Ball Mill Company Wholesale Price
1. PEMBUKAAN PAINPOINT DRIVEN
Adakah anda menguruskan operasi pengisaran di mana kehalusan produk yang tidak konsisten membawa kepada isu pemprosesan hiliran dan penolakan produk? Are unplanned maintenance shutdowns for liner changes or bearing failures disrupting your production schedule and inflating operational costs? Is your current ball mill consuming excessive energy per ton of processed material, menghakis margin keuntungan anda? Do you face challenges with material handling, where feed size limitations or discharge inefficiencies create bottlenecks in your circuit?
Ini bukan ketidakcekapan kecil; they are direct hits to your plant’s throughput, operational budget, dan garis bawah. Soalan intinya ialah: how do you achieve precise particle size control while maximizing mechanical reliability and minimizing total cost of ownership in your grinding circuit? The answer lies in selecting a ball mill engineered not just to rotate, tetapi untuk mengoptimumkan.
2. GAMBARAN KESELURUHAN PRODUK
This product description details our advanced Kilang Bola solutions for industrial mineral processing and comminution. Direka untuk berterusan, operasi tugas berat, this equipment is designed to reduce material from a coarse feed size to a finely ground product through impact and attrition.
Aliran Kerja Operasi:
1. Pemakanan Terkawal: Raw or crushed material is fed into the mill’s inlet trunnion at a regulated rate.
2. Tindakan Dewan Pengisaran: The rotation of the mill lifts the grinding media (bola keluli) and ore charge. Cascading and cataracting action within the cylindrical shell achieves size reduction.
3. Particle Size Refinement: Repeated impact fractures particles; finer grinding occurs through attrition as layers of material slide against each other.
4. Pelepasan & Pengelasan: Ground material exits via the discharge trunnion, typically flowing to a classification system (mis., taufan). Oversize material is returned for regrinding.
Skop Permohonan: Pengisaran basah atau kering bijih, klinker simen, batu kapur, and other industrial minerals in open or closed circuits.
Had Utama: Tidak sesuai untuk pengisaran ultrahalus di bawah ~20 mikron tanpa reka bentuk litar khusus. Efficiency drops significantly with improper feed size distribution or incorrect media charge.
3. CIRI TERAS
Sistem Pelapik Termaju | Asas Teknikal: Highchrome alloy steel with engineered lifter profile | Faedah Operasi: Reduces liner wear rates by up to 40%, memanjangkan selang perkhidmatan, maintains optimal charge trajectory for consistent grinding efficiency | Kesan ROI: Lowers maintenance labor and parts costs, increases annual available operating hours
Pemacu Pintar & Perhimpunan Galas | Asas Teknikal: Girth gear dualpinion drive with hydrodynamic slide shoe bearings | Faedah Operasi: Menyediakan permulaan yang lancar di bawah beban penuh, eliminates risk of trunnion bearing seizure, mengurangkan tekanan mekanikal | Kesan ROI: Minimizes risk of catastrophic drive failure and associated weeks of downtime
Reka Bentuk Bilik Dioptimumkan | Asas Teknikal: Dinamik Bendalir Pengiraan (Cfd) modeled discharge diaphragm & grate design | Faedah Operasi: Ensures efficient evacuation of ground product, prevents overgrinding and backpressure | Kesan ROI: Improves specific throughput (tons/hour/kW) by facilitating faster material transport
Pemantauan Keadaan Bersepadu | Asas Teknikal: Penderia terbenam untuk getaran, suhu, dan pelepasan akustik | Faedah Operasi: Enables predictive maintenance by identifying irregular bearing wear or liner failure before it causes stoppage | Kesan ROI: Mengubah penyelenggaraan daripada reaktif kepada terancang, protecting production targets
Reka Bentuk Komponen Modular | Asas Teknikal: Standardized flange connections and sectionalized liner plates | Faedah Operasi: Significantly reduces replacement time for wear parts during planned outages | Kesan ROI: Cuts downtime duration by up to 30% semasa perubahan pelapik, accelerating return to production
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Penanda Aras Piawaian Industri | Penyelesaian Kilang Bola Kami | Kelebihan Berdokumen |
| : | : | : | : |
| Hayat Perkhidmatan Pelapik (Bijih Pelelas) | 46 bulan | 810 bulan | +67% penambahbaikan |
| Penggunaan Tenaga Khusus (kWj/t) | Berbeza mengikut bijih; garis dasar = 100% | Optimized design reduces baseline consumption| 512% pengurangan |
| Masa Min Antara Kegagalan (Sistem pemacu) | ~18 bulan (penyelenggaraan reaktif)| >36 bulan (dengan pemantauan ramalan)| +100% penambahbaikan |
| Planned Liner Change Downtime (Jam)| 7296 hours for full change| 4860 hours with modular design| ~35% reduction |
5. SPESIFIKASI TEKNIKAL
Julat Kapasiti: Dari skala perintis (0.5 Tph) kepada kilang pengeluaran besar melebihi 150 Tph.
