500 Tph Gold Mining Washing Plant Factory Quote

Товч тодорхойлолт:

1. PAINPOINT DRIVEN OPENING Scaling your gold recovery operation to 500 Tph presents distinct challenges that directly impact profitability. Та мэдэрч байна уу: Үйл ажиллагааны өндөр зогсолт: Frequent clogging in scrubbers or screens from claybound material, leading to costly hourly production losses. Тогтворгүй нөхөн сэргээх хувь хэмжээ: Variable feed material causing gold losses in fines or inefficient separation, directly…


Бүтээгдэхүүний дэлгэрэнгүй

Бүтээгдэхүүний бичиг

1. PAINPOINT DRIVE NOLEING

Scaling your gold recovery operation to 500 Tph presents distinct challenges that directly impact profitability. Та мэдэрч байна уу:
Үйл ажиллагааны өндөр зогсолт: Frequent clogging in scrubbers or screens from claybound material, leading to costly hourly production losses.
Тогтворгүй нөхөн сэргээх хувь хэмжээ: Variable feed material causing gold losses in fines or inefficient separation, directly reducing revenue per ton processed.
Excessive Water & Эрчим хүч ердийн клуб: Inefficient washing and screening loops consuming disproportionate resources, eroding margin in remote locations.
High Maintenance Burden: Constant wear on components from abrasive feeds and inadequate material handling, increasing spare parts costs and labor hours.
Өргөтгөх боломжийн хязгаарлалт: A plant that cannot handle peak feed volumes or adapt to changing ore body characteristics, capping your operation’s potential.

Үйлдвэрийн менежерүүдийн гол асуулт бол: хэрхэн найдвартай байдалд хүрэх вэ, highvolume throughput with predictable operating costs and maximized recovery? Хариулт нь инженерчлэгдсэн зорилготой юм 500 Tph gold mining washing plant.

2. БҮТЭЭГДЭХҮҮНИЙ ТОЙМ

This solution is a complete, modular gold mining washing plant engineered for alluvial and eluvial deposits. It is designed for primary scrubbing, clay breakdown, Дэлгэц авах, and gravity concentration preconcentration at a nominal 500tonperhour throughput.

Үйл ажиллагааны ажлын урсгал:
1. Үндсэн тэжээл & Цэвэрлэх: Runofmine (Омын) material is fed into a robust scrubbing system designed to break down clay agglomerates and dissolve cemented materials.
2. Хэмжээ тогтоох & Ангилал: The scrubbed ore passes through vibrating screens to separate +2mm to +10mm (тохируулах боломжтой) хэт том (gravel/pebbles) from the valuable fine fraction.
3. Slurry Concentration & Gold Recovery: The undersize slurry, containing liberated gold, is routed to a series of highcapacity gravity concentrators (жишээ нь e., төвөөс зугтах баяжуулах үйлдвэрүүд) for primary gold recovery.
4. Гэрийн ажлын удирдлагын удирдлагменежсаар & Water Handling: Efficient dewatering of tailings and closedloop water recycling systems are integrated to minimize environmental footprint and water consumption.

Хэрэглээний хамрах хүрээ & Хувьсгал:
Саад тохолтол тарз: Ideal for alluvial/placer deposits, eluvial weathered ore, and saprolitic claybound ores requiring intensive washing. Serves as the primary beneficiation step before further processing or direct smelting of concentrates.
Хувьсгал: Хатуу чулуулагт тохиромжгүй (дүүрэх) ore without prior crushing. Performance is contingent on accurate feed characterization regarding clay content, чийг, and particle size distribution.

3. ҮНДСЭН ОНЦЛОГ

HeavyDuty Log Washer/Scrubber | Техникийн үндэслэл: Hightorque rotating shafts with abrasionresistant paddles | Үйл ажиллагааны ашиг тус: Effectively disintegrates tough clays and cemented materials without clogging, ensuring consistent feed to downstream screens | ROI нөлөө: Reduces downtime by up to 30% associated with feed preparation bottlenecks

MultiStage Vibrating Screen Deck | Техникийн үндэслэл: HighGforce linear or elliptical motion with modular screen panels | Үйл ажиллагааны ашиг тус: Provides precise separation of waste gravel from goldbearing fines at high volume; quickpanel change system minimizes maintenance time | ROI нөлөө: Improves screening efficiency by ~15%, protecting downstream concentrators and boosting overall recovery

HighCapacity Centrifugal Concentrator Array | Техникийн үндэслэл: Enhanced gravitational force (Gforce) for fine gold recovery from slurry | Үйл ажиллагааны ашиг тус: Captures fine gold particles down to micron size with high capacity per unit; automated concentrate discharge reduces operator intervention | ROI нөлөө: Increases overall gold recovery by 510% compared to traditional sluicebased systems at this scale

Intelligent Process Water Circuit | Техникийн үндэслэл: Cyclonebased desliming and thickener/clarifier integration | Үйл ажиллагааны ашиг тус: Recycles over 85% технологийн усны; reduces fresh water demand and tailings pond loading | ROI нөлөө: Cuts water procurement and handling costs significantly, crucial for remote sites

500 Tph Gold Mining Washing Plant Factory Quote

Модульчлагдсан SkidMounted дизайн | Техникийн үндэслэл: Preassembled structural skids with integrated piping/wiring | Үйл ажиллагааны ашиг тус: Газар дээр нь суулгах хугацааг хүртэл бууруулна 40%, lowers civil works cost, and facilitates future relocation or expansion | ROI нөлөө: Faster timetoproduction improves capital payback period

