Chine 500 Usines d'usine de lavage d'extraction d'or Tph

Brève description:

1. PAINPOINT DRIVEN OPENING Are you facing escalating operational costs and unpredictable output in your largescale gold mining operation? For commercial buyers and plant managers overseeing hightonnage projects, les défis d'un 500 TPH washing plant are significant: High Downtime from Blockages: Claybound or sticky material can halt your entire processing line, coûtant des milliers par…


Détail du produit

Mots clés du produit

1. OUVERTURE ENTRAÎNÉE PAR POINT DE DOULEUR

Are you facing escalating operational costs and unpredictable output in your largescale gold mining operation? For commercial buyers and plant managers overseeing hightonnage projects, les défis d'un 500 TPH washing plant are significant:
High Downtime from Blockages: Claybound or sticky material can halt your entire processing line, costing thousands per hour in lost production and labor for manual clearing.
Taux de récupération incohérents: Inefficient scrubbing and screening lead to goldbearing fines bypassing recovery circuits, directly eroding your project's profitability.
Eau excessive & Consommation d'énergie: Outdated washing technology consumes unsustainable volumes of water and high horsepower, creating both environmental compliance pressures and crippling utility costs.
Usure rapide des composants: Abrasive feed material degrades liners, écrans, and pump systems prematurely, ce qui entraîne de fréquents, unplanned maintenance shutdowns and high parts inventory costs.

Is your current setup delivering the consistent 500tonperhour throughput your reserve model requires? Are you achieving maximum gold liberation while controlling your most variable operating expenses?

2. APERÇU DU PRODUIT

Le moderne 500 L'usine de lavage de l'or TPH est une installation modulaire, heavyduty processing system designed for alluvial, au bord de la survie, or weathered hard rock deposits. Its primary function is to disaggregate, scrub, and classify ore to prepare liberated gold for downstream concentration (par ex., écluses, centrifugeuses).Chine 500 Usines d'usine de lavage d'extraction d'or Tph

Flux de travail opérationnel:
1. Alimentation principale & Scalping: Runofmine (ROM) material is uniformly fed via apron feeder to a robust scalping screen, removing oversized waste (+75mm) before the scrubber.
2. Gommage intensif & Libération: The core rotary scrubber or trommel uses internal lifters and highpressure water sprays to break down clay matrices and cementation, thoroughly liberating gold particles.
3. Classification précise des particules: Discharged material is screened into multiple fractions (par ex., +10mm gravel waste, 10mm+2mm sand, 2mm slimes). This critical step ensures optimal feed sizing for downstream recovery units.
4. Gestion des résidus & Gestion de l'eau: Efficient slurry pumps and cyclones manage fine tailings streams. Integrated water recovery systems recirculate up to 90% d'eau de procédé.

Champ d'application & Limites:
Portée: Ideal for surface mining operations with claybound auriferous gravels, saprolitic (patiné) dépôts, and alluvial placer projects requiring highvolume throughput.
Limites: Not suitable for competent hard rock without prior crushing. Performance is highly dependent on accurate feed characterization regarding clay content and plasticity.

3. CARACTÉRISTIQUES PRINCIPALES

Épurateur rotatif robuste | Base technique: Hightorque drive system with reinforced lifters and staggered internal spray bars | Avantage opérationnel: Ensures complete ore disintegration with minimal risk of mechanical overload or shaft deflection | Impact sur le retour sur investissement: Reduces cycle time per ton by up to 15% par rapport aux conceptions standards, directly increasing daily throughput.

Conception modulaire BoltTogether | Base technique: Fabricated structural steel sections with precision machined connection points | Avantage opérationnel: Enables rapid onsite assembly by local crews without specialized heavylift welding equipment | Impact sur le retour sur investissement: Réduit le temps d’installation d’environ 40%, accelerating project cash flow.

Système de dépistage avancé | Base technique: Multi-étages, highfrequency vibrating screens with polyurethane or rubber modular panels | Avantage opérationnel: Provides sharp classification efficiency even with damp feed material; panels are replaceable individually | Impact sur le retour sur investissement: Increases fine gold recovery capture by improving screen accuracy; reduces panel replacement downtime by 60%.

Intelligent Water Management Circuit | Base technique: Series of settling tanks/cyclones and variablespeed slurry pumps controlled by density meters | Avantage opérationnel: Maintains optimal process density while maximizing water recirculation; minimizes fresh water intake | Impact sur le retour sur investissement: Can reduce freshwater consumption by over 70%, lowering licensing costs and environmental footprint.

