequires48weeks dependingon foundationsite readiness Commissioningand performance testingtypically takes2 weeks Thisis managedby ourprojectengineers

Areyourliners compatiblewith existingmill shellsfromother manufacturers
We offerretrofit solutions Manyof our advancedliner designs canbe adaptedto fit existing shells subjectto adetailed dimensional survey We provide this engineeringas partof the proposalprocess

Whatisthe expectedpayback periodon theenergy efficiency gains
Basedon historicaldata formidsized concentrators operatingat highpower rates the energysavingsfromthedriveand designoptimizations canyielda paybackperiodof1830months dependingon localpowercosts AdetailedROI calculationis providedwith each proposal

Tinggalkan mesej anda

Tulis mesej anda di sini dan hantarkan kepada kami

Tinggalkan mesej anda