Төвлөрсөн PLC хяналтын систем | Техникийн үндэслэл: Programmable Logic Controller with HMI interface monitoring motor loads, pump rates, and feed density | Үйл ажиллагааны ашиг тус: Allows operators to monitor the entire washing plant process from a single station; enables quick response to process upsets | ROI нөлөө: Optimizes power usage and reduces required operational manpower per shift

4. ӨРСӨЛДӨХ ДАВУУ ТАЛУУД

| Гүйцэтгэлийн хэмжүүр | Аж үйлдвэрийн стандарт 500 Tph Plants | Бидний 500 Tph Gold Mining угаах үйлдвэрийн шийдэл | Давуу тал (% Сайжруулалт) |
| : | : | : | : |
| Clay Breakdown Efficiency| Standard trommel scrubbers can struggle with cohesive clays. Patented paddle design ensures thorough disaggregation without shortcircuiting. Field data shows a ~25% improvement in clay dispersion time.
| Fine Gold Recovery Rate (<100 шүүр)| Traditional sluices can experience significant losses at high throughput. Multistage centrifugal concentration captures finer particles consistently. Аж үйлдвэрийн туршилт нь a 712% increase in fine gold recovery.
| Water Consumption (m³ per ton processed)| Openloop systems can use 35 m³/ton. Closedloop circuit with efficient dewatering recirculates process water effectively reduces fresh water makeup by over 60%.
| Дундаж хүртээмж (Үргэлж ажиллах)| ~8590%, factoring in screen changes and scrubber maintenance Robust component design & easyaccess maintenance points improve operational availability >93%.
| Суурилуулах & Ашиглалтын хугацаа| Can exceed 810 weeks for fixedbase plants Modular skid design cuts field erection time by approximately 35%.

5. ТЕХНИКИЙН ҮЗҮҮЛЭЛТҮҮД

Nominal Capacity: 500 Цаг тутамд тонн (хуурай тэжээлийн үндэс)
Уургийн хэмжээ: Up to 250mm (subject to scrubber model)
Цалин зүй: Ойролцоох. 750 900 kw (total connected load), dependent on configuration
Water Requirement: Makeup water typically 300 500 m³/hr within closedcircuit system
Үндсэн материалын үзүүлэлтүүд:
Scrubbing Paddles / Бүس: Highchrome cast iron or AR steel
Дэлгэцийн тавцан / PanelsPolyurethane or rubber modular panels
Slurry PumpsAbrasionresistant rubberlined or highchrome alloy
Бүтцийн ган: ASTM A36 painted or primed for corrosion protection
Физик хэмжээсүүд (Ойролцоогоор., L x W x H): Varies by layout; typical modular footprint ranges from 40m x 20m x 12m.
Байгаль орчны үйл ажиллагааны хүрээ: 20°С-аас +50°С хүртэлх орчны температурт зориулагдсан; dust suppression and noise enclosures available.

6. ХЭРЭГЛЭЭНИЙ СУРТАЛЧИЛГАА

West African Alluvial Gold Operation Challenge:

A largescale placer mine faced severe downtime due to sticky lateritic clays blinding their screening system daily reducing effective throughput below 480 Tph throughput Annualized production increased by an estimated ~22%

South American Eluvial Deposit Challenge:

An operation processing weathered saprolite ore experienced poor fine gold recovery (92% within six months Payback period for the concentrator module was achieved in under five months of operation

7. АРИЛЖААНЫ ХЭРЭГЛЭЭ

Our solutions are offered in tiered configurations based on deposit complexity:

1.
2.Стандарт тохиргооны түвшин: Includes core log washer/scubber vibrating screen deck basic gravity recovery sluice/concentrator standard PLC controls Designed for straightforward gravel/clay mixes Competitive base pricing structure available upon application review
3.Сайжруулсан сэргээх шат: Adds advanced centrifugal concentrator array enhanced desliming cyclones more sophisticated density control systems Recommended for deposits with significant fine or flake gold Optional features include automated sampler systems
4.Full Modular/Mobile Tier: Entire plant mounted on roadtransportable skids or trailers rapid deployment package ideal for contractors or phased mine development 500 Tph Gold Mining Washing Plant Factory Quote

Service packages range from basic commissioning support comprehensive multiyear maintenance agreements including guaranteed spare parts availability Financing options including leasing structures are available through partners enabling preservation of capital liquidity

8.Түгээмэл асуултууд

Q1 Is this washing plant compatible with my existing crushing circuit
A1 Yes it is designed as a downstream process unit It accepts ROM material up its specified feed size typically <250mm If you have primary crushing your crusher product can be fed directly

Q2 What is the expected manpower requirement operate this facility
A2 A welldesigned centralized control system allows efficient operation Typically one control room operator one field technician per shift are sufficient under normal conditions

Q3 How does handle variations feed grade material type
A3 The robust scrubbing system variable speed drives key equipment allow operators adjust retention times Gforces accommodate changes clay content rock hardness within design parameters

Q4 What are lead times delivery commissioning such largescale plant
A4 Following detailed engineering lead times typically range between months depending final configuration complexity Site commissioning supervised our engineers usually requires weeks

Q5 Та гүйцэтгэлийн баталгаа өгч чадах уу
A5 We offer performance guarantees based mutually agreed test protocols using representative bulk sample These guarantees cover critical metrics throughput clay breakup efficiency specified recoveries

Q6 What aftersales service technical support do you provide
A6 We provide comprehensive documentation onsite training initial commissioning Global support network offers spare parts technical advisory services many major mining regions

Q7 Are there options reduce initial capital outlay
A7 Yes we offer several approaches including phased implementation starting lower capacity modules scalable design equipment leasing arrangements through financial partners

Мөрлээ

Зурвасаа энд бичээд бидэнд илгээнэ үү

Мөрлээ