Graissage centralisé & Points de surveillance | Base technique: Manifolded lubrication lines to all major bearings with diagnostic ports for vibration analysis | Avantage opérationnel: Enables preventative maintenance during scheduled stops; extends bearing life in highcontamination environments | Impact sur le retour sur investissement: Lowers unscheduled bearing failure risk by an estimated 80%, ensuring predictable maintenance costs.

4. AVANTAGES CONCURRENTIELS

| Mesure de performances | Norme de l'industrie (500 Usine TPH) | Notre 500 Solution d'usine de lavage d'exploitation minière d'or TPH | Avantage (% Amélioration) |
| : | : | : | : |
| Material Preparation Efficiency| Singlestage scrubbing; basic spray bars| Twostage attrition with optimized lifter angle & pressure wash| More complete clay breakdown; +12% gold liberation rate |
| Consommation d'eau par tonne| ~34 mètres cubes/tonne traités| Integrated closedloop recycling system| <1 cubic meter/ton fresh water required; ~70% de réduction |
| Temps moyen entre les pannes (Roulements critiques)| ~2,000 operational hours| Scellé & graissage centralisé; premium bearings specified| >3,500 heures d'ouverture; +75% durée de vie |
| Durée de l'assemblage sur site| 1620 weeks with specialist crew| Conception modulaire à boulons; modules préassemblés| 1012 weeks with local crew; ~40% time savings |
| Consommation d'énergie par tonne traitée| ~1,8 2.2 kWh/tonne| Moteurs à haut rendement & optimized drum geometry drives consumption down.| ~1.5 kWh/ton; jusqu'à 20% coût énergétique inférieur |

5. SPÉCIFICATIONS TECHNIQUES

Capacité nominale: 500 tonnes métriques par heure (based on specific gravity of ~1.6 t/m³).
Taille d'alimentation maximale: Jusqu'à 250 mm (subject to clay content).
Tambour de récurage: Diameter x Length options from Ø3.6m x 9m to Ø4.2m x 12m based on retention time requirements.
Système d'entraînement: Dual motor + gear reducer configuration; total installed power range: 450600 kW.
Screening Surface: Primary scalper plus secondary multideck vibrating screens; total area ≥50 m².
Spécifications matérielles: Acier résistant à l'abrasion (HARDOX or equivalent) on chutes and liners; polyurethane on screening surfaces.
Besoins en eau: Fresh water makeup typically 8001200 m³/day depending on clay content in feed.
Plage de fonctionnement: Conçu pour des températures ambiantes de 20°C à +50°C.

6. SCÉNARIOS D'APPLICATION

Projet d'or alluvial en Afrique de l'Ouest | Défi: Extremely sticky lateritic clays caused constant plugging in existing scrubber trommel, limiting throughput to <350 TPH with excessive manual cleaning. High seasonal rainfall complicated water management.| Solution: Installation of a purposebuilt 500 TPH washing plant featuring an aggressive doublelifter scrubber section for clay attrition and a primary dewatering screen for initial slimes removal.| Résultats: Achieved consistent design throughput of 480520 TPH within two weeks of commissioning. La disponibilité des plantes est passée de 92%. Water recycling rate reached >85%, mitigating seasonal supply issues.

Southeast Asian Weathered Hard Rock (Saprolite) Opération | Défi: Inefficient classification led to significant gold losses in the 2mm+0.5mm fraction reporting incorrectly to tailings due to screen blinding.| Solution:: Deployment of a modular washing plant utilizing highfrequency Derrick®style screening technology for precise sand fraction separation ahead of gravity concentration.| Résultats:: Metallurgical accounting confirmed a recovery improvement of over 8 percentage points in the target size fraction. The modular design allowed installation on a constrained hillside pad without major earthworks.

7. CONSIDÉRATIONS COMMERCIALES

Nos solutions sont proposées sur trois niveaux principaux:

1.
Pricing varies significantly based on configuration complexity.

Optional features include automated polymer dosing systems for clay handling,
integrated security lighting packages,
kits de démarrage de pièces de rechange,
remote performance monitoring telemetry.

Les packages de services vont de l'assistance de base à la mise en service
through comprehensive annual maintenance contracts
including scheduled inspections,
audits pièces d'usure,
technical training.

Financing options can be structured through partner institutions,
including leasetoown agreements over
3660 mois
or milestonebased project financing.

8.FAQ

T1:
UN:

T2:
UN:Chine 500 Usines d'usine de lavage d'extraction d'or Tph

T3:
UN:

T4:
UN:

Q5:
UN:

Q6:
UN:

Q7:
UN

Laissez votre message

Écrivez votre message ici et envoyez-le-nous

Laissez votre message