1. OUVERTURE ENTRAÎNÉE PAR POINT DE DOULEUR
Gérez-vous une opération de production de granulats à moyenne ou grande échelle et faites-vous face à des goulots d'étranglement persistants qui érodent la rentabilité ?? The challenges of sourcing a reliable 250300tph stone crushing plant are wellknown to plant managers and engineering contractors. Les obstacles opérationnels courants comprennent:
Débit incohérent: Underperforming plants failing to consistently hit the 250300 ton per hour target, causing project delays and missed delivery schedules.
Temps d'arrêt excessif: Frequent mechanical failures and unplanned maintenance stops, resulting in thousands of dollars in lost production per hour of inactivity.
Coûts opérationnels élevés: Spiking energy consumption from inefficient drives and escalating wear part costs due to suboptimal chamber designs or material flow.
Écart de qualité du produit: Inability to maintain precise control over final aggregate cubicity and gradation, conduisant au rejet du produit ou à une réduction de la valeur marchande.
Limites d'évolutivité: Fixedconfiguration plants that cannot adapt to changing feed material or product specification requirements without major capital expenditure.
La question centrale est: how do you secure a crushing solution that delivers guaranteed throughput, maximise la disponibilité, et offre un retour sur investissement mesurable? The specification of your 250300tph stone crushing plant is the critical determinant.
2. APERÇU DU PRODUIT
A 250300tph stationary stone crushing plant is a complete, integrated processing system designed for highvolume production of aggregates for construction, base de route, et ballast ferroviaire. This tier of equipment is engineered for continuous, heavyduty operation in quarry and mining applications.
Flux de travail opérationnel:
1. Réduction primaire: Matière première de grande taille (jusqu'à 750 mm) is introduced via a vibrating grizzly feeder to a primary jaw crusher for initial size reduction.
2. Secondaire & Concassage Tertiaire: La production est acheminée vers des concasseurs à cône secondaires pour une réduction supplémentaire., with tertiary cone crushers or impact crushers employed for precise shaping and final sizing.
3. Dépistage & Classification: Crushed material is routed through multideck vibrating screens to separate it into specified aggregate fractions (par ex., 05mm, 510mm, 1020mm).
4. Material Recirculation: Oversize material from screens is automatically conveyed back to the appropriate crusher stage in closedcircuit configuration for optimal efficiency.
5. Stockage: Correctly sized aggregates are transferred via conveyor systems to designated stockpiles for loadout.
Champ d'application & Limites:
Portée: Idéal pour les opérations de grandes carrières, grands projets d’infrastructures nécessitant une production de granulats sur place, and dedicated aggregate suppliers serving regional markets. Suited for granite, basalte, calcaire, and other mediumtohard abrasives.
Limites: Nécessite un investissement en capital important et une préparation du site. Ne convient pas aux opérations à petite échelle ou très mobiles. Des performances optimales dépendent d'une configuration correcte de l'installation adaptée aux caractéristiques des matières premières..
3. CARACTÉRISTIQUES PRINCIPALES
Concasseur à mâchoires primaire de grande capacité | Base technique: Cinématique optimisée & reinforced frame structure | Avantage opérationnel: Handles maximum feed size with high reduction ratio, setting a stable foundation for downstream process flow | Impact sur le retour sur investissement: Reduces risk of primary stage bottlenecking; ensures consistent feed to secondary circuit for maximum plantwide throughput.
Réglage hydraulique & Clairière (Concasseurs à cône) | Base technique: Integrated hydraulic systems for CSS adjustment and uncrushable material release | Avantage opérationnel: Enables quick setting changes for different products and automatic recovery from tramp metal events without stopping the plant | Impact sur le retour sur investissement: Minimise les temps d'arrêt pour les changements de produits; prevents catastrophic damage from uncrushables, protecting major component integrity.
Système d'automatisation PLC centralisé | Base technique: Contrôleur logique programmable avec interface homme-machine (IHM) panneau | Avantage opérationnel: Allows operators to monitor and control the entire plant flow, motor loads, and bin levels from a single station | Impact sur le retour sur investissement: Lowers labor requirements; enables proactive adjustment based on realtime data to optimize yield and reduce energy waste.
HeavyDuty Vibrating Screens with Deck Interchangeability | Base technique: High Gforce excitation motors and modular screen media | Avantage opérationnel: Provides efficient separation even with damp or sticky material; allows quick deck changes for different product specifications | Impact sur le retour sur investissement: Maximizes screening efficiency—critical for final product quality—and reduces changeover time from hours to minutes.
Optimized Conveyor Circuit Design | Base technique: Computeraided design of transfer points, belt speeds, and hopper angles | Avantage opérationnel: Minimizes material spillage, génération de poussière, and points of plugging within the system | Impact sur le retour sur investissement: Reduces cleanup labor and maintenance; ensures all crushed material is efficiently transported through the circuit.
Système avancé de suppression de la poussière | Base technique: Strategically placed nozzles creating micronsized water droplets to encapsulate dust particles | Avantage opérationnel: Maintains compliance with environmental regulations while minimizing water consumption compared to basic spraying | Impact sur le retour sur investissement: Avoids costly work stoppages due to regulatory noncompliance; preserves worker health and reduces site water usage costs.
4. AVANTAGES CONCURRENTIELS
| Mesure de performances | Norme de l'industrie (250300Usine de tph) | Notre solution d'usine de concassage de pierre de 250 300 tph | Avantage (% Amélioration) |
|||||
| Disponibilité annuelle | ~85% 90% |> 92% | +3% à +5% |
| Durée de vie des pièces d'usure (Doublures de cône)| Subject to material; souvent 85% | +7% minimum |
| Temps d'installation/reconfiguration | Weeks for major changes Modular design facilitates faster adjustments |30% temps |
5. SPÉCIFICATIONS TECHNIQUES
Capacité de débit conçue: Garanti 250 300 tonnes métriques par heure (à base de granit standard avec une densité apparente ~1,6t/m³).
