500 Tph Gold Mining Washing Plant Kos Pengeluar ODM
1. PEMBUKAAN PAINPOINT DRIVEN
Are you scaling up your alluvial or eluvial gold operation and facing the critical bottlenecks of highvolume material processing? A standard 500 TPH gold mining washing plant is a significant capital investment, yet many operations struggle with hidden costs that erode profitability. Cabaran biasa termasuk:
High Downtime for Maintenance: Frequent clogging in scrubbers or screens halts the entire processing line, menelan belanja beribu-ribu sejam dalam pengeluaran yang hilang.
Inconsistent Recovery Rates: Variable feed material can overwhelm traditional trommels and sluices, leading to fine gold loss that directly impacts revenue.
Excessive Water & Penggunaan kuasa: Inefficient pump systems and plant design lead to unsustainable operational expenses, especially in remote sites.
Rapid Component Wear: Abrasive clays and gravel degrade standard liners and screens quickly, increasing part replacement frequency and labor costs.
Difficulty in Achieving SteadyState Operation: Balancing feed rate, scrubbing efficiency, and gold concentration across a 500 TPH system is complex, often resulting in suboptimal throughput.
How do you ensure your major equipment investment delivers not just capacity, but reliable, costeffective ounces? The solution lies in an engineered approach focused on durability, recovery optimization, dan jumlah kos pemilikan.
2. GAMBARAN KESELURUHAN PRODUK
ini 500 TPH mobile or modular gold mining washing plant is a complete gravity separation system designed for highvolume placer, alluvial, and eluvial deposits. It integrates robust scrubbing, precise classification, and efficient concentration into a continuous process flow.
Aliran Kerja Operasi:
1. Primary Feed & Scrubbing: Runofmine material is fed via hopper or conveyor into a heavyduty rotating scrubber, thoroughly breaking down clay agglomerates and liberating gold.
2. Material Classification: The discharged slurry is processed by a vibrating screen deck to separate oversize waste rock (+10mm to +75mm depending on deposit) from the valuable fines.
3. Fine Material Concentration: The undersize slurry containing gold reports to a series of enhanced gravity concentrators (such as centrifugal concentrators or pulsating sluices) for primary recovery.
4. Pengurusan Tailing & Water Handling: Waste streams are directed to a settling system or dewatering unit for water reclamation, critical for environmental compliance and reducing fresh water intake.
Skop Permohonan & Batasan:
Sesuai Untuk: Largescale alluvial operations, riverine deposits, weathered eluvial zones with high clay content, and gravel pit reconcentration projects.
Batasan: Not suitable for hard rock (lode) mining without prior crushing. Optimal performance requires adequate water supply (though recirculation systems minimize this). Feed material size typically limited to less than 250mm.
3. CIRI TERAS
HeavyDuty Scrubber Module | Asas Teknikal: Hightorque drum drive with internal lifters | Faedah Operasi: Ensures complete disaggregation of tough claybound feeds without clogging, maintaining consistent 500 TPH throughput | Kesan ROI: Reduces feedrelated downtime by up to 70%, maximizing plant utilization.
Modular Vibrating Screen Deck | Asas Teknikal: Multistage polyurethane screen panels with highGforce vibration | Faedah Operasi: Provides accurate sizing separation even with high moisture content, protecting downstream concentrators from overload | Kesan ROI: Extends screen panel life by 40% compared to rubber panels and improves overall recovery stability.
Optimized Pumping System | Asas Teknikal: Hydraulically sized slurry pumps with wearresistant liners | Faedah Operasi: Maintains designed flow rates with lower required horsepower through reduced system head loss | Kesan ROI: Cuts power consumption for material movement by an estimated 1525% setiap tahun.
Primary Gravity Concentration Array | Asas Teknikal: Parallel configured centrifugal concentrators with automated concentrate bowl discharge | Faedah Operasi: Delivers high recovery rates on both fine and coarse gold across fluctuating feed grades with minimal operator intervention | Kesan ROI: Increases overall gold recovery by 38% compared to traditional sluicebased plants for typical alluvial feeds.
Integrated Water Recirculation System | Asas Teknikal: Clarification tank or thickener module with return pumps | Faedah Operasi: Kitar semula sehingga 85% daripada air proses, drastically reducing fresh water requirements and simplifying discharge compliance | Kesan ROI: Lowers water sourcing costs and mitigates environmental permitting risks.
Centralized Control & Monitoring Cabin | Asas Teknikal: PLCbased control panel with key parameter sensors (tekanan, amp draw, kadar suapan) | Faedah Operasi: Allows a single operator to monitor and adjust the entire washing plant process from one location | Kesan ROI: Reduces operational labor requirements and enables rapid response to process upsets.

SkidMounted / Reka bentuk modular | Asas Teknikal: Bolttogether structural modules with integrated walkways and lifting points | Operational Benefit Enables faster onsite assembly (30% less time than fully fieldwelded builds) and future plant reconfiguration or relocation| ROI Impact Lowers installation costs and protects longterm asset flexibility
4. KELEBIHAN KOMPETITIF
| Metrik Prestasi | Piawaian Industri untuk 500 Tumbuhan TPH | ini 500 TPH Gold Mining Washing Plant Solution | Kelebihan (% Penambahbaikan) |
| : | : | : | : |
| Adanya / Masa aktif| 8588% (downtime for unclogging/liner change)| >92% (engineered material flow & quickaccess liners)| +5% ke +8% more productive hours |
| Gold Recovery Rate| Varies significantly; ~8892% for fine gold (<100 mesh)| Consistent recovery range of 9296% for 6mm material| +4% average increase in yield |
| Water Consumption| High fresh water demand; limited recirculation| Integrated closedloop system with >85% recirculation| Hingga 80% reduction in fresh water use |
| Penggunaan kuasa (kWh/T)| Dianggarkan 1.8 2.2 kWh/Ton processed| Optimized design targets 1.5 1.7 kWh/Ton processed| ~15% improvement in energy efficiency |
| Masa Perhimpunan Di Tapak| Extensive field welding; 812 weeks typical| Preassembled modular skids; target of 68 minggu| ~2530% faster commissioning |
5. SPESIFIKASI TEKNIKAL
Kapasiti Reka Bentuk: Nominal 500 tan metrik sejam (550 US tan sejam), variable based on specific gravity and clay content of feed material.