Keperluan kuasa: daripada 75 kW hingga lebih 10 MW; configurable for highvoltage motor supply (mis., 3.3 kV, 6.6 kV).
Spesifikasi Bahan: Cangkang yang dibina daripada plat keluli tergelek yang dikimpal (minimum Q345B). Critical wear components utilize highchrome cast iron (>18% Cr). Girth gear precision machined from forged alloy steel.
Dimensi Fizikal: Diameter dari 1.8m hingga lebih 5.5m; pembolehubah panjang berdasarkan keperluan nisbah L/D (biasanya 1.5:1 ke 2.5:1).
Julat Operasi Persekitaran: Direka untuk suhu ambien dari 20°C hingga +50°C. Bearing lubrication systems include heating/cooling circuits as required.
6. SENARIO APLIKASI
Cabaran Pembesaran Loji Penumpu Tembaga:| Required a 25% throughput increase without expanding footprint or compromising grind size (P80 of 150µm). Existing mills were bottlenecked.| Penyelesaian:| Installation of two highefficiency ball mills with optimized chamber geometry and highpower density drives.| Keputusan:| Tercapai a 28% increase in circuit throughput while maintaining target grind size. Specific energy consumption improved by 8%, validating the efficiency gains.
Industrial Minerals Producer Challenge:| Frequent diaphragm clogging and inconsistent discharge led to unstable cyclone feed density and poor classification efficiency.| Penyelesaian:| Retrofitted existing ball mills with our proprietary gratedischarge system designed for highclay content material.| Keputusan:| Discharge stability improved dramatically. Cyclone feed density variation reduced by over 70%, leading to a more stable closedcircuit operation and a more consistent final product.
7. PERTIMBANGAN KOMERSIL
Our ball mill pricing is structured around core capacity and configuration:
Peringkat A (Kewajipan Standard): For less abrasive materials; offers robust performance with standard liner materials.
Peringkat B (Tugas Berat): For highly abrasive ores; includes premium liner systems, enhanced bearing packages, and basic condition monitoring.
Peringkat C (ProcessOptimized):) Fully customized solutions featuring advanced instrumentation, premium drives, and process guarantee support.
Ciri pilihan termasuk sistem pelinciran automatik, advanced process control interfaces, and custom coating/painting for harsh environments.
We offer comprehensive service packages from basic commissioning support to full multiyear maintenance agreements with guaranteed parts availability.
Financing options include capital purchase with tiered payment plans or longterm leasing structures designed to align with your project's cash flow profile.
8.Soalan Lazim
1.Q:What information is needed to specify the correct ball mill for our application?
A.We require your target throughput (Tph), Pengagihan saiz suapan (F80), kehalusan produk yang diingini (P80), ore work index/Bond data,and whether operation will be wet or dry.This allows us to model the correct mill dimensions,kuasa motor,and internal configuration.
2.Q.Can this ball mill be integrated into our existing grinding circuit with different OEM equipment?
A Yes.All electrical interfaces(PLC/DCS)and mechanical connections(pelongsor suapan,pump sumps)are designedto industry standards.Field data shows successful integration is standard practice when proper preinstallation engineering reviews are conducted
3.Q.What is the typical lead time from order placementto commissioning?
A Lead times varyby siz eand complexity.For standard heavyduty designsin common capacity rangeslead times are typically69 months.Customprocessoptimized solutions may require1012 months.Detailed schedulesare providedwith project quotation
4.Q.How doesyour solution address the total costof ownership(Tco)?
A Our design philosophy prioritizes reliabilityand energy efficiency—the two largest contributors t oTCO.The extendedliner life reducedenergy consumptionand predictive monitoringcapabilities directly loweroperatingcosts amortizedoverthemill'slifespan which often exceeds25 years
5.S.Adakah jaminan prestasi ditawarkan?
A Yes.For Tier C ProcessOptimized solutions we offerguaranteeson throughput capacityand specific energy consumptionbasedon agreedupon ore testworkand process parametersThese are contractually defined
6.Q.What trainingis providedfor our operationsand maintenanceteams?
A We provide comprehensive training covering safe operational procedures routine maintenance checks troubleshooting guidesand detailed instructionon usingany conditionmonitoring systemsThis trainingis conductedduring commissioning
7.Q.Whatisthe policyon spare parts availability?
A We maintaina global inventoryof criticalwear partsand componentsfora minimumof15 yearsaftermill installationGuaranteedparts dispatchtimesare availablethroughour serviceagreements