Exigences d'alimentation: Puissance totale installée environ 550 700 kW. Primary voltage requirement typically at least at least at least at least at least at least at least at least at least at least at least at least at least at least at least at least at least . Requires detailed engineering based on final configuration.
Taille du matériau d'alimentation: Maximum lump size up to ≤750mm edge length.
Gamme de produits finaux: Capable of producing up to five (5) calibrated aggregate fractions simultaneously (par ex., sand plus various stone sizes).
Spécifications des composants clés:
Concasseur primaire: Jaw Crusher Feed Opening ≥900x1200mm
Concasseurs secondaires/tertiaires : Hydraulic Cone Crushers ≥160kW
Écrans : Heavyduty vibrating screens ≥2.4m x6m
Main Conveyors : Largeur de bande ≥800mm
Empreinte physique (Approximatif): Length ~80m –120m x Width ~40m –50m . Highly dependent on layout design .
Plage de fonctionnement environnementale : Designedfor ambient temperaturesfrom 20°Cto+45°Cwith appropriate options available .
6 SCÉNARIOS D'APPLICATION
Défi du projet d’agrandissement de la carrière de granit : An existing quarry neededto double outputto fulfilla major highway contract but faced space constraintsand neededstrict cubicity specificationsfor roadbase layers Solution : Un compact , threestagecrushingplant was configuredwitha primaryjaw , cône secondaire , anda tertiarycone crusherin closedcircuitwithtwo parallel screens Results : Theplant consistentlyachieved295tph throughput . Productcubicityexceeded90%, meetingthe stringentproject specs . The modularlayout allowedinstallationwithin the existingquarry footprint .
Limestone Processingfor Cement & Aggregate Challenge : A minerproducingboth cementplant feedand constructionaggregatesfrom limestone struggledwithfrequentdowntimedue totramp metaland highwear costsin abrasiveconditions Solution : Implementationofa robustcrushingplant featuringmetal detectors , automaticrelease systemsonthe conecrushers ,and speciallyselectedwear linersfor abrasive rock Results : Unplanneddowntime relatedto trampeventswas reducedby over95%. Wear partlife increasedby an averageof22%, significantlyloweringcostper ton . Theplant reliablydelivers280tph split betweenfine millfeedand coarseaggregateproducts .
7 CONSIDÉRATIONS COMMERCIALES
Equipment pricing fora complete250–300tph stationarystonecrushingplant varies significantlybasedonconfiguration , automationlevel ,and ancillarysystems(par ex., dustcontrol sophistication).
Niveaux de tarification :
Base Tier Includesprimary , secondarycrushing& basicscreeningfor2–3 products . Mid Tier Adds tertiarycrushingstage , advancedPLC automation& improveddust suppressionfor4–5 products . Premium Tier Fullyoptimizedcircuitwithsmart diagnostics , premiumwear materials& comprehensiveenvironmentalcontrols .
Fonctionnalités facultatives :
Onboardweighing systems ,
Automatedwear monitoring ,
Hybrid / dieselgeneratorbackuppower module ,
Noiseenclosures .
Forfaits de services :
Standardwarranty(12 monthsonmajor components)
Extendedservice planscoveringplannedmaintenance& parties
Surveillance à distance& diagnostics subscription
Options de financement :
Capitallease ,
Operationallease(tonnagebased),
Traditional equipmentloan structuresare typicallyavailablethroughfinancialpartners .
8 FAQ
Q What if my feedmaterial hardnesschangesafterthe plantis installed?
A Ourplants are designedwithadjustablecrushersettingsanda degreeof modularity . For significantchanges , we canreconfiguredownstreamstagesor recommendlinerprofile changesto maintainoptimalperformancewithoutreplacingthe entireunit .
Q How manyoperatorsare requiredtorun thisplant ?
A WithacentralizedPLC automation system , one trainedoperatorinthe controlroomcan manage the entirecrushingprocess . Additionalgroundpersonnelmay be neededfor routine inspectionsand stockpilemanagementdependingon yoursite layout .
Q Quel est le délai de livraison typique de la commande à la mise en service?
A Fora standardconfiguration , leadtimesrange from6to9months includingengineering manufacturing shippingand foundationpreparation . Timelinescan varybasedoncomplexityandsite readiness .
Q Can thisplant be relocatedin the future?
A Yes while itis astationarysetup key modulesaredesignedfor disassemblyand relocation Major structuralcomponentslike conveyorgalleriescanbe moved thoughit constitutesa significantproject requiringprofessionalplanning .
Q How doyou guaranteethe throughputcapacityof250–300tph?
A Throughputis guaranteedbasedonagreedfeedmaterialcharacteristics(PSD hardness moisture) priorto purchase We providecomprehensivetestreportssupportingour equipmentselectionand canofferperformancecontractsbackedby liquidateddamages
Q What aftersalessupportis provided?
A Supportincludesdetailedinstallationdrawings onsitecommissioningsupervisedby our engineers comprehensiveoperation& maintenancetraining manualsanda globalnetworkof service techniciansfor partsandsupport
Q Are spareparts readilyavailable?
A We maintainstrategicinventoriesof criticalwear partsand components Standardizationacrossour crusherandscreenmodelsensureshighpartscommonality reducingyourrequiredinventoryinvestment