Keperluan kuasa: Jumlah beban yang disambungkan lebih kurang 800 950 kw. Configured for HV supply (6kV/11kV) or stepdown transformers for LV distribution.
Spesifikasi Bahan Utama:
Scrubber Drum & Chute Liners: Abrasionresistant steel (AR400) or replaceable rubber composite.
Dek Skrin: Modular polyurethane panels.
Concentrator Bowls/Beds:Ceramic or polyurethane wear surfaces.
Keluli Struktur:ASTM A36 painted or primed for severe service.
Dimensi Fizikal (Modular): Approximate footprint of 60m L x18m W x12m H . Configurations vary based on optional modules.
Julat Operasi Persekitaran: Designed for ambient temperatures from 20°Cto +50°C . Dust suppression spraysand enclosed conveyors are standard.
6. SENARIO APLIKASI
LargeScale Alluvial Operation in West Africa
Challenge A concession holder neededto upgrade from multiple smaller plants (~200 TPH total)to a single highcapacity unitto reduce operating complexityand meet production targets.The existing setup sufferedfrom inconsistent fine gold recoveryand high fuel costsfor multiple power gensets
Solution Implementationofa singleline500 TPHgold mining washing plantwitha centralpower gensetand enhanced centrifugalconcentration array.The modular designallowedfor phasedcommissioningwithout haltingall existingproduction
Results The consolidatedoperation achieveda22 increasein tons processedper literof fuel Plant availabilityreached93 due toreduced transferpointsand simplifiedmaterial flow Overall recoveryfor the depositimprovedfroman estimated89to94
Eluvial / Saprolite Gold Project in South America
Challenge Processing highly weatheredclayrichmaterial thatconsistently blindedtrommel screensin previousplants causingfrequentstoppages Water sourcingwas expensiveand tailings dam managementwas acritical costfactor
Solution A500 TPHplant featuringan extralongscrubber sectionfor completeclay breakdownfollowedby linearvibratingscreens The systemincludedahighcapacitywater clarifiertomaximize recirculation
Results Screen blindingwas virtuallyeliminated maintainingdesign throughput Tailings densityincreased allowingfor asmallerfootprintimpoundment Freshwater consumptionwascutby75 deliveringpaybackonthe clarifiermodulein under14 months
7 PERTIMBANGAN KOMERSIL
Equipment pricing fora500 TPHgold mining washingplant is projectspecificbasedon configuration optionsand site conditions
PricingTiers
BasePlant Includescore scrubber screening primaryconcentrationand basiccontrolsystem
EnhancedPackage AddsadvancedPLC automation waterscirculationclarifier additionalconcentratorfor scavenger duty
TurnkeyPremium Includesall modules sparespackage onsite commissioning supervision training extendedwarranty
Ciri Pilihan
Onboardpower generation package( diesel)
Oversizematerial secondaryscrubbingcircuit
Tailings dewateringpresses( filteror beltpress)
Comprehensiveinstrumentation package( densityflow meters)
Containerizedworkshop sparesstorage
ServicePackages Availableasannualcontracts includeperiodicinspections wearpart supply prioritytechnical support predictive maintenanceplanning
FinancingOptions Canbe structuredthroughpartner financial institutionsincludingleaseto own arrangementsor equipmentloans typicallyover36to60month terms Projectfinancingmaybe availablefor qualifieddevelopers
8 Soalan Lazim
Whatis themaximumfeed sizeyour500 TPHwashingplant canaccept?
Thestandardfeed hopperand scrubberinletare designedfor materialupto250mm Optimalperformanceis achievedwithfeed lessthan150mm Largerprimarygrizzliescanbe addedas anoption
Howmanyoperatorsarerequiredtoruntheplant?
Thecentralizedcontrolsystemis designedformonitoringby asingleoperator Additionalgroundpersonnelare typicallyneededfor feedmanagement mechanicalchecksand concentratehandling Totalcrewof34personsper shiftis common
Cantheplant be relocatedafterinitialinstallation?
Yes themodular skiddeddesignfacilitatesdisassembly relocation andrecommissioning Relocationtimelinesdependonsite accesbutare significantlyshorterthanfordismantlingafield weldedstructure
Whatisthetypicalleadtimefromorderto commissioning?
Forastandardconfiguration leadtimeis approximately2632weeks Exworks Criticalpathitems includemajorfabricationsandlong leadtimecomponentslike largegearboxes Customizationsmayextendthistimeline
Doyouprovideperformanceguaranteesfortheplant?
Yes weofferperformanceguaranteeson throughput capacityunderdefinedfeed conditions mechanicalavailability andrecoveryefficiencybasedonrepresentative samplesofclientfeedmaterial Theseare detailedincommercialcontracts